Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Use Of Pressure Filter To Eliminate Refuse Slurry Disposal PondBy Dale W. Norris
United States Steel's Cumberland Coal Operations is located in Greene County in the southwest corner of Pennsylvania. The mine and related facilities have been in operation since September of 197
Jan 1, 1980
 - 
                    
                Geology And Apatite Deposits Of East-Central Bahia, BrazilBy Gus H. Goudarzi
The apatite deposits in east-central Bahia, Brazil, are about 50 km east of Serra do Jacobina, between lat. 11° and 12° S. and long. 39°40' and 40° W. Apatite was found and examined at 15 localit
Jan 1, 1972
 - 
                    
                The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply SystemBy Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole
Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands
Jan 1, 2007
 - 
                    
                Analysis Of Real-Time Shield Pressures For The Evaluation Of Longwall Ground Control ProblemsBy K. Saikiran, A. R. Nalla
Longwall management, regular shield maintenance, and evaluation of ground control problems can be performed using real-time shield monitoring program. Based on real-time shield pressure data, evaluat
Jan 1, 2000
 - 
                    
                Lyon–Turin Long and Deep Railway Tunnel ProjectBy P. Fauvel, V. Nasri
In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over
Jan 1, 2005
 - 
                    
                State-of-Art Grouting Remedy for Ground ImprovementBy Faruk Oksuz, Cary Hirner, William A. Rochford
Grouting is a frequently utilized remedy in the planning and implementation of ground improvement and tunnel rehabilitation practice. The state-of-art grouting application used for Chicago’s McCook Re
Jan 1, 2005
 - 
                    
                Planning and Design of the A3 Hindhead Tunnel, Surrey, United KingdomBy Tom Ireland, Tony Rock
The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons
Jan 1, 2007
 - 
                    
                On The Regrind Of Molybdenite Concentrates With A Tower MillBy Juan L. Sepulveda
An MPSI KW-20 Tower mill has been tested at the Butte Molybdenum plant of Anaconda Minerals Company, as a substitute for the conventional 1.5x3.0 m (5x10 ft) tumbling ball mill currently used for regr
Jan 1, 1984
 - 
                    
                East Central Interceptor Sewer, Los Angeles, CaliforniaBy Ted Budd, Vladimir Goubanov
The East Central Interceptor Sewer, commonly known as the ECIS Project, is the largest public works construction project awarded by the City of Los Angeles. The complexity of this $240 million project
Jan 1, 2003
 - 
                    
                Biological Column Leaching Of Three Kids Manganese OreBy D. L. Lampshire
Biological leaching using native heterotrophic bacteria was studied by the U.S. Bureau of Mines as a means of extracting manganese from a domestic low-grade wad ore. Column heap leaching simulation te
Jan 1, 1993
 - 
                    
                A scale model experimental study for estimating the productivity of bulk push dozer operations in hard-rock mining (MME Technical-Paper Abstracts)By MEHMET KIZIL, PETER KNIGHTS, ROYAL REA
A 1/20 scale experimental dozer push test rig was designed and constructed to quantify the expected production rates (loose cubic meters per hour) for dozers operating in hard-rock bulk push applicati
 - 
                    
                Design For Minimum Maintenance Labor And SuppliesBy A. P. Massmann
Design for economical operation, minimum operating labor and minimum maintenance for labor and supplies are virtually inseparable. Each consideration has a vital bearing on the other. Let us assum
Jan 1, 1959
 - 
                    
                Development Of Personal Diesel Aerosol Sampler Design And Performance CriteriaBy B. K. Cantrell, K. L. Rubow
The US Bureau of Mines and the University of Minnesota have developed design and performance criteria for a personal diesel exhaust aerosol sampler for underground coal mines. These are based on the p
Jan 1, 1992
 - 
                    
                The Los Pelambres Overland ConveyorBy Christof Brewka
Los Pelambres, 200 km north of Santiago, Chile, is the latest in a series of mega-projects developed in this part of the world. While most of its predecessors are spread over open desert, the Los Pela
Jan 1, 2000
 - 
                    
                Edmonton South LRT Twin TunnelsBy Steve Skelhorn
Edmonton South LRT is the latest expansion of the Subway system in Edmonton, Alberta, Canada: Consisting of twin 5.8m segmental lined tunnels, 280m long, driven by a Lovat EPB machine. The key challen
Jan 1, 2005
 - 
                    
                Collapse and Remining of Tunnel TO8 at THSRC Contract C230By William Stewart, John Tinkler, Gary B. Hemphill
Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin
Jan 1, 2005
 - 
                    
                A New Design Of Hard Rock TBM'sBy Larry L. Snyder
A compact 4.87 m (16 ft) diameter tunnel boring machine (TBM) is capable of boring a 12.2 m (40 ft) radius curve while gripping horizontally, or vertically, as may be required for the excavation of tu
Jan 1, 1989
 - 
                    
                Manhattan Shaft, New York City Water Tunnel No. 3By Edward (Ted) M. Dowey
Shaft 26B of New York City’s Third Water Tunnel was constructed by Frontier-Kemper Constructors, Inc. of Evansville, Indiana. The 176.8 m (580 ft) deep shaft will serve as the construction shaft for t
Jan 1, 1997
 - 
                    
                Planning and Design for the Westside Light Rail Project Tunnels and Deep Underground Station in Portland, OregonBy D. S. McAllister, P. M. Rice, M. E. Fowler
The Westside Light Rail Project, a major 19.3-km (12-mile) extension of Portland, Oregon's light rail system, includes 4.6 km (2.8 miles) of twin 5.8-m (19-ft) diameter running tunnels, a binocul
Jan 1, 1995
 - 
                    
                Exploratory Shafts For The Nuclear Waste Repository In BasaltBy Birger Schmidt
INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co
Jan 1, 1987