Review of Coal Pillar Lifespan Prediction for the Witbank and Highveld Coal SeamsBy van der Merwem J. N.
"Coal pillars are prone to scaling over time, and are progressively reduced in size and consequently subjected to increased load and reduced strength. The effective factor of safety therefore reduces.
Jan 1, 2016
-
Update Of Coal Pillar Database For South African Coal MiningBy J. N. Van der Merwe
Following the Coalbrook disaster in 1960, research into coal pillar strength resulted in the adoption of the concept of a safety factor for the design of stable pillars in South African coal mining.
Nov 1, 2013
-
Notices (686d7e2f-0deb-4e05-8ce7-255ec396c35f)THE BRITISH COUNCIL AWARDS 1971-1972 The British Council invites applications from permanent residents of the Republic of South Africa and South West Africa, for the following awards: SCHOLARSHI
-
The Effect on the Production of Bantu, Engaged on Tram-Shovelling, of Different Temperature ConditonsBy J. H. Viljoen, J. F. Morrison, C. H. Wyndham
SYNOPSIS Heart rates, oral temperatures, shovels/min and number of 3/4 ton cars/hour trammed over distances of up to 350 ft were measured in samples of 6-10 miners, engaged in tram-shovelling, at 76°
-
Continuous improvement management for mining companiesBy M. Mikolás, L. Pomothy, K. Špakovská, M. Vanek
"Enterprises are faced with increasing economic competition and managers are obliged to look for methods that will ensure a competitive edge in their companies’ markets. These methods include manageri
Jan 1, 2015
-
A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum MinesBy B. P. Watson
Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor
Jan 1, 2004
-
The Assessment Of Rock Cutability, And Physical And Mechanical Rock Properties From A Texture CoefficientBy C. Atilla Öztürk
Determining the cutability and mechanical properties of rocks is vital for the feasibility studies of a mine or tunnel projects. Many scientists have investigated the correlation between these paramet
Jan 1, 2004
-
An Investigation Into The Moisture Absorption Properties Of Thermally Dried South African Fine CoalThe aim of this research was to study the absorption characteristics of thermally dried fine coal from South African collieries. After milling to ?150 µm and pressure filtration, the samples were subj
Jan 1, 2002
-
Zircon characterization—a new approach to an age-old problemCSIRO Mineral has recently developed a new electron microprobe based system for characterizing zircon grains from heavy minerals sand deposits. The system acquires cathodoluminescence (CL) spectra, X-
Jan 1, 2003
-
Current South African Coal Pillar ResearchBy B. J. Madden
Over 206 million tons of hard coal were mined in South African collieries in 1996. Some 132.5 millions tons came from underground operations and approximately 120 million tons came from bord-and-pilla
Jan 1, 1998
-
MINATAUR?: The Mintek Alternative Technology To Gold RefiningBy S. A. Scott
Mintek developed the MinataurTM leach-solvent extraction-precipitation technology as a cost effective, easily operated alternative to conventional gold refining processes. The technology was first com
Jan 1, 2004
-
Method statement for Excavation of Powerhouse Cavern Considering Mudstone Layers in Masjed Soleiman DamBy M. Shahabi, M. Kashfi
This paper briefly describes the excavation procedure of a powerhouse, comprising of its incremental excavation, reinforcement measures, and the installed monitoring system. During the first phase of
Jan 1, 2003
-
Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6)By P. N. Lategan
Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m
Jan 1, 2009
-
Shaft Sinking Scheduling/Planning - IntroductionBy P. N. Lategan
Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m
Jan 1, 2009
-
J Acid Plant Capacity Increase - 1. Introduction (051a043e-f305-48fb-ad24-f55a41bf653a)By Siyabonga Malevu
Chemical Initiatives? Umbogintwini plant is the production facility of Chemical Initiatives? business. Umbogintwini?s J Plant manufactures sulphuric acid. The plant was designed and built by Simon Car
Jan 1, 2009
-
A short history of the development of tapping equipmentBy A. Dienenthal
"The casthouse floor has always been one of the most dangerous working places on a blast furnace or a ferro-alloy/nonferrous furnace. Apart from working in an atmosphere including toxic gases, fumes,
Jan 1, 2014
-
Heat-constrained modelling of calcium sulphate reductionBy L. A. Jordan, D. van Vuuren
A two-dimensional finite difference model has been developed to describe the reduction of kilogram quantities of dehydrated phosphogypsum. The model’s scope has been limited to focus on the heat trans
Oct 1, 2022
-
Processing of a refractory concentrate with high gold content in sulphides and rock-forming minerals, А.Y. Senchenko, Y.G. Seredkin, А.V. Aksenov, and А.А. VasilievBy А. А. Vasiliev, Y. G. Seredkin, А. V. Aksenov, А. Y. Senchenko
Refractory gold-containing concentrates usually contain gold enclosed in sulphides as well as in rock-forming minerals. Another difficulty is that gold often occurs as very fine inclusions of several
Jan 1, 2020
-
Deportment of Gold and Silver in the Pinos Altos Composite and Leach Residues: Implications for Recovery ImprovementA mineralogical study was conducted on the feed (3.51 g/t Au and ~90 g/t Ag) and four leach residue samples (assaying 0.09 to 0.19 g/t Au and 30.0 to 61.5 g/t Ag) from the Pinos Altos silver-gold depo
Jan 1, 2009
-
Removal Of Unburned Carbon From Fly Ash Using A Cyclonic-Static Microbubble Flotation Column - SynopsisBy Y. J. Cao
The purpose of this study was to investigate the flotation behaviour of unburned carbon in a cyclonic-static microbubble flotation column (FCSMC). The ash sample, collected from a power station in Gua
Jan 1, 2012