Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the NetherlandsBy Paul M. C. B. M. Cools, Martin Th. van Staveren
In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i
Jan 1, 2017
 - 
                    
                Innovative Deep Foundation Support Using Ductile Iron PilesBy Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi
"Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site
Jan 1, 2016
 - 
                    
                Development of Environmental Double Pile (EDP) for Improvement of Contaminated Soft GroundBy Hyunsuk Yoon, Kiho Lee, Juhyng Lee, Younghoon Jung, Junboum Park
"The environmental double pile method is presented as a device to improve the engineering properties and to clean up contamination of low-permeability soil. This method is one of the novel technologie
Jan 1, 2005
 - 
                    
                Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
 - 
                    
                Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope StabilizationBy Yan Lap J. Kan
"A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high
Jan 1, 2016
 - 
                    
                Wick Drains into the unknownBy Brian McGlynn
There are many factors that can result in a site characterization being limited. For example, a client may undervalue the importance of a good geotechnical report, or an owner may feel that it would t
May 1, 2023
 - 
                    
                Design Of The Drilled Shaft Foundations For The Cooper River BridgeBy Liang Shen
The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South
Jan 1, 2013
 - 
                    
                An Overview Of Augered, Cast In Place Piles In Florida - IntroductionBy Kirk A. Mcintosh
Augered, cast-in-place (ACIP) piles have been utilized in the United States for a wide range of projects since the 1950's. Due to the cast-in-place nature of the installation method (and lack of
Jan 1, 1997
 - 
                    
                Design Of Cooper River Bridge FoundationsBy Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
 - 
                    
                Design Of Axially Loaded Compression Piles According To Eurocode 7By Bauduin C. Besix
The Eurocode 7 "Geotechnical Design" is based on "Limit State Design", tackling the uncertainties as much as possible at their source through: - selection of characteristic values of variables (load
Jan 1, 2002
 - 
                    
                Deep Mixing Technologies for Lateral Support SystemsBy W. Sondermann
"AbstractWith the increasing demand in reuse of inner city areas and the urgent need for deeper foundation pits under cramped circumstances, adjacent structures close to and high ground water level, t
Jan 1, 2014
 - 
                    
                Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? IntroductionBy Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
 - 
                    
                TPT Piling System - An Introduction To TPT PilesBy Stan Merjan
Composite piles with precast concrete tapered pile tips (TPT Composite Piles - U.S. and foreign patents) are a new and important addition to the piling types available to the construction industry. TP
Jan 1, 1987
 - 
                    
                Pile Settlement Design Using Continuous Surface Wave Testing And Modulus DegradationBy Hennie F. T. Barnard
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
 - 
                    
                Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
 - 
                    
                Deep Excavation Support – Shangri-La – TorontoBy Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
 - 
                    
                Driven Piles In Central Texas Expansive SoilsBy Clayton A. Signor
Abstract: Expansive soils cause more damage to structures annually than a combination of other major natural disasters. Because of the cost to our society, all means and methods need to be fully expl
 - 
                    
                Ralston Dam Spillway Stability Over Pierre ShaleBy Gokhan Inci
Stability problems with dam spillways on existing landslides and appropriate mitigation measures to remedy them are ongoing concerns for geotechnical engineers. The first successful application of dri
Jan 1, 2007
 - 
                    
                PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
 - 
                    
                Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017