Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Army Corps Mega Projects Benefits From Innovative FoundationsBy Dale Berner, Michael O’Sullivan
"This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr
Jan 1, 2017
-
Present To Future Design Considerations Of Deep Foundations ? 1. IntroductionBy William S. Gardner
It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac
Jan 1, 1991
-
Deep Foundations On Deer IslandBy Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific OceanBy Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)By Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2013
-
Tapertube ™ PilesBy Alexander Filotti, Stanley Merjan
"Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge
Jan 1, 2014
-
Bending Strength Of Threaded Micropile ConnectionsBy Steven R. Musselman
The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross
Jan 1, 2007
-
Comparison of a and ß Methods with CPT and Pile Load Test Data: A Case Study with Attention on Soil Setup EffectsBy Mohammadreza Khanmohammadi, Kazem Fakharian
"AbstractIn driven piles, the gradual dissipation of excess pore water pressure and consequently the soil setup significantly contribute to increasing the pile capacity with time. The question is rise
Jan 1, 2014
-
Nonlinear Response of Piles with Rigid Embedment: Lessons Learned from a Reduced- Scale ExperimentBy Camilla Favaretti, Benjamin Turner, Anne Lemnitzer
Pile foundations are extensively used in the construction of various types of superstructures, including tall buildings, bridges, freeways and offshore structures. A fully constrained tip embedment su
Jan 1, 2018
-
Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi
"A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t
Jan 1, 2017
-
San Francisco-Oakland Bay Bridge: OPA WinnerBy Gerry Houlahan
"The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa
Jan 1, 2015
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling MethodBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Underpinning Atlanta International Airport Concourse E for APM Tunnel ExtensionBy Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith
"Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access
Jan 1, 2017
-
Suction Bucket InstallationBy Avi Shonberg
With the advancement of offshore wind farm projects towards deeper waters and larger wind turbine generators, founda- tion solutions other than the monopile have received increasing attention over the
Jul 1, 2022
-
Woodrow Wilson Bridge CofferdamsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2005
-
Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - IntroductionBy Nino Catalano
The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso
Jan 1, 1994
-
Instrumentation And Interpretation ? IntroductionBy H. Mori
The session chairman, Dr. H. Mori, welcomed the delegates to Discussion Session 8. AUTHORS PRESENTATIONS 1 . G. Price, Building Research Establishment. UK Mr. Price expanded on the content
Jan 1, 1991
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, LaBy Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992