Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And MeetingBy Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
Behavior Of Piled Raft Foundation Systems Under A Combined Set Of LoadingsBy Renato P. Cunha
The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa
Jan 1, 2006
-
Soil Freezing Under A Volcano: The Naples Piazza Garibaldi Experience Using Directional Drilling For Long BoreholesBy D. Vanni
Constructing new infrastructure in urban areas increasingly entails the use of sophisticated techniques for soil improvement in order to minimize surface disturbances in adjacent areas and damage to e
Jan 1, 2006
-
Soil Improvement Using Soil Mixing – An Alternative Way for the Indian MarketBy Franz-Werner Gerressen
"The use of soil improvement to utilize areas, which are not suitable for foundation purpose, has a long tradition. Due to the increasing demand of foundation works in areas of unsuitable soils, the i
Jan 1, 2017
-
Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017
-
Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, TorontoBy Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group TechnologyBy Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge PiersBy Leonardo Massone
The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r
Jan 1, 2012
-
Field Test of Electroosmosis with the Injection of Saline Solution of Taipei Silty ClayBy Chang-Yu Ou, Shao-Chi Chien, Hsuan-Hsiang Chang
"A field test was performed to investigate the applicability of electroosmosis with the injection of saline solution of Taipei silty clay. The calcium chloride solution and sodium silicate solution we
Jan 1, 2005
-
Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground MetroBy Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani
With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s
Nov 1, 2022
-
Experiences From A Large Scale Driven Precast Piling Project In IndiaBy Rajesh A. Vaidya
A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere
Jan 1, 2007
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Soil Nail Stabilisation For A 14.5m Deep Excavation At Uncontrolled Fill GroundBy Shaw-Shong Liew
This paper presents the processes of investigation, analysis, design, construction and monitoring of soil nail stabilisation work to facilitate a 14.5 m deep excavation at an uncontrolled fill ground.
Jan 1, 2006
-
“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall ConstructionBy Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
1785 Massachusetts Ave. NW, Washington, D.C.By Daniel Stevenson, Richard Guenther
"The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us
Jan 1, 2017
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Mindful Monitoring Of A Variable Excavation Support SystemBy B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior
A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019