Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained SoilsBy W. Morgan NeSmith
A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun
Jan 1, 2008
-
Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? IntroductionBy Ronald E. Walkington
The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,
Jan 1, 2001
-
Session 12 "Deep Mixing Method II"By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
Session 14 "Deep Mixing Method III"By Stefan Dahlin
The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation
Feb 10, 2003
-
Analysis of Panel and Pile Verticality and Overlap in a Project Information Management SystemBy Jamey Rosen, Georgette Hlepas
Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa
Sep 8, 2021
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Session 18 "Grouting for Micropiles & Anchors"By Jim Bruce
No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc
Feb 10, 2003
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction (50051f21-259c-48c8-b98a-08fa9c39001e)By Michael Arnold, Robert Bachus, Michael Bracher, Jamey Rosen, Robert Roff
"For a high hazard USACE facility, the Center Hill Dam in Tennessee, several disparate streams of data were compiled into a single geospatial and relational enterprise data management system to store,
Jan 1, 2017
-
Inelastic Response Of Extended Pile Shafts In Laterally Spreading Ground During EarthquakesBy Arash Khosravifar
The seismic design of extended pile shafts for the combined effects of dynamic shaking and liquefaction-induced lateral spreading is investigated using nonlinear dynamic finite element analyses (NDA).
Jan 1, 2010
-
Dynamic Testing Of Model Piles - A Laboratory Study - SynopsisBy P. Srinivasulu
The popular theoretical models used for assessing the dynamic behaviour of piles under vertical and lateral excitations are critically reviewed. An experimental study is presented on model piles with
Jan 1, 1996
-
Methods Of Dewatering And Ground Water Control ? SynopsisBy J. P. Powers
Methods for dewatering and the control of ground water for construction and mining are discussed, including open pumping; predrainage with deep wells, wellpoints or other systems; cutoff or exclusion
Jan 1, 2010
-
Rock Socket Piles In The Sherwood Sandstone Of Central BirminghamBy L. J. Whitworth
Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham
Jan 1, 1989
-
Theory And Practice Of Pile Foundations ? SynopsisBy G. G. Meyerhof
The paper reviews the state of the art of estimating the bearing capacity and settlement of pile foundations in sand and clay soils, including the effects of pile installation, scale effects of pile s
Jan 1, 2010
-
Pier Design And Construction In Water Bearing Soils ? SynopsisBy C. N. Baker
The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig
Jan 1, 2010
-
Design Method For Bridge Abutment Foundation Piles Subjected To Lateral Earth Pressure ? SynopsisBy T. Matsui
Many existing bridge abutments on the soft ground laterally move and their many damage examples have been reported. An essential cause for the troubles of the lateral movements may be the lack of exam
Jan 1, 2010
-
Foundation Code8 And Linit 8tatb Partial Factoring - SynopsisBy W. G. K. Fleming
The codification of foundation design and construction is a subject of extensive discussion in Europe and all current code proposals are based on limit state partial factoring. For simplicity, it is c
Jan 1, 1996
-
Pile Foundations In Liquefiable Soils - A Case Study - SynopsisBy R. K. M. Bhandari
Geotechnical investigation for a LPG plant located in Assam state - an area of high seisimicty - revealed a layer of loose to medium silty sand susceptible to liquefaction at some depth below the fini
Jan 1, 1996
-
Safe Load Of A Single Pile In Earthquake Loading - SynopsisBy Shamsher Prakash
Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t
Jan 1, 1996
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022