Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Microstructure and Mechanical Properties of Alsi10Mg Permanent Mould and High Pressure Vacuum Die Castings

    By Z. Zhang, M. -Y. Liu, X. -G. Chen, F. Breton

    "The microstructures of AlSi10Mg foundry alloy in permanent mould (PM) and high pressure vacuum die (HPVD) castings were analyzed and compared. The as-cast microstructures of two castings mainly consi

    Jan 1, 2018

  • CIM
    Technical and economic comparison of continuous and discontinuous loading in underground ore production and tunneling

    By Egon Berger

    "In recent years the trend in underground metal mining has been toward ever increasing blasts (often in excess of 100 000 tonnes per blast). The Canadian mining industry has been in the forefront of t

    Jan 1, 1989

  • CIM
    Stamp-Milling and Amalgamation Practice at Goldenville, N.S.

    By E. H. Henderson

    Introduction Stamp-Milling and amalgamation is, perhaps, one of the oldest processes of recovering gold from its ores. Many papers, theses, and textbooks have been written on the subject of stamp-mil

    Jan 1, 1935

  • CIM
    Case Study - Ventilation Duct Criteria Pros and Cons How to Effectively Lower Operating Costs during the Tender Process

    By J. Holtzhausen

    "An analysis of operating costs for underground mining operations in the current global economic climate considers the financial burden for a ventilation system to be in vicinity of 30–50%. These oper

    Jan 1, 2019

  • CIM
    Overview of the Oil Sands Caprock Integrity Project

    By Kristine Haug

    Although most in situ operations in Alberta do not encounter significant problems during resource extraction, there have been a few documented occurrences of oil or steam releases as a result of compr

    Jun 1, 2012

  • CIM
    Flin Flon Open Pit

    By M. A. Roche

    The property of the Hudson Bay Mining & Smelting Company, Limited is located at Flin Flon lake, 85 miles northwest of The Pas, Manitoba, on the Manitoba-Saskatchewan boundary. The area is at latitude

    Jan 1, 1933

  • CIM
    Geology and Ore Deposits of the Zeballos Area, British Columbia

    By John S. Stevenson

    ZEBALLOS is a relatively new mining camp. It is on the west coast of Vancouver island, approximately 195 nautical miles northwestward from Victoria. Previous to 1934, a small amount of placer gold had

    Jan 1, 1939

  • CIM
    Stadacona Mine

    By W. R. McQuarry, M. E. Wilson

    "The structural relations of the ore deposits of the Staclacona mine are of considerable interest, for they not only illustrate the effect of a change in competence of the wall-rock, but also the effe

    Jan 1, 1954

  • CIM
    Cochenour Willans Mine (814c434a-01ee-4d21-97b6-2bee5eccf8f8)

    By J. P. Nowlan

    "This paper is an attempt to outline the structural problems at the Cochenour Willans mine, in so far as their details have been tentatively worked out. It must be emphasized that there are considerab

    Jan 1, 1954

  • CIM
    McKenzie Red Lake Mine

    By H. Clare Horwood

    "Three types of structures, the main shear zone, the north shear zone, and a series of hanging-wall fractures, contain all the orebodies so far discovered at the McKenzie Red Lake mine. Lenses and vei

    Jan 1, 1954

  • CIM
    The Importance of Coal in Meeting the Energy Needs of the World

    By L. Gawlik

    Since the beginning of the 20th century, coal has been the world?s main source of primary energy. In the last few decades, consumption of coal has gradually decreased in some European countries and el

    Aug 1, 2013

  • CIM
    Positive Pressure Ventilation System Conversion at Diavik Diamond Mine

    By C. Robinson

    The Diavik Diamond Mine is located in one of the most remote and forbidding places in the world, 220 kilometres south of the Arctic Circle and on the bed of a vast northern lake, Lac de Gras. A single

    Aug 1, 2013

  • CIM
    Geology and Geochemistry of the Águas Claras and Pico Iron Mines, Quadrilátero Ferrífero, Minas Gerais, BRAZIL

    By Carlos Alberto Spier

    The Águas Claras and Pico mines are two world-class, iron-ore mines hosted within Lower- Proterozoic banded iron-formations (locally known as itabirites) of the Minas Supergroup located in the Quadril

    May 1, 2003

  • CIM
    Forming a View of the Rock Mass Strength of Hawkesbury Sandstone from Tunnelling Case Histories

    "This paper presents results of ongoing research being carried out at the University of New South Wales into improved methods for estimating rock mass strength. In this paper the rock mass strength of

    Jan 1, 2015

  • CIM
    A Numerical Model for Fracture Propagation Leading to Primary Fragmentation in Block Caving Mines

    By M. Nejati, A. Paluszny, R. W. Zimmerman

    A numerical method is proposed to propagate multiple discrete fractures leading to primary fragmentation in a mine that is being worked using block caving. Deformation is computed using the finite ele

    Jan 1, 2015

  • CIM
    Designing of the Grinding and Classification Systems for Increasing the Concentrate Iron Grade in 4th Production Plant at Golgohar Mining and Industrial Company

    By Jamal Jafari, Abbas Sam

    "The concentration of the fourth production line at Golgohar includes 66% iron with Blaine number of 500 cm2/g. For pelletizing process, the feed iron grade should be greater than 68% with minimum Bla

    Jan 1, 2016

  • CIM
    Experimental Study for Efficient use of RFID in Construction

    By Ali Montaser

    This paper presents an experimental study conducted to facilitate the use of RFID on construction job sites. The study focuses on deployment settings to provide data acquisition with higher accuracy f

    Aug 1, 2013

  • CIM
    Geochemical and Groundwater Factors Contributing to the Corrosion of Rock and Cable Bolts – An Experimental Study

    By H. L. Ramandi, P. Moore

    "The corrosion of support bolts in underground mines has become an increasingly prevalent issue over the past two decades. With an increase of premature failures due to Stress Corrosion Cracking (SCC)

    Jan 1, 2017

  • CIM
    Use of Numerical Methods, Scale-Up and Lab Tests in the Design of HPAL Autoclaves

    By J. Jung, W. Keller, A. Zucht

    "The agitator design for nickel high pressure acid leach autoclaves (HPAL) is critical with regard to the process result, i.e., the recovery rate. Further considerations during the design phase are th

    Jan 1, 2012

  • CIM
    Centrifuge model studies for backfill design at Westmin Resources Limited, H.W. Mine

    By R. J. Mitchell

    "Centrifuge modelling of earth structures is a well-proven technique for evaluating the performance of prototype structures using physical models. The applications of this technique have increased dra

    Jan 1, 1987