Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Electrochemistry of Gold-Platinum Alloys

    By Heinrich Möller

    The electro-oxidation of 0.1 M ethylene glycol at gold, platinum and gold-platinum alloy electrodes in different heat treatment conditions has been studied in 0.5 M NaOH, at room temperature. Poisonin

    Oct 1, 2003

  • CIM
    Owl Creek Processing Summary

    By O. Matwijenko

    "1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with

    Jan 1, 1988

  • CIM
    Nineteenth supplement-January to December 1982; Bibliography of Canadian contributions in the field of rock mechanics

    By P. E. Weidmark

    "CANMET InformationPART 1-Published PapersAsmis, H. W., ""The dynamic response of caverns in discontinuous rock""; Proc 22nd U.S. Symposium on Rock Mechanics, Cambridge, Mass, June 1981, 272-277; 1981

    Jan 1, 1983

  • CIM
    Real Behaviour Of Thickened Tailings

    By C. Cano

    One of the main concerns within the mining industry is to minimize the impact of tailing facilities to the environment and nearby communities. Since the implementation of the first thickened tailings

    Jan 1, 2007

  • CIM
    Mineralogical and Metallurgical Study of the Mike Cu-Au(-Zn) Deposit, Carlin Trend, Nevada

    By Jaeheon Lee, Junmo Ahn, Isabel F. Barton

    "Newmont’s Mike prospect, currently undeveloped, is a blind Cu-Au(-Zn) deposit on the Carlin Trend, containing >8.5 M oz. Au, 1027 M lbs. Cu, and 809 M lbs. Zn as Carlin-type gold and polymetallic Cu-

    Jan 1, 2017

  • CIM
    Modifying the Design of Drying Chamber Flights of the Gol-E-Gohar Pelletizing Plant Ball Mill

    By S. Banisi, A. R. Hasankhoei, Gh. Parsapour, A. R. Ghasemi

    At the Gol-E-Gohar mining and industrial Company, a pelletizing plant, which includes two parallel dry closed grinding circuits and a pellet production circuit, produces 600 t/h. Each grinding circuit

    Jan 1, 2016

  • CIM
    Polaris Update

    By A. J. Keen

    "Cominco's Polaris Mine is an underground lead/zinc operation located on Little Cornwallis Island in the Canadian High Arctic. Polaris is the world's most northerly base metal mine, situated

    Jan 1, 1992

  • CIM
    Evaluation of Spent Alkaline and Zinc-Carbon Battery Recycling Using Ascorbic Acid, Activated Carbon and Guar Meal Reductants

    By S. Kursunoglu

    The aim of this study was to investigate the effectiveness of Ascorbic (C6H8O6) Acid (AA), Activated Carbon (AC) and Guar Meal (C6H12O6) (GM) as a reductant for the simultaneous complete dissolution o

    Aug 1, 2013

  • CIM
    Kearl Oil Sands Project Overview

    By Scott Hommema

    ? Bitumen in the oil sand averages Bitumen 12 wt%; water makes up 4 wt% ? Imperial Oil (operator) and ExxonMobil developing Kearl Leases #6, 36, 87 (~200 sq. km) ? Target resource > 4 Billion Bar

    May 1, 2008

  • CIM
    Predicting Patterns of Slurry Flow within and Discharge from a 3D Pilot SAG Mill

    Slurry flow, including flow through the charge, through the discharge grates, along the pulp lifters and its discharge from the mill is an important contributor to the efficiency of the grinding proce

    Jan 1, 2012

  • CIM
    Predicting Patterns of Slurry Flow Within and Discharge from a 3D Pilot SAG Mill (421a1a4c-1533-4b20-9683-7c7c442899ac)

    Slurry flow, including flow through the charge, through the discharge grates, along the pulp lifters and its discharge from the mill is an important contributor to the efficiency of the grinding proce

    Jan 1, 2012

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • CIM
    Roadbeader excavation in consolidated rockfill at Kidd Creek Mines

    By V. C. Wittchen, T. R. Yu, J. E. Croxall

    "The consolidated rockfill at Kidd Creek Mines is a weakly cemented, minus 15 cm aggregate which posed problems for conventional drill/blast drifting methods. Consequently, lateral access to mineable

    Jan 1, 1990

  • CIM
    Incremental Process Improvements at the Pogo Mill

    By J. Sliwinski, H. Kikutani, J. Atwood, D. Larimer, J. Pyecha

    "The Pogo mine start-up milling targets of 2005 are vastly different than the targets of today. Improvements have been driven by unintentional design oversight, continual circuit optimization or optim

    Jan 1, 2017

  • CIM
    Surface Till Geochemistry and Implications for Exploration, Black River-Matheson Area, Northeastern Ontario

    By M. B. McClenaghan

    "Abstract - The Matheson area of northeastern Ontario is of great interest for mineral explo­ ration because of its geological similarities with the adjacent Timmins, Kirkland Lake and Larder Lake gol

    Jan 1, 1992

  • CIM
    A Method to Downscale Joint Surface Roughness and to Create Replica Series using 3D Printed Molds

    By A. Hartikainen, M. Rinne, F. Johansson, R. Yorke, L K. T. Uotinen, E. Korpi, J. Antikainen

    "In order to determine the in-situ shear strength of rock joints, large scale testing is required. However, this is both expensive and difficult to execute. One possible method to overcome this may be

    Jan 1, 2015

  • CIM
    Mining (e7ac18b4-67b5-4874-86f7-745272387544)

    By Gillyeard J. Leathley

    The Cassiar Asbestos mine is situated on McDame Mountain in northern B.C. at a mean elevation of 6000 ft (1830 m), some 6 miles (9.6 km) from the townsite /mill complex. Asbestos ore production averag

    Jan 1, 1978

  • CIM
    Till Geochemistry in Areas of Thick Drift and its Application to Gold Exploration, Matheson Area, Northeastern Ontario (62c7f132-cf18-4360-a616-5b6ce67e7217)

    By M. B. McClenaghan

    "The Ontario Geological Survey completed a regional till sampling project between 1984 and 1988 in the Black River Matheson (BRiM) area of northeastern Ontario. The project was designed to aid mineral

    Jan 1, 1994

  • CIM
    A modified accumulator method for measuring surface radon flux from a uranium tailings pile

    By T. P. Lim, N. K. Davé

    "A modified accumulator method was devised to measure surface radon flux from porous media. It consists of a collector hood type of accumulator with a homogenizer pump and a pressure balancer. The lat

    Jan 1, 1982

  • CIM
    Dust Control at Granisle Copper

    By L. W. Hamel

    "DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ

    Jan 1, 1976