Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Measurement of Oxygen Transfer Rate with an EKATO Gassing Agitator in a 5 M3 Pressure Vessel

    By J. Ji

    Oxygen requirement during acidic pressure oxidation of sulphide concentrates can he as high as 800 kg/(m3.h) in the first compartment of an autoclave when the total oxidation residence time is shorten

    Jan 1, 2004

  • CIM
    Rabbit Lake project - milling and metallurgy

    By w. w. Milde

    "Since its startup in 1975, the Rabbit Lake mill has been modified (0 process both increased tonnage and higher grade ore. Ore initially came from the Rabbit Lake pit . In 1985, a major mill expansion

    Jan 1, 1989

  • CIM
    Volcanological Reconstruction of the Corbet Breccia Pile, and Cu-Zn Massive Sulfide Deposit, Noranda, Quebec

    By M. Labrie, H. L. Gibson, G. Doiron, J. J. Watkins, D. H. Watkinson

    Abstract -The Corbet deposit is one of 17 proximal Cu-Zn massive sulfide deposits located. within the Noranda Cauldron which occurs within the core of the Noranda Volcanic Complex. The deposit is loca

    Jan 1, 1993

  • CIM
    Electrochemical Investigation of the Effect of Dissolved Oxygen on Gold Cyanidation in the Presence of Sulfidic Refractory Ores

    By M. Epiney, A. Ghahreman, R. Kim1and

    "In the presence of sulfidic refractory ores, increasing the dissolved oxygen (DO) concentration can positively affect the gold leaching rate. To identify the role of DO in gold cyanidation, electroch

    Jan 1, 2017

  • CIM
    Influence of Different Organic Additives on Zinc Electrowinning from Acidic Sulphate Electrolyte

    By E. Ghali, W. Zhang, G. Gabra, N. Sorour, G. Houlachi

    The additives polyacrylamide, 1-Butyl-3-methylimidazolium chloride, Tetra-butylammonium bromide, Benzalkonium chloride and chitin are evaluated during zinc electrolysis from synthetic acidic sulphate

    Jan 1, 2015

  • CIM
    Ohmic Resistance Control For Copper Tarnishing Process

    By D. M. Bastidas

    The reduction of copper sulfide and copper oxides originated during artificial tarnishing of copper was studied using potentiodynamic potential/current density experiments. Six copper surface treatmen

    Jan 1, 2007

  • CIM
    Shear Strength and Stiffness of Bedding Planes and Discontinuities in the Immediate Roof Rocks Overlying the No 6 Coal Seam in Illinois

    By S. Bastola, Y. P. Chugh

    "This research determines shear strength and stiffness properties of bedding planes and joints in the roof strata rocks within 7.5 to 9 m (25-30 ft.) overlying the Illinois #6 coal seam (within the pr

    Jan 1, 2015

  • CIM
    Geology of the Voisey’s Bay Ni-Cu-Co Deposit, Labrador, Canada

    By Rosie Moore, Harvey Keats, Kerry Sparkes, A. J. Naldrett

    "Abstract-The Voisey’s Bay Ni-Cu-Co deposit was discovered in late 1994 as the result of prospecting initiated in the summer of 1993. By July 1995, proven mineable reserves were 31.7 x 106 tonnes grad

    Jan 1, 1996

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • CIM
    Truck-haulage economics of mining open pits by high bench

    By Zhongxue Li

    This paper reviews an analytical model that defines the relationship of weight-weighted or volume-weighted average haulage distance with bench height and other related parameters, presents the optimum

    Jan 1, 1995

  • CIM
    Boundary Dam Mine

    By J. Keith Haddock

    "Introduction The Boundary Dam Mine is located 5 km south of the City of Estevan, Saskatchewan and is operated by Manitoba and Saskatchewan Coal Company Ltd., one of the Luscar companies. The entire p

    Jan 1, 1985

  • CIM
    Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal project

    By S. A. G. Poppen, J. Konopka

    "Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.

    Jan 1, 1983

  • CIM
    Design and Application of New Series of Large Shaft Sinking Headframe

    By Z. Q. Liu, J. M. Du

    "On the basis of analyzing current design and applications, the structure form, working loads and design principles of shaft sinking headframe are summarized in this paper. To overcome the insufficien

    Jan 1, 2019

  • CIM
    Investigation of an active noise control system to reduce the noise emitted by an industrial stack

    By Martin Bouchard, Bruno Paillard, Jean-Claude Dubé, André L’Espérance

    "A precise analysis of the noise emitted by an aluminum plant has shown that one of the main sources of noise is the noise emitted by an exhaust stack 40 m high and 1.8 m diametre, emitting a pure ton

    Jan 1, 1997

  • CIM
    Recent electric furnace developments at Falconbridge (Sudbury Operations)

    By J. Chao, C. Tan, N. Stubina

    "Since J978, Falconbridge Limited has operated two electric furnaces at its nickel-copper smelter in Sudbury. As part of its S02 Abatement Program, the smelter has undergone many changes over the last

    Jan 1, 1994

  • CIM
    Commissioning of the Ekati Diamond Mine

    By Mike Rylatt

    "The BHP Diamonds Inc. and Blackwater Group (Dia Met Minerals Ltd., Charles Fipke and Stewart Blusson) joint venture began production at Canada=s first diamond mine during the last quarter of 1998.Con

    Jan 1, 1999

  • CIM
    Use of fly ash in backfill at Kidd Creek Mines

    By T. R. Yu, D. B. Counter

    "In an effort to increase productivity, the use of fly ash as a binder for consolidated backfill was studied. From laboratory and underground tests f or its cementitious properties and environmental e

    Jan 1, 1988

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • CIM
    Selective Extraction of Copper from Copper Concentrates Containing High-Arsenic under High Pressure Oxidative Leaching

    By Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama

    In this study, the dissolution behavior of copper and arsenic from five different copper concentrates containing 21-34.7 %wt. of Cu, 1.3-7.3 %wt. of As and 15.6-27.5 %wt. of Fe were investigated under

    Jan 1, 2019

  • CIM
    Mineral processing, research and development projects in Nova Scotia conducted through the Canada/Nova Scotia Mineral Development Agreement

    By D. M. Doyle, P. J. Hannon

    "The Canada/Nova Scotia Mineral Development Agreement (M.D.A.) is a subsidiary of a five-year Economic and Regional Development Agreement, signed on June 11, 1984. The objectives of the M.D.A. are to

    Jan 1, 1987