Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Water Treatment at the Waihi Gold Mine

    By B Twidle, D Bertoldi, J Meikle, R Dunne

    The Waihi Gold Mine is situated in a high rainfall area (annual average of over 2 m) on the North Island of New Zealand. Water treatment and discharge at the mine has been ongoing for the last 25 year

    Sep 26, 2013

  • AUSIMM
    Design and Construction of the New Car Dumper Facility for the Dampier Port Upgrade Project

    By A Radici, M Attwill

    The Dampier Port Upgrade Project (DPU) involves an upgrade to Hamersley IronÆs Parker Point iron ore port facility at Dampier, Western Australia. The $US700 million DPU Project will increase Hamersley

    Jan 1, 2005

  • AUSIMM
    Effective Life-of-mine Planning by Understanding and Managing Risks and Opportunities Associated with Geological Uncertainty

    By M Berry

    Consider these four questions:What is the definition of life-of-mine?When should life-of-mine planning seriously commence?When can life-of-mine planning seriously commence?What is the key input to eff

    Jul 16, 2014

  • AUSIMM
    Review of Variogram Properties and Remarks on its Use in Process Control

    By D M. Frantois-Bongarton

    Variograms can be powerful tools for the analysis and control of process streams and their sampling. Their uses and proper utilisation have been described somewhat unclearly to date, and their limitat

    Aug 21, 2012

  • AUSIMM
    Practical Considerations and Shortcuts in Sampling

    By D M. Frantois-Bongarton

    "A few situations are first reviewed where practical shortcuts lead to acceptable solutions where none seemed to be possible. These include: The solving of many complex sampling optimisation problem

    Aug 21, 2012

  • AUSIMM
    Mine-to-Mill Optimisation ù Research and Practice

    Mining companies around the world are seeking methods to coordinate operations between the mine and the concentrator to achieve an overall improvement in enterprise performance. In several instances v

    Jan 1, 2000

  • AUSIMM
    Telfer Underground - A Difficult Mine and the Associated Problems

    Teller Underground Mine was established to extract ore from the Middle Vale Reef located on the eastern flank of Telfer Main Dome.The mine is located below a 150 m deep open pit operation. The ore bod

    Jan 1, 1993

  • AUSIMM
    Mining-Hydrological Characteristics of the Underground Copper Mine of Neves-Corvo, Portugal

    By Real F, Carvalho P

    During the development of the Neves-Corvo Underground Copper Mine, since 1981, inflow of water has been encountered in the mine workings, which consist of a ramp from surface 5 km long, a shaft 575

    Jan 1, 1988

  • AUSIMM
    Excavation of the Headrace Tunnel, King River Power Development

    By Baynes F. J, Bermingham A. G

    The 6000m long King Headrace Tunnel will be driven through hard Owen Conglomerate in the Eastern third and feldspar porphyry in the Western two thirds, with the anticipated hardness up to 350MPa un

    Jan 1, 1987

  • AUSIMM
    Criteria for the Engineering and Construction by TBM of a Tunnel Under the Torre Annunziata (Italy) Built Up Area

    By Turco E, Pelizza S, Vona A

    Within the project against pollution in the Gulf of Naples (Italy) it was envisaged to build a sewage collection tunnel whose tunnelling section is about 30 m2 and whose length is over 4 km. The fo

    Jan 1, 1987

  • AUSIMM
    A Comparison of Gold Recovery by Pressure Cyanidation and by Pressure Oxidation/Conventional Cyanidation from a Stibnite Concentrate

    By Robinson J

    A stibnite flotation concentrate from Costerfield in Victoria was found to contain 63.3 g/t An while its sizing distribution indicated that 81.6 per cent of the material was less than 38 ¦m. A 24 ho

    Jan 1, 1991

  • AUSIMM
    Technical Note - A Theoretical Model for Outbursting in Coal Mines

    By Schlanger H. P

    A theoretical model for gas outbursts in underground coal mines is as follows. An outburst is the structural failure ofcoal due to excess stress resulting from body forces caused by gas pressure gradi

    Jan 1, 1985

  • AUSIMM
    Further Notes on Underground Mine Fire Prevention at the South Mine, Broken Hill

    CONTENTS.IntroductionAcknowledgementsDescription of MineVentilation of MineOrganisation of Fire Fighting SquadsTraining of Fire Fighting SquadsRescue WorkFire Fighting and Rescue EquipmentFire AlarmsC

    Jan 1, 1946

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Fundamental Studies for Detecting Fire Source of Spontaneous Combustion Using the Self-Potential Method ù In Situ Measurement in a Combusting Coal Waste Pile

    By K Uchino, M Inoue

    Self-potential anomalies are generated by fluid pressure gradient, by temperature gradient or by chemical gradient. On the basis of this principle, a new technique is proposed to locate the fire sourc

    Jan 1, 2005

  • AUSIMM
    Rapid Tunnelling Technologies at Cadia East

    As part of a prefeasibility study being undertaken by Newcrest Mining Limited, the Cadia East Implementation Team has developed an access decline to the proposed underground operation. This paper desc

    Jan 1, 2008

  • AUSIMM
    Compact Bucket Wheel Excavators for the Latrobe Valley

    The lignite mines in the Latrobe Valley of Victoria/Australia have been using continuously operating mining systems for more than 50 years. The relatively small bucket chain dredgers of the early y

    Jan 1, 1989

  • AUSIMM
    Limits Excavation at Mt Whaleback

    Within the Mt Whaleback open cut mine the integrity of the final pit wall is achieved through careful rock slope design, use of rock reinforecement technology where marginal stability exists and u

    Jan 1, 1986

  • AUSIMM
    Use of Shotcrete Arch as Tunnel Support - A Case Study

    By B Shen

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for approximately 14 km linking the Mt Thorley rail loop and the Wambo Coal Mine. The project involves a 260 m long tunnel

    Jan 1, 2008

  • AUSIMM
    Roof Falls in Australian Longwalls

    By Savidis GM

    This report outlines the experience of Australian mining operators in dealing with large falls of roof in advance of longwall supports. Previous and present techniques used for face stabilisation

    Jan 1, 1986