Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New online/atline splitter designs for laboratory automation – feasibility resultsBy A Hollweg, K H. Esbensen, M Lischka
Two new splitter designs for intercepting moving streams of matter are presented, the variable cross-stream splitter (vCSS) and the rotary stream splitter (RSS), which are intended for implementation
May 9, 2017
-
Spectrophotometric Determination of Z-200 (Isopropyl Ethylthionocarbamate) in Flotation LiquorsThe ultraviolet spectrum of isopropyl ethylthionocarbamate (the principal constituent of Dow flotation collector Z-200) in water and of Z-200 itself in water was found to have an absorption peak at 24
Jan 1, 1969
-
Automated Train Ore TransportBy J Fisher, M Castro, A Hariyadi
The train haulage system being designed for PT Freeport Indonesia’s Grasberg Block Cave (GBC) will be located within the mine at an elevation of almost 3000 m above sea level on the west side of the i
May 9, 2016
-
Stratigraphy of the Thomson Orogen – New Insights from Mount McLaren, North-east AustraliaBy C Verdel, M Lee, A Oorloff, K Welsh
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Thomson Orogen is a large but poorly understood element of Queensland geology. Extensiv
Mar 18, 2015
-
Some Calculations Dealing with Mine TimberONE of the phases of mining wide ore-bodies, such as are found in Broken Hill, is the laying-out and design of the sill floor gangway timber, When, in the above operation, a detail has to be repeated
Jan 1, 1923
-
Online Slurry Analysis for Process Control and Monitoring at Iron Ore ConcentratorsBy M J. Kongas, K M. Saloheimo
This paper presents the art of on-stream particle size and elemental analysis used at iron ore concentrators, followed by the results and experiences from several sites.Online particle size analysis i
Aug 12, 2013
-
Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed TomographyBy I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt
For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty
Aug 21, 2012
-
Discrete Fracture Network Modelling for Tunnel Design in the Sydney BasinBy A L. de Ambrosis, F M. Weir, M Fowler
Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass
Sep 17, 2014
-
Estimating the Rock Mass Strength of Hawkesbury SandstoneBy R Bertuzzi
"This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa
Nov 5, 2014
-
The Effect of Grinding Media on Copper and Gold Flotation in the Presence of Clay MineralsBy R Wei, Y Peng, D Seaman
This study addresses a widespread problem confronting the mining industry: the deleterious effect of clay minerals in flotation. This problem is seemingly exacerbated by the presence of iron contamina
Sep 26, 2013
-
Confirmation of Multiseam Extraction Rules for Black Rock Manganese Operations, Assmang, Northern Cape, South AfricaBy M K. C Roberts, M G. Magwaza, J W. L Hanekom, P Piper, R Lousteau
Due to the perceived potential to extract the second economic manganese seam at its Black Rock Operations in the Northern Cape Province, South Africa, Assmang commissioned an investigation with respec
Nov 5, 2014
-
Large Event Sequence Analysis and 3D Velocity Models for Seismic Event Location AccuracyBy D S. Collins, Z Hosseini, I Pinnock, Y Toya
Microseismic monitoring is regularly used in the mining and geotechnical industries to provide detailed information about rock mass response to operational activities. This paper implements a variable
May 9, 2016
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy AssessmentBy R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, PortugalBy M Byrne, P Newman, M Lindqvist
SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss
Jan 1, 1998
-
The Bottle Creek Au/Ag Deposit Ore Resource Calculation ProceduresBy Moeller T
The Bottle Creek mine, when opened next month, will consist of three open cuts, Emu, VB and Boags, feeding ore to a central mill. The open cuts cover a strike length of 4.5 kilometres which forms pa
Jan 1, 1987
-
The Plabutsch Road Tunnel in AustriaBy Pinter R
Several major routes connecting Northern and Southern Europe or Asia run through Austria. These highways have to surmount the alpine range which traverses Austria from west to east. In order to en
Jan 1, 1987
-
Development of the Argo MinePeko Mines, a Division of Peko-Wallsend Operations Limited (PWOL) has operated several small underground mines in the Tennant Creek district of the Northern Territory supplying ore to a central t
Jan 1, 1986
-
Recent Operation at Harima WorksBy Kadoya H, Kondo Y
The Harima works were established in 1964 and started operation in 1966. The initial capacity was 3500 t/month of zinc and 1500 t/month of lead. Until 1990 a lot of improvements had been made and th
Jan 1, 1993
-
Design of a Continuous Monorail Drilling System for Decline DevelopmentBy M Kuruppu, B Besa
Currently, conventional methods of decline development put enormous cost pressure on the profitability of mining operations. This is the case with narrow vein orebodies where current methods and mine
Jan 1, 2008
-
Stope Filling with Thickened Classified Flotation Tailings (8ea60644-b41a-4846-93fc-367236e8ddfb)Stope filling practice on the Great Boulder Mine was described in -a paper published in Aus.I.M.M., Proceedings No. 137, in 1945. When the paper was presented the process had emerged from the experime
Jan 1, 1948