Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Improving Fine Copper and Gold Flotation Recovery ù A Plant EvaluationBy G Wood, B Lumsden
A statistical ærandomised block designÆ full plant trial of magnetic conditioning of flotation feed was undertaken at Rio TintoÆs Northparkes Mine in New South Wales. Magnetic conditioning of flotatio
Jan 1, 2007
 - 
                    
                The Geology of the Golden Cross Mine, Waihi, New ZealandBy P C. Couper, P C. Keall, S J. Mathews, A Francis
An epithermal gold-silver deposit is presently being developed at the Golden Cross Mine in the Waitekauri Valley, 8 km northwest of Waihi, New Zealand. Highest grade mineralisation underground is main
Jan 1, 1991
 - 
                    
                Optimisation Improvements in Whittle using Stope Optimisation SoftwareMining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result
Dec 6, 2010
 - 
                    
                Design and Construction of the Yarra River CrossingBy R Blair
The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru
Jan 1, 1999
 - 
                    
                Separation of ultra-fine particles using the REFLUX™ GravitonBy J L. Carpenter, S M. Iveson, K P. Galvin
Wet beneficiation of iron ore fines less than 1 mm typically involves a desliming stage ahead of the fine gravity separation such as spirals. The desliming is achieved using a bank of cyclones. The re
Jul 24, 2017
 - 
                    
                Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
 - 
                    
                Solar processing of iron oresBy M I. Pownceby, M A. Rhamdhani, S Purohit, G Brooks
The use of concentrated solar flux for high temperature metallurgical applications is a wellresearched area with several reported literatures on solar calcination and metal oxide reduction. This paper
Nov 8, 2021
 - 
                    
                Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry MiningBy J Siliézar
The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a
Jul 11, 2011
 - 
                    
                Accurate Underground Wireless Ranging and TrackingBy M Hedley
Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur
Mar 21, 2011
 - 
                    
                Evaluation of Management Options for Acid Generating Tailings Deposited on an Arid Peruvian CoastBy M Rankin, F Medina, R Verburg
We conducted a preliminary assessment of an extensive deposit of historic tailings discharged over a period of 40 years to the shoreline along a Southern Peruvian coastline. The tailings formed an ext
Jan 1, 2003
 - 
                    
                Outline of Electrical Plant Layout Mount Isa Mines LtdBy Edmonds G. A
The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a
Jan 1, 1953
 - 
                    
                The Red Rock Deposit: A Late Permian Submarine Epithermal Precious Metal System in Northeastern New South WalesThe epithermal silver-gold Red Rock Deposit is hosted in the Late Permian inter- mediate to silicic composition Drake Volcanics of New England, N.S.W. This deposit represents one of the few low sul
Jan 1, 1987
 - 
                    
                Holistic Approach to Study Gravity Flow at the Kiruna Sublevel Caving MineBy M Wimmer
LKAB operates two underground iron ore mines located in the northern part of Sweden, both using sublevel caving (SLC) as the mining method. Knowledge of the mechanisms of gravity flow is important sin
May 9, 2016
 - 
                    
                Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative SubsetBy J Deraisme, P Epinoux, O Bertoli
"Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr
Nov 24, 2014
 - 
                    
                The Response of Water Storage Tanks Under BlastingBy D K. Miller, L W. Armstrong
In April 2006, Orica Quarry Services undertook an investigation to determine the likely vibration and frequency response of three water storage tanks to quarry blasting, immediately adjacent to the ta
Jan 1, 2007
 - 
                    
                Cenosphere Formation during the Combustion of PyriteMagnetite cenospheres 40-270 I/m in diameter have been found during the combustion of pyrite concentrate.Micrographs of the surface and internal structures are presented together with comment on the m
Jan 1, 1980
 - 
                    
                Profitable and Productive Partnerships ù Optimising Coal Recovery in Close Proximity to the Hunter RiverBy D Stacey, J Matthews
Hunter Valley Operations in partnership with Orica Explosives designed a process to optimise coal extraction at depths greater than 65 m below the Hunter River in a safe and cost effective manner. The
Jan 1, 2001
 - 
                    
                The Loy Yang Overburden SystemThe Loy Yang Overburden System initially consists of a 60 000 tonne/day Bucket Wheel Excavator (BWE) (No. 14), a 2 m wide Conveyor System and a Travelling Stacker (No. TS4). The paper discusses deta
Jan 1, 1982
 - 
                    
                Presentation of the Institute Medal, 1976 to Laurence Charles Brodie-Hall, C.M.G.ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE MEDAL TO LAURENCE CHARLES BRODlE-HALL, C.M.G.The Institute Medal is awarded to a select band of people who have rendered
Jan 1, 1977
 - 
                    
                A Preliminary Geotechnical Assessment for Re-Opening the Blackwater MineBy J Taylor, L Richards, M McKenzie
When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.
Jan 1, 1996