Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Methane Drainage Experience with Horizontal Boreholes in a Western Coalbed

    By Perry JH, King RL

    The Bureau of Mines in cooperation with Kaiser Steel Corporation conducted two methane drainage studies in an advancing section of the Sunnyside No. I Mine where production was being severely hampe

    Jan 1, 1982

  • AUSIMM
    Magnadets Theory and Application

    By Walker V

    The 'MAGNADET' to provide a safe enhanced protection extraneous currents, electricity and radiodetonator was designed electric detonator with against the effects of current leakage, static f

    Jan 1, 1985

  • AUSIMM
    Structural Geology of the Muja Open Cut and its Impact on Highwall Stability

    Discontinuities often have a very detrimental effect on the stability of mine highwall faces. The west wall of the Muja open cut is remarkable for the number and variety of discontinuity sets which oc

    Jan 1, 1993

  • AUSIMM
    Smooth Batters, Fewer Berms and Erosion Control: The Keys to Steeper Slopes at Bougainville

    By Lye GN

    Rock mechanics investigations have shown that some major slopes in the Panguna pit would be stable at angles in excess of 500 providing near-surface instability could be controlled. Excavation of

    Jan 1, 1986

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zeland

    By Gregg PEH, Horne D, Bolan N, Stewart RB

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on si

    Jan 1, 1995

  • AUSIMM
    Evaluation of Blast Furnace Slag as Base Material in Road Pavements

    Graded macadam slag base has been used successfully by the Department of Main Roads, N.S.W., in the construction of Expressways. However, the use of graded macadam in urban conditions introduces p

    Jan 1, 1979

  • AUSIMM
    The Colorimetric Determination of Vanadium in Soils, Sediments, and Rocks for Use in Geochemical Exploration

    Samples weighing 0·5 g are fused with sodium hydrogen sulphate, leached with 5 ml. of 4 M nitric acid and diluted to 10 ml. with water. An aliquot of the clear solution is boiled with concentrate

    Jan 1, 1971

  • AUSIMM
    Modelling of Multiple Narrow Veins from Geology to Mining - the Tasmania Reef, Beaconsfield, Tasmania

    By P B. Hills

    This paper discusses the computerisation of the drill hole database, some historical records and the creation of a three-dimensional model of the gold bearing structures for resource estimation and mi

    Jan 1, 1999

  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • AUSIMM
    Slab-Buckle Failure in Weak Coal Mine Strata - The Malvern Hills Case Study of July 2004

    By D H. Bell

    Slab-buckle failures in coal sequences involve thin slab deformation in strata dipping parallel to the footwall, and are a consequence of both unloading and the weak nature of the thinly bedded rock m

    Jan 1, 2007

  • AUSIMM
    Sustainable Water Use in Minerals and Metal Production (d0f30340-98d8-41af-9a56-e3b26cd94fdc)

    By R R. Lovel

    In this paper, life cycle assessment methodology has been used to assess the variations in water use associated with different metal production and processing routes and provide insights into the valu

    Jan 1, 2006

  • AUSIMM
    Sustainable Water Use in Minerals and Metal Production

    By R R. Lovel

    In this paper, life cycle assessment methodology has been used to assess the variations in water use associated with different metal production and processing routes and provide insights into the valu

    Jan 1, 2006

  • AUSIMM
    Shaft construction at the Gold Fields Wallaby mine

    By J Graaf, R A. Murrell

    Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate

    Oct 16, 2017

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Improvement strategies for accurate underground drilling and blasting effectiveness at the Barrick Kibali Gold Mine

    By F M. Senda

    This paper highlights strategies used at the Barrick operated Kibali Gold Mine (KGM) to improve the drilling accuracy and blasting effectiveness for longhole open stoping. The mine currently uses Solo

    Mar 29, 2023

  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    Simulation of Flexible Circuits

    By MáAndrusiewicz, M M. Hilden, M S. Powell, P D. Kay, B Foggiatto

    Circuits with unconventional and potentially more complex designs are predicted to become more common in the future as plant designers and operators look to process ores more efficiently. Ideas have b

    Oct 29, 2012

  • AUSIMM
    Reduction of the Blast Exclusion Zone at the Black Star Open Cut Mine

    By J Moncrieff, P Bellairs

    The Black Star Open Cut is located immediately adjacent to the township of Mt Isa and is situated in the middle of extensive pre-existing infrastructure including two concentrators, two smelters, a we

    Jan 1, 2007

  • AUSIMM
    Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLY

    The mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho

    Nov 25, 2010