Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Overburden Preparation Moura-Kianga Coal Mines, Bowen Basin

    Quite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more

    Jan 1, 1974

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, Sweden

    By M Svartsjaern, D Saiang and K Mäkitaavola

    The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The

    May 9, 2016

  • AUSIMM
    The Nature and Origin of the Gold-Bearing Laterities at Mount Gibson, Western Australia

    By Sale M, Clarke R, Parker M

    The Mount Gibson goidmine is located at the southern end of the Retaliation greenstone belt within the Murchison Province, approximately 300 km northeast of Perth, Western Australia. Economic gold m

    Jan 1, 1988

  • AUSIMM
    Rakeless Thickener Operation at St Ives Gold Plant

    The first 12 m diameter rakeless thickener in the Australian gold mining industry was installed to treat plant tailings at the St Ives gold plant in April 2000. The plant processes approximately 3.2 M

    Jan 1, 2002

  • AUSIMM
    Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case Study

    By B Smith, R Gelson

    Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila

    Jul 1, 2013

  • AUSIMM
    Optimal goaf hole spacing in high production gassy Australian longwall mines – operational experiences

    By B Belle

    In a predrained gassy coalmine, ventilation control plays a secondary role to the longwall (LW) goaf drainage systems to safely manage panel return gas levels. Typically, the LW specific gas emission

    Aug 28, 2017

  • AUSIMM
    Ashers-Waituna and Hawkdun Lignite Deposits: Their Resources and Use Potential

    By A M. Sherwood

    The Otago and Southland lignite deposits represent by far the largest known fossil energy resources in New Zealand. Despite their size they have remained virtually untouched since exploration in the 1

    Jan 1, 2005

  • AUSIMM
    Applying Controlling Blasting to Minimise the Damage at the Water Dam Ramp 23 at Ensham Resources

    By I Villalba

    The need to continue the development of the Ensham mine has led to blast up to 75 m to the Eastern side of a water dam in the vicinity of Ramp 23. The water dam wall is exposed to blasting over a

    Nov 8, 2011

  • AUSIMM
    Application of steel bollards for managing the hazards associated with open stopes, Waihi Underground Operations

    By C E. Gawith

    The Waihi underground mining operation currently mines epithermal veins ranging from two metres up to ten metres in width using a ‘Modified Avoca’ stoping method. This method consists of longhole benc

    Mar 15, 2021

  • AUSIMM
    From Inception to Completion ù A Blind Bored Ventilation Shaft and Watertight Lining for the Springvale Coal Mine

    By J Zeni

    In 2001, the Springvale Coal Mine determined a requirement for a 360 m deep vertical airway to ventilate ongoing underground longwall mining operations. The project, referred to as the Springvale No 3

    Jan 1, 2005

  • AUSIMM
    Grasberg Block Cave Haulage Project – Design and Construction Update

    By B Mead, N D. Pascoe

    The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00

    May 9, 2016

  • AUSIMM
    Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, Spain

    By M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena

    The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,

    Jan 1, 2008

  • AUSIMM
    Resource Estimation and Grade Assignment - A Comparison Between Historical Production and Current Maxwell Mining Validation Case Study at Morning Star Gold Mine, Woods Point

    By P Jackson, J Rea, M D. Goodz

    The Morning Star Gold Mine has operated over a 101-year period, producing gold from narrow quartz veins and sulfide stockworks hosted mainly within a dioritic-gabbroic dyke. The deposit has been devel

    Jan 1, 2008

  • AUSIMM
    Formation of <i>O,OÆ</i>-Di-Alkyl-Dithiophosphate Copper(I) Complexes on the Surface of Synthetic Chalcocite ù NMR and SEM Studies

    By O N. Antzutkin, W Forsling, K J. Pike an

    The adsorption mechanism of three different O,OÆ-di-alkyl-dithiophosphate (dtp) collectors, K[S2P(OR)2] with R = Et, i-Bu and i-Amyl, on the surface of synthetic chalcocite (Cu2S) was studied by means

    Jan 1, 2005

  • AUSIMM
    The Dugald River Zinc-Lead-Silver Deposit; An Example of a Tectonised Proterozoic Sratabound Sulphide Deposit

    By Allnutt S. L, Carswell J. T, Mutton A. J

    The Dugald River Zn-Pb-Ag deposit occurs within the complexly deformed and metamorphosed sediments of the Middle Proterozoic Cloncurry Terrane, Eastern Succession, Mount Isa Inlier. The sedimentary

    Jan 1, 1993

  • AUSIMM
    Composition, Lithochemistry and Radiogenic Isotopes of Porphyritic and Equigranular Intrusions in the Ertsberg Mining District, Papua, Indonesia

    By G de Jong, W Sunyoto, M Cloos

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Ertsberg mining district is a 100 km2 area in the highlands of Papua, Indonesia. The di

    Mar 18, 2015

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    Geology and Exploration of the Hamata Deposit

    By Young DJ

    Gold mineralisation at the Hamata prospect is related to a series of stacked pyrite and quartz-pyrite veins associated with a number of shears which strike N to NE and dip E. Mineralisation is con

    Jan 1, 1991