Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Hydrothermal Activity, Vent Fauna, and Submarine Gold Mineralization at Alkaline Fore-Arc Seamounts Near Lihir Island, Papua New Guinea (b8d7faf2-df15-4edf-9284-fc8d24aceba8)

    By Hannington MD

    On the southern flank of Lihir Island, a group of three volcanic cones were discovered at water depths from 1000-1500 m. The volcanoes are located in a narrow zone of recent seismic activity and elev

    Jan 1, 1995

  • AUSIMM
    Quantification of Rock Mass Damage Associated with a Confined Blast Preconditioning Experiment at the Cadia East Block Cave

    By G Chitombo, D Francis, P C. Stewart, I Brunton

    The ability to precondition (weaken) a rock mass to enhance caving (cavability and fragmentation) is becoming increasingly important, as more potential caving deposits are in stronger rock masses, and

    May 9, 2016

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Mine Hoists for the Nickel Rim South Project

    By T Gartner

    This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts

    Jan 1, 2005

  • AUSIMM
    Microplaty Haematite of the High-Grade Iron Ores – Its Nature and Genesis

    By R C. Morris

    Secondary microplaty haematite in its variety of styles and generations is the defining component of the high-grade banded iron-formation (BIF)-hosted iron ores of the world that are dominated by mart

    Jul 11, 2011

  • AUSIMM
    HellyerÆs Innovative Escapeway

    By Will D. P

    A 328 m, 2.4 m diameter raise-bored shaft has been equipped with a modular ladderway system to provide a second means of egress from Aberfoyle's Hellyer Mine in Tasmania. The modular ladderwa

    Jan 1, 1988

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Planning and Execution of Shaft Pillar Extraction in a Deep Level Mine

    Driefontein Gold Mine together with Kloof Gold Mine and Beatrix Gold Mine forms part of Gold Fields South Africa. Driefontein Gold Mine is situated near the town of Carletonville, 50 km south of Johan

    Jan 1, 2005

  • AUSIMM
    Theoretical Evaluation of Sulphide Dust Explosions in Open Stopes

    The number and severity of sulphide dust explosions in underground metalliferous mines have increased in recent years, despite various methods used to prevent or inhibit them. A dust explosion occ

    Jan 1, 1988

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

    By J Bower

    The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t

    Jan 1, 2009

  • AUSIMM
    Sedimentary Structures in the Metamorphic Rocks and Orebodies of Broken Hill (7122c7bd-f6fa-43f0-828a-39df96a7a19e)

    B. P. Thomson (South Aust. Dept. of Mines): Dr. A. B. Edwards presents in the published discussion on the above paper, his interpretation of the dolerite dyke-lode relationship as a major objection to

    Jan 1, 1959

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Automated Mineralogical Logging of Core From the Emmie Bluff, Iron Oxide Copper-Gold Prospect, South Australia

    By R Skirrow, E Bastrakov, A Mauger, P

    A new rapid spectroscopic core and chip logging and imaging system developed by CSIRO was evaluated by PIRSA and GA on a wide variety of mineralised properties in South Australia, including the Emmie

    Jan 1, 2004

  • AUSIMM
    Tunnelling for Bogong Hydropower Development

    By A Kindred

    The Bogong Hydropower Development is a 140 MW high head power project currently under construction in Northern Victoria. The project is the final link in the Kiewa hydroelectricity scheme, which was o

    Jan 1, 2008

  • AUSIMM
    A Description of the Stripping and Re-Timbering f the Ivanhoe South Extended Shaft, with Work Incidental Thereto

    With the post-war expansion of mmmg activities on its Western group of mines, the management of Lake View and Star Limited has commenced a project for the improvement of underground ventilation.The ma

    Jan 1, 1948

  • AUSIMM
    A Ventilation System for Large Block Cave Mines

    By M Stephens, T A. Sutra

    Currently, there are several open pit mines with production rates of about 200 000 tpd of ore that are reaching the end of their economic lives. In most cases, the remaining orebody extends to depths

    Jan 1, 2005

  • AUSIMM
    Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine Closure

    By S Jahn, M Noel, E M. Rykaart, M Pau

    Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m

    Jan 1, 2003

  • AUSIMM
    Smart Solution to a Sticky Problem ù In-Mine Clay Mapping Using High-Resolution Geophysics

    By P J. Hawke

    Within the Mesa J pisolitic iron ore mine, clay is distributed unevenly throughout the deposit and often forms as pods and channels less than 10 m in width. The mine resource model, based on 50 m + 50

    Jan 1, 2002

  • AUSIMM
    Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 Storage

    By A Hamanaka

    EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be

    Nov 22, 2011