Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Effect of Clearance Angle on Penetration Rate of Rotary-Drag BitsIn conjunction with a study on wear of drag bits the effect of clearance angle on penetration rate was studied.Increases in clearance angle from 24 1/2 up to 30° gave an increase in penetration r
Jan 1, 1969
-
Contributed Discussion to "The Nickel Copper Deposit at Radio Hill, Karratha, Western Australia" by De Angelis, Hoyle, Peters and Wightman (Bulletin and Proceedings Vol 292, June 1987)I offer some comments which might complement the valuable recent paper by De Angelis et al (1987), on the newly discovered nickel-copper deposit at Radio Hill.The authors have accepted subdivisions an
Jan 1, 1988
-
Swamp Works – A New Approach to Develop Space Mining and Resource Extraction Technologies at NASA’s Kennedy Space Center: Prospecting, Excavation, Load, Haul and Dump for In Situ Resource UtilisationBy A J. Nick, I I. Townsend, J M. Schuler, J D. Smith, R P. Mueller, L Sibille, K Leucht, J J. Fox
The first steps for in situ resource utilisation (ISRU) on target bodies such as the Moon, Mars and near-Earth asteroids (NEA), and even comets, involve the same sequence of steps as in the terrestria
Nov 4, 2015
-
Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium MineralisationBy M Zengerer
The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp
Aug 18, 2014
-
Open Pit Strategic Mine Planning with Automatic Phase GenerationBy M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague
A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope
Nov 24, 2014
-
Mining Administration and LegislationThis paper discusses some topical issues on the mining administration and legislation fields including: 1. Licensing û Administration and associated specialist functions including:Processin
Jan 1, 1982
-
Current Drilling Practice at Isa MineBy Stevens P
The Isa Mine of Mount Isa Mines Limited currently produces 5.4 million tonnes of copper ore and 3.3 million tonnes of silver, lead and zinc ore annually. Of this, 5.1 million tonnes of copper ore
Jan 1, 1982
-
Technical Note on the Metering of Fine Powders at Low FlowratesBy Turner T. M
The problem of metering fine particulate material at low flowrate is often encountered in metallurgical experiment. This note describes a feeder which wa developed to provide metered flows of copper s
Jan 1, 1978
-
Deformation by Creep of a Specimen Lead Consisting of Five Large CrystalsThis paper describes the behaviour, under creep conditions, of a cast lead creep specimen consisting of five crystals, the boundaries of these crystals being substantially at right angles to the direc
Jan 1, 1941
-
Violent Rupture of Mid-Crustal Barriers by Fluidised Breccia (Cloncurry Fe-Oxide-Cu-Au District, Australia): Implications for Cu-Au Mineralisation and KimberlitesBy L R. Marshall, M J. Rubenach, T G. Blenkinsop, J S. Cleverley
The source and transport regions of fluidised (transported) breccias outcrop in the Cloncurry Fe-oxide-Cu-Au district, providing insights into the origins of other fluidised magmatic-hydrothermal brec
Jan 1, 2005
-
Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.By Hemingway P, Boag J
Major operating aspects of the Mary Kathleen Uranium Ltd. treatment plant are discussed with partkular reference to those which are peculiar to this operation.Problems associated with the production o
Jan 1, 1961
-
Mining Methods in Use at North Broken Hill Ltd., Broken Hill, N.S.W.This paper gives a description of the methods of mining employed at North Broken Hill Limited, Broken Hill, N.S.W.GEOLOGICAL NOTESThe main Broken Hill lode occurs as a replacement of tightly folded pr
Jan 1, 1940
-
Calibration of a Frantz Isodynamic Separator and its Application to Mineral SeperationA calibration of the Frantz isodynamic magnetic separator relates the current in the electromagnet and the transverse slope of the chute to the specific susceptibility at which separation is being eff
Jan 1, 1957
-
The Relation Between Faulting and Mineralization at the Cowarra Gold Mine in New South WalesThe Cowarra gold mine is at latitude 36°O'S. and longitude 149°19'E. which is roughly 20 miles north-north-east of Cooma.The deposit was· originally worked towards the end of
Jan 1, 1965
-
A Structural Framework for the Otago Gold-Quartz Lodes Involving Flexing of a Metamorphic CarapaceAny hypothesis for the origin of the Otago gold-quartz lodes must account for the following observations. 1. Southeast of Glenorchy, where the schists hosting the lodes are comparatively unaffected b
Jan 1, 1992
-
Method Selection for Large-Scale Underground MiningAs has been the case since the early Phoenician traders, the minerals used by modern man come from deposits scattered around the globe. The price received is more and more being set by worldwide suppl
Jan 1, 2000
-
Nature and Distribution of Gibbsite in Some Western Australian Iron OresBy M Paine
Work to date has shown that the use of Al2O3:SiO2 ratios is suitable for identifying potential gibbsite bearing samples. Subsequent confirmatory XRD analysis helps to refi ne this initial identificati
Jul 11, 2011
-
The Discovery and Early History of the Mt Leyshon Gold Deposit, North QueenslandBy J E. Lynch
The Mt Leyshon gold deposit produced in excess of three million ounces of gold and considerable silver over a period of approximately 130 years. Most of this production occurred between 1987 and 2001.
Jan 1, 2004
-
Non-magmatic versus Magmatic Fluids in the Genesis of Archean and Palaeoproterozoic Iron Oxide-copper-gold Systems of the Carajás Mineral Province (Brazil)By E S. B Santiago, C P. N Moreto, L V. S Monteiro, G H. C Melo, R P. Xavier
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Iron oxide-copper-gold (IOCG) systems of the Carajás mineral province (Amazon craton, Brazi
Mar 18, 2015
-
Oxygen Pressure Leaching of a Bulk Flotation Concentrate form a Complex Cu-Pb-Zn Sulphide OreBy Canterford J. H, Sparrow G. J, Dyson N. F
Pressure leaching of a bulk flotation concentrate prepared from a complex Cu-Pb-Zn sulphide ore was carried out at 150 and 190¦C under 1050 kPa oxygen overpressure in 1 L and 4 L titanium autoclave
Jan 1, 1989