Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Flotation Study for Effective Separation of the Heavy Mineral Sands

    By Takiuchi T, Kurita M, Owada S

    This paper describes the possibility of the application of flotation to the separation of monazite from xenotime and of columbite from ferberite, which have been said to be difficult with generally

    Jan 1, 1993

  • AUSIMM
    An iron ore detective story in Papua New Guinea

    By E R. Ramanaidou

    Two unknown iron ore samples were found by a geologist from Ok Tedi Mining Limited copper, gold and silver mine at an old wharf site dedicated to a 1970s drilling program in Lake Murray in Papua New G

    Sep 18, 2023

  • AUSIMM
    New Insights into the Formation, Structural Development and Preservation of Iron Ore Deposits in the Northern Cape Province, South Africa

    By D J. Alchin

    Most of South AfricaÆs high-grade iron ore resources are hosted within a fault-controlled structural basin in rocks of the Palaeoproterozoic Transvaal Supergroup in the Northern Cape Province of South

    Jan 1, 2007

  • AUSIMM
    Nickel-Iron Exchange in Pyrrhotite (5214865a-3610-487f-bdc8-04dc3e1ec1a9)

    The uptake of nickel into the lattice of pyrrhotite, Fe1 _1J S was studied experimentally in the temperature range 200°C to 760°C. Nickel from both aqueous solutions and salt melts diffuses

    Jan 1, 1972

  • AUSIMM
    Isotope Geochemistry of the Black Ridge Gold Deposit, Clermont, Central Queensland

    By Dobos SK

    The Black Ridge Gold Deposit is located in the northern part of the Clermont Goldfield, which is situated at the boundary of the Bowen Basin and Anakie Inlier, Queensland. The goldfield comprises a se

    Jan 1, 1990

  • AUSIMM
    Developments at the Rosebery Concentrator of the Electrolytic Zinc Co. of Australasia Ltd.

    Previous published papers by Fraser (1), Hey (2), and Stillwell (3), have given respectively, details of:-1. The practice in the pilot plant operated at Zeehan for the treatment of ores from the Roseb

    Jan 1, 1949

  • AUSIMM
    Earthmover Tyre Operations at Coal and Allied's Hunter Valley No. 1 Mine

    Coal production from Coal & Allied's Hunter Valley No 1 open cut is presently hauled 10 km by road to washing and train loading facilities at Liddell. This road haul, using bottom dump trucks

    Jan 1, 1982

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Remote Sensing by Satellite in the Pacific

    By Kelly GD

    Prior to 1986, users of satellite based remotely sensed data were almost exclusively reliant on the United States Landsat series of satellites to monitor our Earth's resources. This situation cha

    Jan 1, 1990

  • AUSIMM
    A Review of Current Exploration and Evaluation Practices in the Search for Gold in the Archaean of Western Australia

    By Seymour K. M, Sampson D. B, Walker I. W

    Ashton Mining Limited is the operator of two wholly-owned gold mine/mill complexes at Laverton and Leonora. In addition, Ashton owns 43% of the Bardoc Joint Venture mine/mill complex, which is oper

    Jan 1, 1991

  • AUSIMM
    Iron Ore Bedding & Blending at the Newcastle Steelworks

    Expansion of the B.H.P. Co. Ltd. mater ials handling facilities, at their Newcastle Steelworks, began in 1964 and continued until 1970. The present complex handles the annual iron ore requirement o

    Jan 1, 1972

  • AUSIMM
    Design and Construction of No. 2 Residue Dam at Rosebery

    By West Coast Staff

    Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall whic

    Jan 1, 1958

  • AUSIMM
    The Role of Allochtonous Terranes in Construction and Evolution of the Pacific Continental Margins (For North USSR)

    By Ushakov S

    New geological and geophysical in vestigation including our detailed field observation in different regions of the Koryak upland testify that Nor- theastern Eurasia margin eastward of the Ochotsk-C

    Jan 1, 1987

  • AUSIMM
    Key Differences Between In Situ Recovery Mining and Conventional Mining

    By S Telford, J Weir

    Heathgate Resources Pty Ltd (Heathgate) operates the Beverley Uranium Mine in South Australia, located on the plains between the northern Flinders Ranges and Lake Frome some 600 km north of the state

    Jan 1, 2008

  • AUSIMM
    The Calc-silicate-hosted Watershed Tungsten Deposit, Far North Queensland, Australia

    By J Williamson, M Griessmann

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Watershed tungsten deposit is located in the Hodgkinson Province of north Queensland, A

    Mar 18, 2015

  • AUSIMM
    Wall-flow type diesel particulate filter system to replace existing wet element filter systems used in typical LHDs in underground coal operations

    By N Coplin

    Australian Coal Association Research Program (ACARP) project C25073 was proposed by industry stakeholders seeking a potential solution that improves underground air quality and reduces operational cos

    Aug 28, 2017

  • AUSIMM
    Near real-time assay with downhole assay tool (FastGrade™ 100)

    By B Chi, A Mahanta, R A. M Maddever, O Dominguez

    BHP Billiton, in collaboration with Sodern and CSIRO, has developed a downhole logging tool for measuring geochemistry in situ. The FastGradeTM 100 (alternatively, FG100), exploits pulsed fast and the

    May 9, 2017

  • AUSIMM
    JumboGuard – automatic boom isolation system

    By J Dwyer, M Hill

    Downer’s mining division has made an operational and financial commitment to developing engineered solutions that mitigate the risks associated with operator proximity to uncontrolled development dril

    Oct 16, 2017

  • AUSIMM
    Microhardness testing of hematite-goethite Fe ores – implications for their textural characterisation and geometallurgy

    By S Hapugoda, J R. Manuel, M J. Peterson

    Microindentation testing using the square–pyramid–shaped Vickers indenter is a well-established technique to determine the microhardness of minerals and materials. However there is a paucity of publis

    Jul 24, 2017

  • AUSIMM
    Budget Estimation and Contingency Allocation of Block Cave Construction Using Least-squares Monte Carlo Real Options

    By H M. Ahmed, W S. Dunbar

    Construction of cave mining systems requires significant capital expenditure and long-term commitment of human, equipment and material resources before production commences. Risks and uncertainties of

    May 9, 2016