Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Drilling of Shallow Marine Sulfide-Sulfate Mineralisation in the South-Eastern Tyrrhenian Sea, Italy

    By R Sharpe, M D. Hannington, K Perrin, K Simpson, S Petersen, H Gibson, N Augustin, K Lackschewitz, T Monecke

    Semi-massive to massive sulfides were drilled in a shallow-water (630 m) hydrothermal system in an island arc volcanic setting at the Palinuro volcanic complex in the Tyrrhenian Sea,Italy. Overall 12.

    Jan 1, 2008

  • AUSIMM
    An Investigation into a Water Inflow at Wongawilli Colliery, Southern Coalfield, New South Wales

    By Poole GR

    An unusually high flow of water from an oxtr.iction panel in Wongawilli Colliery pr,;npted the investigation of the possible sources of the water. It is more probable that water is derived f r,m s

    Jan 1, 1986

  • AUSIMM
    An Investigation into Spoil Stability at Moura

    By Dunbavan M, Mallett C. W

    The sequence of development and back analysis of the failure of a spoil pile in the 1B pit of the Moura Mine are given. The mode of failure was a two-wedge mechanism with a basal slip plane passin

    Jan 1, 1981

  • AUSIMM
    Kinetics of Collector Adsorption on Mineral Surfaces

    By A Holmgren, W Forsling

    In the present study infrared attenuated total reflection (IR-ATR) was used to monitor the rate of in situ adsorption of heptyl xanthate on a layer of zinc sulfide synthesised on a germanium ATR cryst

    Jan 1, 2005

  • AUSIMM
    Practice and Prospects for Methane Predrainage to Prevent Outbursts in Coal Mines In the Congqing Area

    Most coal mines in Chongqing Area are highly gassy mines and liable to outburst of coal cnd methane. In order to harness mine environment and raise the Prodction capacity, methane predrainage is gener

    Jan 1, 1991

  • AUSIMM
    Newly Developed Method and Equipment for Tunnel Excavation-Construction of Myojin Tunnel

    By Fukuichi K, Matsukawa H, Nakagawa M

    The Myojin Tunnel, located on the Shikoku Expressway being constructed by the Japan Highway Public Corporation, is 3,770 m long with a cross sectional area of 80 m2. Kajima Corporation, the contrac

    Jan 1, 1987

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015

  • AUSIMM
    Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, Australia

    By H Hoogvliet

    The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of

    Oct 5, 2011

  • AUSIMM
    Geology of Teutonic Bore Massive Sulphide Deposit, Western Australia

    The Teutonic Bore deposit lies in a major greenstone belt within the Archaean Yilgarn craton of Western Australia. It occurs towards the base of a suite of tholeiitic basalts, some 100 m above a felsi

    Jan 1, 1984

  • AUSIMM
    The Grande Côte Mineral Sands Project

    By M C. Ackland

    The Grande Côte Mineral Sands Deposit (GCMSP) is located on a coastal mobile dune system in Senegal on the west coast of Africa. Senegal is a stable, democratic republic, having gained its independenc

    Oct 5, 2011

  • AUSIMM
    Japanese Experiences in Underground Coal Gasification-A Review

    By Ueki S

    Underground coal gasification (UCG) is a promising process for obtai- ning energy from coal, which is either unmineable with current mining techno- logy or uneconomic to recover, using conventional

    Jan 1, 1987

  • AUSIMM
    The High Productive Operation of a Small Blast Furnace

    By Fukui M

    An increase in pig iron output by 50 per cent was aimed at after re-lining No.2 blast furnace of NAKAYAMA STEEL WORKS. This had to be achieved by increasing both the furnace volume (from 673 to 757

    Jan 1, 1980

  • AUSIMM
    The Hamata Gold Prospect, Morobe Goldfield, Papua New Guinea

    By Mowat B. A

    I lamata is within the Morobe Goldfield (7¦ 25' S, 146¦ 39' E) on the Wau (SB 55-14),1:250,000 scale map sheet (Fig 1). The deposit is 13 km SW of Wau, within the headwaters of the Upper

    Jan 1, 1997

  • AUSIMM
    Precipitation of Mercury from Process Liquors with Aluminium

    By Bratt G. C, Horsham T. R, Langlois D. R

    Mercury is precipitated from weakly acidic sulphuric acid plant waste liquor at the Risdon Works of the Electrolytic Zinc Company of Australasia Limited. Factors determining the choice of process a

    Jan 1, 1977

  • AUSIMM
    Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan

    Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha

    Jul 25, 2018

  • AUSIMM
    Influence of Shot Design Parameters on Fragmetation

    By Smith N. S, Rholl S. A, Otterness R. E

    The Bureau of Mines is conducting research to develop blast designs for the control of fragmentation and rock displacement and the reduction of overall mining costs. This Bureau experiment, a progra

    Jan 1, 1990

  • AUSIMM
    An Automated Analyser for Mine Geological Sample - Operational Performance

    By Ryan A, Dennis R, Dekker D, Ellis W, Sowerby B

    An automated facility for non-destructive elemental analysis of mine samples has been developed and tested at Mount Isa in association with the CSIRO. The analysis is based on the prompt and delayed m

    Jan 1, 1993

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Surface Cooling at Kidd Creek Mine

    By K Hortin

    Kidd Creek mine in north western Ontario is developing phase 1 of the deep mine project for mining between 2100 m and 3100 m below surface. Heat problems were experienced during the 2003 summer in wor

    Jan 1, 2005

  • AUSIMM
    Vivien Mine modelling back analysis to forecast ground conditions and ground support

    By J Player, P Mikula, G Sweby

    A numerical modelling back-analysis exercise was carried out at a WA gold mine at which early signs of seismicity (rock noise, scatts from active faces) were becoming apparent as depth of mining incre

    Nov 29, 2022