Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour
By I. L. Follington
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to
Jan 1, 1992
-
Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines
By Yoshiaki Fujii
Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat
Jan 1, 1992
-
Resupporting High Roof Falls
By Nicholas Chlumecky
One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is
Jan 1, 1981
-
Using The Point Load Test To Determine The Uniaxial Compressive Strength Of Coal Measure Rock (993fe9c2-59a0-4335-9e4c-58da9811402f)
By John A. Rusnak
Point load testing is used to determine rock strength indexes in geotechnical practice. The point load test apparatus and procedure enables economical testing of core or lump rock samples in either a
Jan 1, 2000
-
Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions
By Hui Chen
The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en
Jan 1, 1993
-
Critical Roof Span Approach To Selection Of Proper Coal Mine System
By Antoni Kidybinski
Coal mining both with longwall and room-and-pillar method often encounters severe operational difficulties due to had roof conditions. Rooffalls at entry cross-cuts or along the rib line in longwalls
Jan 1, 1982
-
Evaluation Of Support Performance In A Highly Stressed Mine
By Hamid Maleki
The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5
Jan 1, 1994
-
Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions
By M Nombe
Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was
Jan 1, 2002
-
Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress Report
By Yi Luo
Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und
Jan 1, 2002
-
Floor Heave Control Outby the Seal Line in No. 11 West Kentucky Seam
By Joel Bradley, Kot Unrug, Kyle Perry, Mark Klimek
"A West Kentucky mine operation in No. 11 seam, encountered floor heave, due to the localized increase of the thickness in the fireclay mine floor. Floor heave has overridden seals installed in two mi
Jan 1, 2015
-
Innovative Ground Support System (23660f1b-763d-4a59-bd83-98b27cd5764f)
By P. A. Gray
Artificial ground support has developed into a relined science over the past 20 years. From reactive support systems such as timber props and steel supports, to active systems such as roof bolts and c
Jan 1, 1992
-
Downhole Overcoring Stress Measurement at a Western Underground Coal Mine
By David Conover
Knowledge of the magnitude and direction of the horizontal secondary principal stresses is a critical factor in designing the layout and mining sequence of underground openings. Typically, horizontal
Jan 1, 2004
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden
By Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016
-
Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control
By Anil Mahyera
Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),
Jan 1, 1981
-
Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining Conditions
By Ruixiang Gu
The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie
Jan 1, 2014
-
Determining Horizontal Stress Direction Using The Stress Mapping Technique
By T. P. Mucho
Mine roof failure due to excessive horizontal stress has been recognized as a major cause of hazardous roof conditions in some mines. Stress measurements gathered by the U.S. Bureau of Mines (USBM) at
Jan 1, 1994
-
Field Testing of a Real Time Roof Mapping Drilling Display System in a Limestone Mine
By Craig Collins
The objective was to develop a Real Time Drilling Display System for Rotary Roof Bolting using Analyzing Software to display mapped holes as they are being drilled in real time. The Analyzing Softw
Jan 1, 2004
-
Measurement Of Structural Deformation And Tilt During Subsidence
By Revendra Awasthi
The application of a horizontal inclinometer and a tiltmeter to measure tilt, curvature, and deformations of shallow footings during mine subsidence is described. The measurements were taken during mi
Jan 1, 1990
-
In Situ Stress For Underground Excavation Design In A Naturally Fractured Rock Mass
By Andrew J. Hyett
The ISRM commission on testing methods has recently presented Suggested Methods for rock stress determination (Kim & Franklin, 1987). This proposes that even if the magnitude of in situ stress is not
Jan 1, 1989
-
Successful Application Of Hydraulic Fracturing To Control Windblast Hazard At Moonee Colliery, NSW, Australia
By Ken Mills
This paper describes the first successful use of hydraulic fracturing to induce caving events "on demand" in Australia. Moonee Colliery operate a longwall immediately below a thick conglomerate strata
Jan 1, 2000