Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Black Mountain overview: The resolution of the lands unsuitable petition from legal and technical perspectives

    By M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner

    In 1998, a group called Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903± hm2 (22,000± acre

    Jan 1, 2002

  • SME
    Fine Coal Screening Techniques

    By Robert G. Moorhead

    Fine-coal screening can be one of the most critical operations in a modern coal-cleaning plant. The yield and quality of clean coal produced in fine-coal circuits is controlled as much by how efficien

    Jan 1, 1988

  • SME
    Do Engineers Make Good Managers?

    By James R. Arnold, Timothy D. Arnold

    The mathematical rigor of the collegiate engineering experience prepares an engineer well for the technical aspects of his or her career. However, as that engineer progresses in the industry, how well

    Jan 1, 2001

  • SME
    Flotation Column For The Recovery Of Coal Fines

    By S. R. S. Sastri, K. K. Bhattacharya, K. S. Narasimhan

    Experimental results obtained on the recovery of below 0.5 x 10-3m coal fines by flotation employing geometrically similar columns of 0.056m, 0.080m, 0.100m and 0.220m diameter have been presented. Th

    Jan 1, 1988

  • SME
    Commercialization Of A Column Flotation Circuit For Gold Sulfide Ore

    By K. N. (Mani) Subramanian

    A 2.5 meter diameter column has been successfully used in a 100 tph flotation plant at the Harbour Lights Mine in Leonora, Western Australia, to produce a final gold bearing sulfide concentrate from t

    Jan 1, 1988

  • SME
    Cavity detection using high-resolution seismic reflection methods

    By K. L. Branham, D. W. Steeples

    Surface collapse over abandoned sub- surface coal mines continues to be a problem in many parts of the world. High-resolution P-wave reflection seismology was successfully used to locate water-filled

    Jan 1, 1987

  • SME
    Powder Surface and Polymer Structural Changes in Ultrafine Grinding in Stirred Media Mills

    By Colin C. Harris, Jie Zheng, P. Sornasundaran

    Powder surface and polymer structural changes during stirred milling have been studied as a function of grinding time, solid concentration and polymer molecular weight. It was found that specific surf

    Jan 1, 1998

  • SME
    Use of a Total Flammable Gas Detector in Mine Recovery

    By J. E. Chilton

    Methanometers with catalytic heat- of-combustion sensors used in coal mines today will read low for flammable gases when oxygen (0,) concentrations are low or when methane (CH,) concentrations are gre

    Jan 1, 1992

  • SME
    Environment - Land (e6bb9dc1-fceb-4ca7-8259-6787960c2e71)

    By Carl (Original by) Hrovatic

    Land is a precious resource and should be treated as such by all members of our society. The soil covering this earth is only a very thin outer layer, varying in thickness from a few inches to a few f

    Jan 1, 1981

  • SME
    Role Of Fundamentals In Flotation Plant Operations

    By Brij M. Moudgil

    Lack of understanding the major process parameters and inadequate scale-up factors have led to the belief that fundamental knowledge is not important for successful flotation plant operations. Flotati

    Jan 1, 1993

  • SME
    Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft Ground

    By Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna

    This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los

    Jan 1, 2003

  • SME
    Discrete Element Modeling In Mineral Processing

    By Barada K. Mishra

    The potential merit of the discrete element method (DEM) as a numerical tool for analyzing process engineering problems involving particulate material is discussed. In this method, the dynamic equilib

    Jan 1, 1993

  • SME
    Abandoned Quarry Sites And Applied Rehabilitation Solutions

    By G. Konstantopoulou

    Environmental degradation due to abandoned quarries is an international problem, more intense when these sites are found in urban or suburban zones, in environmentally sensitive areas or are visible f

    Jan 1, 2008

  • SME
    Deposit Modeling to Mine Production in an Open Pit Copper Molybdenum Mine

    By Thomas G. Johnston, Garston H. Blackwell

    The development of a block model for a copper molybdenum ore deposit is described. The early use of the inverse distance power estimator, and later transition to geostatistics and kr iging, produced b

    Jan 1, 1987

  • SME
    Remediation Of The Warm Springs Ponds Complex, Montana

    By W. R. Hail

    A proactive design and construct approach was used to remediate the Warm Springs Ponds Complex near Anaconda, Montana under "Superfund". The pond complex is used for treatment/settlement of heavy meta

    Jan 1, 1995

  • SME
    Optical Analysis Of Metal Content In The Column Complex Ore Flotation Froth

    By Jacek Galas, Stanislaw Lenczowski

    The image of the flotation froth surface in the mineral processing plant contains the information about its composition. This information can be very useful for a technological process automation. Ima

    Jan 1, 1995

  • SME
    Underground Haulage

    By Niles E. Grosvenor

    One of the most important considerations in the efficient operation of an under¬ground mine is the haulage system. Often the determining factor between profit or loss is the quick removal of ore and w

    Jan 1, 1973

  • SME
    Simulation Based Selection of Underground Coal Mine Degasification Methods

    By J. J. Schwoebel, M. J. Mavor

    Rapid coal extraction techniques in gassy mines may strain a ventilation system if a degasification approach is not utilized. Design of mine ventilation systems requires estimates of gas emission rate

    Jan 1, 1991

  • SME
    Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)

    By Jeff Salai

    The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa

    Jan 1, 2001

  • SME
    Assessment of on-Board scrubbers for use on Continuous Miners in South African Collieries

    By Jan W. Oberholzer, Jan J. L. Du Plessis, Gerard Appelman, Andrzej M. Wala

    The use of on-board scrubbers on continuous miners is an important aspect in efforts to reduce the amount of dust that heading workers are exposed to. As part of the CSIR:Mining Technology's rese

    Jan 1, 1995