Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Process Selection, Design, Commissioning and Operation of the Sao Bento Mineracao Refractory Gold Ore Treatment ComplexBy Barry N. Doyle, Tarcisio M. Carvalho, Alan K. Haines, Marcos P. de Melo, Edward J. da Silva
A metallurgical complex to recover gold from highly refractory arsenical ore was recently commissioned by Sao Bento Mineraco. The plant, with a nominal capacity of 20 000 tonnes per month, is situated
Jan 1, 1989
-
Ordered Rock Mass Properties - I. Introduction - A. ScopeBy Lawrence Adler
The properties of a geologic mass may be considered from a resource or an engineering viewpoint. The primary engineering applications include ground control, excavation, bulk handling, and hydrology.
Jan 1, 1973
-
Utilizing Strain Criteria To Predict Highwall Stability Performance (10e369fc-18a0-48fc-b1e4-6da683b035af)By H. W. Newcomen, D. R. Brox
Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents
Jan 1, 2004
-
Squeezing Ground: Conditions & Lessons Learned at the New Irvington TunnelBy Yiming Sun, David Tsztoo, Rick Nolting, Adam M. Wirthlin, Rebecca Fusee
"Excavation and initial support of the New Irvington Tunnel presented significant challenges, including rapidly changing ground conditions, heavy ground loads, and squeezing. Such behaviors were antic
Jan 1, 2016
-
A Microcrack Model for the Deformation and Strength of Algerie GraniteBy Paul E. Senseny
Data from triaxial compression tests per- formed at confining pressures between 0 and 100 MPa are used to evaluate parameters in a contitutive model that is based on microcracking. The tensorial formu
Jan 1, 1986
-
Preliminary Indications of Repeatability and Reproducibility of the ASTM 5744-96 Kinetic Test for Drainage pH and Sulfate Release RateBy Kim A. Lapakko, William W. III White
The ASTM standard method D 5744-96 was developed to provide a well-defined kinetic test protocol, conducted under controlled reaction conditions, with the intent of generating reproducible results. Th
Jan 1, 2000
-
Empirical Correlation To Determine Laboratory Mill Grinding TimeBy V. M. Torres
An empirical correlation to detennine laboratory mill grinding time has been developed. Grinding samples to 90 ± 5# below 147 micrometers was required for a flotation testwork at Companhia Vale do Rio
Jan 1, 1996
-
Effects Of Sizing Equipment Efficiency On Product Gradation And Weight Splits ? The ProblemBy J. P. Vandenhoeck
Sizing devices used commercially are unfortunately not 100% efficient, the splits that can be obtained are usually inferior to the results obtained in the laboratory. Often the capital and operating c
Jan 1, 1965
-
Recovery Of Mercury From Spent Silver Oxide Button Cells (e9a6e483-a758-4188-a44f-0e705cf6d0aa)By S. Aktas
The present work describes an investigation of a hydrometallurgical process for the recovery of mercury from spent silver oxide button cells. The cell paste was leached in nitric acid to solubilize si
Nov 1, 2011
-
Recovery Of Mercury From Spent Silver Oxide Button CellsBy S. Aktas
The present work describes an investigation of a hydrometallurgical process for the recovery of mercury from spent silver oxide button cells. The cell paste was leached in nitric acid to solubilize si
Jan 1, 2011
-
The influence of drawbell geometry on hang-ups during ore extractionBy Dion Weatherley, Raúl Castro, RENE GOMEZ, Pablo Cid
The study examines the impact of different drawbell geometries on hang-ups during ore extraction in underground mining. Using the discrete element method, the research compares three drawbell geometri
Sep 1, 2023
-
Hydrogeologic characterization and mining impact analysis of a low-yield, fractured graniteBy Michael Day, Paul Kos, Scott Brinton
Quantitative hydrogeologic characterization of fractured rock is challenging because fracture systems are convoluted and difficult to characterize discretely. For large-scale water resource impact ana
-
How Good Is My Maintenance Program?By John D. Katsllometes
In the mining and processing industry, the maintenance plan has often evolved rather than being consciously set up resulting in an overreliance on breakdown and fixed-time maintenance (planned mainten
Jan 1, 2004
-
Video Data Analytics For Quantitative Measurement Of Feeder Ore Flow Characteristics In Underground Systems - SME Annual Meeting 2022By J. Fastle, M. Weinstock
The block cave mining method utilized by PT Freeport Indonesia (PTFI) generates fines and allows the inflow of water. Both constituents have contributed to unfavorable characteristics: an increase in
Mar 2, 2022
-
Control Of Mining-Induced Seismicity In The Western U.S. Room And Pillar Mines At Great DepthsBy Hamid Maleki
Mine seismicity is influenced by the mechanical properties of both near-seam rocks and overburden and the prudent selection of mining methods and mine layout designs. Using finite-difference modeling,
Jan 1, 2009
-
Identifying Longwall‑Induced Fracture Zone Height Through Core DrillingBy Peter Zhang, Daniel Su, Mark Alexander Van Dyke, Heather Dougherty, Bo Hyun Kim
The National Institute for Occupational Safety and Health (NIOSH) has been evaluating longwall mining-induced strata fractures and their impacts on casing stability of Marcellus shale gas wells locate
Jun 9, 2022
-
Promoting Illinois coal utilization through underground disposal of combustion productsBy A. Unal, H. Sevim
The utilization of high-sulfur Illinois coal by utility plants has been decreasing since the enactment of the 1990 Clean Coal Air Act Amendment. Illinois coal producers can make their coal more attrac
Jan 1, 1999
-
Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp
Jan 1, 1999
-
The Risks Associated with TBM Procurement and the Next Steps toward Industry ChangeBy Gary Brierley, Lok Home
"The majority of tunnels for civil engineering applications are now being constructed using some form of mechanical excavation. Beginning in the 1960s with rock tunnel boring machines (TBM), the tunne
Jan 9, 2018
-
A Kinetic Comparison Of Coal Pyrolysis And Coal DissolutionBy Wendell H. Wiser
A comparison is presented of coal pyrolysis at temp¬eratures ranging from 4090 to 497°C and thermal dissolution of coal in tetralin at temperatures ranging from 350° to 450,°C, both utilizing a Utah h
Jan 1, 1967