Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Roof Bolter Rocker Pad Deflector Systems
By Arnold Hammons
Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby
Jan 1, 2009
-
Evaluation of Whole‑Body Vibration Exposure of Dozer Operators, a Task‑Based Approach
By Bülent Erdem, Zekeriya Duran, Tuğba Doğan
The objective of this study was to evaluate the potential health risk associated with exposure of dozer operators to whole-body vibration. Measurements were made on 31 dozers used in different surface
Jun 16, 2022
-
Recovery of Valuable Elements from Chinese Coal By-Products
By M. Fan, Z. Long
"This paper presents some studies on recovering valuable elements from Chinese coal by-products, including coal combustion fly ash, stone coal ash, and coal flotation tailings. Both commercialized tec
Jan 1, 2017
-
TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? Case
By Enrique Fernández
INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l
-
Tunnelling on the South East Transit Project
By T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota
By J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington
EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal
Jan 1, 2004
-
Islais Creek Contract E: Tunneling Through Jet Grouted Bay Mud
By D. N. Adams, M. M. Wong, M. J. Robison
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The p
Jan 1, 1997
-
Adeco As An Alternative To NATM: How It Works, WHY It Works
By Fulvio Tonon
And Rabcewicz said ?tunnels should be driven full face whenever possible.? ADECO, which stands for ?Analysis of Controlled Deformations in tunnels,? now allows us to fulfll Rabcewicz?s dream in any st
-
Holistic planning and approval of sustainable lignite mining and utilization
By L. Kulik, J. den Drijver
Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n
Jan 1, 2011
-
Magmont Mine Closure Under Missouri Metallic Minerals Act
By M. F. Bradley, G. M. Schoen
The Magmont Mine, a 50/50 venture between Cominco American Incorporated (the Operator) and Dresser Industries, Inc., (Halliburton), is a metallic mining and milling facility in the new lead belt of Mi
Jan 1, 2001
-
Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)
By M. L. Harris
In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo
Jan 1, 2008
-
Flotation And Wettability Of A Low Rank Coal In The Presence Of Surfactants (6807b6c9-4d11-4f22-80fd-ca04ad9d51fb)
By S. Chander
A series of nonionic and anionic surfactants were tested to enhance the flotation response of a low rank coal. An ethoxylated octyl phenol and several polypropylene polyethylene block copolymers were
Jan 1, 1993
-
Influence of Rock Mass Properties on Performance of Hard Rock TBMs
By Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh
Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec
Jan 1, 2005
-
Evaluating Ground Conditions Ahead of a TBM Using Probe Drill Data
By Steven K. Duke, Jay Arabshahi
An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system
Jan 1, 2007
-
Practical Tunnel Lining Design Methodology and Guidelines—A Series of Tunnel Design Papers
By Bradford F. Townsend, Colin R. Speers
INTRODUCTION This is the first in a series of papers addressing practical tunnel lining design. The format for this and future papers is to present a particular topic and support the presentation o
Jan 1, 2005
-
Development and Scale-Up of Large Flotation Cells
By Nathaniel Arbiter
Flotation’s earliest patent was issued in 1860. However, the process was first applied commercially in Australia until 1904, and in Montana in 1911. Major advances followed both in reagent treatment
Jan 1, 2000
-
Industrial Minerals 2004 - Lime
Lime production is the largest single chemical use for limestone and dolomite. The term “lime” in this review refers to high-calcium and dolomitic quicklime, their hydroxide forms and dead-burned dol
Jan 1, 2005
-
Water Tunnel Beneath New York Harbor
By Mohammad R. Jafari
The Camp Dresser & McKee (CDM)/Hatch Mott MacDonald (HMM) joint venture has been engaged by the New York City Economic Development Corporation (NYCEDC) to provide engineering ser-vices in connection w
Jan 1, 2008
-
The Effect Of Bit Geometry And Size On Cutting Parameters In Linear Cutting
By A. W. Khair
This paper deals with the design characteristics of cutting tools and the operating parameters these tools are usually subjected to. Eight types of cutting tools/bits with different geometrical shapes
Jan 1, 2001
-
Construction Of Shin-Kanmon Tunnel On Sanyo Shinkansen
By Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976