Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation Method
A practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor
Jan 7, 2020
-
Industrial Minerals 2005 – Feldspar and Nepheline Syenite
By W. Z. Rogers
U.S. feldspar output sold or used in 2005 was an estimated 760 kt (838,000 st), valued at $44 million free-on-board plant. This was below the 2004 volume and was the second year of decline in a row.
Jan 1, 2006
-
Processing researchers continue efforts to streamline US mining
By P. Rosten
US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing
Jan 5, 1985
-
St. Louis Skinker–McCausland Tunnel
By Jozef F. Zurawski
River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec
Jan 1, 2001
-
Prediction of Ground Vibration Induced Due to Single Hole Blast Using Explicit Dynamics Mining, Metallurgy and Exploration (5745d634-e632-4178-ad6f-441932595fe2)
By R. K. Sinha, B. S. Choudhary, Desh Deepak, A. K. Mishra, Hemant Agrawal, Shankar Kumar
There are several methods (empirical, statistical, and machine learning tools) to calculate blast-induced ground vibration. Still, due to complications in the blasting procedure, under varying blastin
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project
By Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
Rougher Automation In Escondida Flotation Plant
By S. Kittel, P. Galleguillos, H. E. Urtubia
The rougher flotation at Escondida consists of 80 cells of 100 m3 each, with injected air. Escondida has developed a system of automatic control of the rougher flotation using video cameras, which hav
Jan 1, 2001
-
Risk Management In Action—Controlling Difficult Ground By Innovation
By A. Moergeli
The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco
Jan 1, 2007
-
The Tichauer-DeTomi Matrix: a Tool for Assessment of Geological Uncertainty in Small-scale Mining Mining, Metallurgy and Exploration (9437b467-4b8d-4115-856e-5795cdbb6370)
By Giorgio De Tomi, Ricardo Tichauer
Mineral exploration is a critical step for success in mining. However, small-scale mining often ignores exploration best practices. This paper introduces the Tichauer-DeTomi Matrix, a tool for assessm
-
The Río Agrio Basin, Argentina: A Natural Analog To Watersheds Affected By Acid Mine Drainage
The Río Agrio of northern Patagonia, Argentina, is highly acidic due to inputs of volcanic gases (SO2, HCl, HF) in its headwaters. The watershed includes a hyper-acidic (pH <0.5) volcanic crater lake,
Jan 1, 2008
-
Operators Use First-Out Fault Detection To Dramatically Reduce Equipment Downtime
By R. Schulz, K. King
Concentrating Line 6 just went down again. The control room operator checks the graphic display. Only one piece of equipment shows an alarm. Clicking on the ball mill icon, he discovers the culprit wa
Jan 1, 2001
-
Effect of Operating Parameters on the Breakage Process of Calcite in a Stirred Media Mill Mining, Metallurgy and Exploration
By Diler Katircioglu-Bayel, Oner Yusuf Toraman, Safak Gokhan Ozkan
One of the most energy-intensive processes for producing submicron range calcite is stirred media mill. In the present work, numerous operating parameters such as solid mass fraction, grinding media s
-
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
By Brian Fulcher
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1
Jan 1, 2008
-
Gathering And Managing Environmental Quality Data For Mining Projects - Preprint 09-005
By D. W. Rich
An environmental management system (EMS) is a key part of a company?s environmental stewardship. Procedures and practices to continually improve environmental performance can provide great benefits in
Jan 1, 2009
-
Metal Bioaccessibility Methods in Risk Assessment
By A. Thatcher, C. Day, C. Meyer
The purpose of this paper is to provide general information about the bioaccessibility of metals and specific information about the use of bioaccessibility in risk assessments (human health risk asses
Jan 1, 2019
-
Latitudinal/land-mass proximity controls on ferromanganese crust composition and resource potential, Ninetyeast Ridge, Indian Ocean
By Kira Mizell, James R. Hein, Tracy Conrad
"The Ninetyeast Ridge (NER) extends roughly N-S as a topographic feature for 5000 km, from 31° south to 10° north (Fig. 1) where it becomes buried beneath the Bengal Fan at its northern end. These two
Sep 1, 2014
-
Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in Tunneling
By Remo Grandori
The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve
Jan 1, 2001
-
Methods To Improve Mine Ventilation System Efficiency - Introduction - Preprint 09-070
By C. Pritchard
John Marks said in his acceptance of the Hartman Award in 2008 ? ?I guess that without the occasional complaint, your mine is probably over-ventilated? (Marks, 2008). Miners are seldom in this situati
Jan 1, 2009
-
Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick
By W. R. Dengler, R. S. Brown
In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26
Jan 1, 1976
-
Pressure leaching of copper concentrates at Morenci, Arizona – 10 years of experience Mining, Metallurgy and Exploration
By J. O. Marsden, C. Green
In 2003, a high-temperature pressure leaching circuit to treat copper sulfide concentrates was commissioned at the copper/molybdenum operation at Bagdad, AZ. In late 2007, a medium-temperature pressur