Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rock Mass Response To Mining Longwall Panel 4N, York Canyon Mine (7fd13e90-6106-40aa-b184-7520ddae1741)By Donald W. Gentry
This paper presents some of the results of a rock mechanics in¬strumentation program designed for, and implemented at, longwall panel 4N at the York Canyon Mine near Raton, New Mexico. The objective
Jan 1, 1977
-
Reduce Urban Tunnel Utility Relocation Risk through Early Relocation by Specialty ContractorBy Justin Carl, Aliuddin Mohammad, Gordon Evans, Steven Bealby, Carlton Ray
"The District of Columbia Water and Sewer Authority (DC Water) is implementing the $2.2-billion DC Clean Rivers Project (DCCR) to control combined sewer overflows (CSO) to the Anacostia and Potomac ri
Jan 9, 2017
-
Feldspar Beneficiation: Tailoring Reagents to the MineralBy G. Wang, L. R. Moore, Y. Xiong, A. Gorken
"Feldspar may represent 60% of the earth’s crust, but the mineral does not exist in a pure state. It is generally associated with quartz, iron containing minerals such as mica, and titanium containing
Jan 1, 2016
-
A Dynamic Programming Algorithm for Selecting Evenly Spaced Pushbacks from Nested PitsBy Kadri Dağdelen, Matthew Deutsch, Thys Johnson
Nested pit analysis in open-pit long range mine planning is used to define approximate ultimate pit limits and an initial high-level schedule in the early stages of a project. Modern ultimate pit opti
Jun 25, 2023
-
An Automated X-Ray Spectrometric And Diffraction Analytical System As An Efficient Tool For Bauxite ExplorationBy E. O. Strahl
In the search for economic mineral deposits, the need for efficient mineral or chemical assays is of prime importance. Costly analytical methods and long delays in obtaining assay results severely lim
Jan 1, 1977
-
Evaluation of Operational Strategies for Heap Leaching of Gold Ores under Sub-Zero Temperatures, Coffee Project, Kaminak GoldBy T. Schrauf, J. Scott
"INTRODUCTION Cyanide heap leaching of gold ores in areas with extremely low winter temperatures requires special considerations to prevent freezing of the leach solution. Factors that impact the solu
Jan 1, 2016
-
Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low OverburdenBy Chris Ashton, Andreas Rädle, Taner Aydogmus
"The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich
Jan 1, 2016
-
The Risks in Fundamentals of Recoverable Resource ModelsBy M. E. Rossi, J. A. Bassan, J. B. Novillo
Sampling and geological models are the basis of recoverable resources models. They are pillars of mineral resources and reserves estimation, and what geostatistical methods for grade estimation should
Jan 1, 2019
-
Analysis Of Truck Dispatching Strategies Forsurface Mining Operations Using SIMANBy B. Kolonja
A SIMAN and CINEMA PC-based simulation model was developed to simulate and animate the truck-shovel operations of surface mines. The model is capable of simulating one mathematical dispatching strateg
Jan 1, 1993
-
Evaluation of an E-field through-the-earth (TTE) communications system at an underground longwall mine in West Virginia"A commercially available through-the-earth (TTE) communications system was evaluated at an active underground longwall mine in West Virginia. This TTE system uses electricfield (E-field) sensing to s
Sep 1, 2016
-
Porgera Gold Project- Process Development - Preconcentration And Pressure Oxidation Of Porgera Refractory Gold OreBy D. Robert Weir
The complex mineralogy of the Porgera resource has a pronounced effect on process selection for the recovery of refractory gold and silver. Intimate association of gold with pyrite necessitates a high
Jan 1, 1986
-
Development Of Steel-Fiber-Reinforced Concrete Cribs To Replace Wood Cribs In Underground Coal Mines (PRIPRINT 84-13)By N. S. Tanious
The need to provide better mine roof support and control in longwall tailgate entries prompted the Bureau of mines to search for a replacement product for wood cribs. Their search isolated steel-fiber
Jan 1, 1984
-
Influence of blasting techniques on open pit economicsBy H. G. Naidu, Raj K. Singhai, S. P. Singh
Introduction The economics of open-pit mining de¬pend heavily on the cost of overburden removal. It is necessary to maintain a pit slope as steep as possible. Steeper slopes lower the volume of overb
Jan 1, 1989
-
In-Situ Underground Bioleaching – Novel Conditioning TechnologiesBy R. Schlüter
"The “Biohydrometallurgical Center for Strategic Elements (BHMZ)” is a cooperation of 13 departments of the Technical University Bergakademie Freiberg fostering interdisciplinary research along the wh
Jan 1, 2015
-
The Changing Sulphur Picture - U.S. And The West ? IntroductionBy Paul A. Rittenhouse
Its a pleasure to be with you this afternoon and to talk briefly on one of my favorite subjects -- the U.S. sulphur industry. As our Chairman mentioned, I have been associated with the sulphur industr
Jan 1, 1975
-
Beyond Geology: Incorporating Variability And Uncertainty Into Evaluations Of Cement Raw MaterialsBy G. R. Luster
In most current practice, the methods that are employed in technical evaluations of cement raw materials are deterministic; i.e., decisions among alternative raw mixes and alternative plant designs ar
Jan 1, 1987
-
Mitigation Of Water Contamination At The Historic Ferris-Haggarty Mine, Wyoming (8fdc0081-3515-4b69-b988-6d9ea3861c78)By R. W. Reisinger
An historic underground copper mine in Wyoming is discharging neutral but copper-laden water into a pristine creek. The EPA-deferred site qualifies for reclamation by the Wyoming Abandoned Mine Land (
Jan 1, 1998
-
Capital And Operating Costs For The Unit Processes Of Solvent Extraction And Electrowinning As Applied To Copper RecoveryBy G. A. Kordosky
Solution mining followed by solvent extraction-electrowinning (SX-EW) is one possible way to economically extract copper from ore bodies which cannot otherwise be profitably exploited. Published costs
Jan 1, 1986
-
The Pinon Pine IGCC Project: Coal And The Role Of Advanced, Coal-Fired Electric Power Generation PlantsBy J. W. Motter
Currently, virtually all new electric power generation systems under construction are designed with natural gas as the primary fuel. Factors driving these construction decisions involve sustained low
Jan 1, 1996
-
Floor Bolting For Control Of Mine Floor Heave (fc60805a-0d80-4a84-b600-b1023fffe3cf)By J. C. Stankus
Many coal seams are associated with soft floor strata and during mine development if coal pillars are not properly designed, floor heave occurs and causes interruption of coal production. In the sever
Jan 1, 1993