Quantitative Evaluation Of Fill Performance In South African Gold MinesBy N. C. Gay
The quantitative evaluation of the performance of fill materials placed in gold mine stopes is achieved by (i) measurement of the in-situ load- displacement, or stress-strain, characteristics of the m
Jan 1, 1988
-
Smart equipment allocation decisions and updating short-term stochastic production planning in mining complexes through reinforcement learning APCOM 2021By J. P. De Carvalho, R. Dimitrakopoulos
This paper presents an actor-critic reinforcement learning (RL) method to allocate trucks and shovels in open-pit mines, while defining short-term production scheduling of an industrial mining complex
Sep 1, 2021
-
Pre-Mining Stress Model For Subsurface Excavations In Southern AfricaBy M. F. Handley
This paper covers in situ stresses in the Earth?s crust prior to any man-made disturbances, such as mining. It introduces the Southern African Stress Database, which contains primitive stress measurem
Jun 1, 2013
-
Preconcentration Of UG2 Platinum Ore: Economic Benefits - SynopsisBy F. Smit
Mining and plant practices can benefit from preconcentration of UG2 platinum ores in a dense medium separation (DMS) plant. The main benefit of DMS is the selective discard of waste from the feed stre
Jan 1, 2013
-
Strategic factors and a model of enterprise restructuring in the coal industry in Europe with emphasis on experiences in a Slovenia-Velenje coal mine case - SynopsisBy E. Dervaric
The main purpose of this paper is to introduce the main strategic restructuring aspects of companies that are directly (coalmines) or indirectly (companies that depend on coalmines) linked to coalmini
Jan 1, 2008
-
Application of fuzzy set theory in the selection of underground mining method - SynopsisBy A. Karadogan
Decision making can be defined as the selection process of the best routes from the alternatives in order to achieve a goal, and mostly involves uncertainty. Additionally, mostly qualitative variables
Jan 1, 2008
-
A Comparison of Slope Stability Analyses in Two and Three DimensionsBy D. Wines
"Slope stability analyses have traditionally been undertaken in two dimensions assuming plane strain conditions. Although three-dimensional analysis techniques are widely available and used routinely
Jan 1, 2016
-
Modelling And Optimization Of Clean Chromite Production From Fine Chromite Tailings By A Combination Of Multigravity Separator And Hydrocyclone ? SynopsisBy S. Özgen
In this study, the possibility of beneficiation of chromite tailings in the Uckopru/Fethiye-Turkey region by a combination of hydrocyclone and multigravity separator (MGS) was investigated. The two si
Jan 1, 2012
-
Increasing the capacity of existing and new exothermic autoclave circuits (cb3a9a5e-99b3-409a-bbbf-2daa43eaba4a)By G. M. Dunn
Pressure leach autoclave circuits are employed in the leaching of ores, concentrates, mattes, alloys and intermediates for the recovery of metals into solution. Once the metals are extracted into solu
Jan 1, 2009
-
The Use Of Change Management And Behaviour-Based Training In An Improvement Project Aimed At Creating Organizational Sustainability In A Multicultural Mining Environment In ZambiaBy H. B. Prinsloo
Change management and training initiatives in remote rural settings in Africa are generally difficult to implement successfully due to factors such as varying levels of education, multiple nationaliti
Oct 1, 2013
-
Dam foundation design considering scattering of its deformabilityBy M. Nakamura, T. Akamatsu
Embankment dams are often constructed on soft rock foundations in Japan, so it is important to precisely predict deformation of the foundations due to fill placement at the design stage. In order to a
Jan 1, 2003
-
Evaluation of Iyoni II methanometers (567d462a-c8c7-4da5-8e49-14e8ecc75dfb)By J. E. Chilton
No regular monitoring of methane is required in areas of gassy coal mines outby the mining face. Methane ignitions that have occurred in mine outby areas indicate the need to provide better protectio
Jan 1, 2003
-
Determination Of Sampling Configuration For Near-Shore Diamondiferous Gravel Occurrence Using Geostatistical MethodsBy J. Jacob
Diamondiferous linear beaches in Mining Area No. 1 have been the mainstay of Namdeb?s diamond production for more than 80 years. Most of the onshore beaches have been mined out, but in recent years mi
Jan 1, 2014
-
Production of Pelletizing Concentrates From Zandrivierspoort Magnetite/Haematite Ore by Magnetic SeparationBy P. Muthaphuli
Kumba Iron Ore?s Zandrivierspoort (ZRP) magnetite-haematite project aims to mine and beneficiate a magnetite resource with low contaminant levels to produce from 1 Mt/a to 2.5 Mt/a product, which will
Jan 1, 2014
-
Reinforced Cemented Tailings FillBy L. Dison
There are many potential uses in gold mining for an initially stiff element of backfill that will yield at a predetermined load and maintain that load to beyond a compression of 30%. Such elements cou
Jan 1, 1988
-
Integrated Short- And Medium-Term Underground Mine Production Scheduling ? SynopsisThe development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The glob
Jan 1, 2012
-
Novel biomining options for processing of chalcopyrite and laterites, A. Schippers and S. HedrichBy A. Schippers, S. Hedrich
Chalcopyrite represents the most important copper resource and is currently mainly exploited using pyrometallurgy. Bioleaching is an environmental-friendly and economic alternative to conventional min
Jan 1, 2020
-
A Technical And Operational Audit Of The First 10 Years Of The Teniente Converter Operations At Nkana Smelter.By Milton Syamujulu
In 1994, Nkana smelter commissioned a Multimillion US$ Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce th
Jan 1, 2005
-
Fragmentation Studies And Metal Accounting Successes At Kopanang Mine. - SummaryBy FJ Fourie
Lack of success in attempts to develop viable large-scale continuous mining techniques (previously reported by MP o?Hare in 2004) led the team at Kopanang to explore alternative solutions to their ong
Jan 1, 2007
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural NetworkBy M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010