Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Blast Fume Management
By Alan B. Richards, Aleks Todoroski
The undesirable effects of blasting fumes can be controlled by minimising the amount of fume created, and by avoiding the movement of the fume plume to sensitive locations. Substantial progress has be
Jan 1, 2017
-
Blast Design Analysis for Reduction of Boulders Production
By Michael Karmis, Syed Muhammad Tariq, Zeshan Hyder
This paper analyzes the blast design for lime stone quarries of two major cement plants in Pakistan. The production blast of these quarries was resulting in excessive boulders production. At some inst
Jan 1, 2012
-
Utilising a Dual Belly Auger MPU to Manufacture Bulked Inhibited Explosives
By Jason Rock, Rob Thompson, Lee Julian
This paper presents an innovative shift in inhibited bulk products with specific reference to their manufacture and application.
Feb 1, 2020
-
Blasting for Wall Control and Stability using Electronic Detonators at the Bald Mountain Mine, Nevada
By Kurt Oakes, John Williams
Placer Dome, US operates the Bald Mountain Mine. The Bald Mountain Mine is a surface operation located in remote northwestern White Pine County in east-central Nevada, approximately midway between Elk
Jan 1, 2004
-
Increased Blasting Efficiency Through Operational and Geological Controls on Ore Particle Size
By W. Boas, R. Silva, D. Yumi, L. Steffen
The continuity of the flow and stages within the mining process is essential to achieve success in its operation and results, especially when it comes to a gold mine. During the first seven months of
Jan 1, 2024