Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology
By A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling
By Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, California
By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure
Jan 1, 2015
-
Army Corps Mega Projects Benefits From Innovative Foundations
By Dale Berner, Michael O’Sullivan
"This paper focuses on lessons learned from the innovative designs, in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers, USACE, Megapr
Jan 1, 2017
-
Northeast Boundary Tunnel – Mount Olivet Road Drop Shaft
By Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Smart Soil Improvement: The Use of Rigid Inclusions for Soil Consolidation
By Federico Pagliacci, Claudio Asioli, Marco Chiarabelli
"""Rigid inclusions"" are a consolidation method that provides improvement of soft soils thanks to the installation of cylindrical columns made up of a material with significant and permanent cohesive
Jan 1, 2017
-
Bearing Capacity of Post Grouted Drilled Shafts Using a Load Transfer Approach
By Miguel E. Ruiz, America L. Fernandez, Miguel A. Pandon
"Post-grouted drilled shafts (PGS) are a deep foundation system in which grout is injected at high pressure throughout the tip after the drilled shaft has been installed. Pressure grouting of drilled
Jan 1, 2005
-
120 Years of Caisson Foundations in Chicago
By Robert E. Schock, Eric J. Risberg
"Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which
Jan 1, 2016
-
Case Study of Deep Mix Pile Supported Diaphragm Wall for a Stilling Basin Structure in Malaysia
By Chandrasegaran, Tamilmani
"This paper describes a case study of a retaining wall structure using a diaphragm wall to construct a stilling basin at Tanjung Bin T4 power plant in Johor Bahru, Malaysia. The stilling basin is part
Jan 1, 2015
-
High Capacity Grouted Helical Piles
By Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar
"Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d
Jan 1, 2016
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical Island
By Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground Conditions
By Emad Farouz
This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan
-
Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)
By Dinesh Hinduja, Pérez: Miguel
"Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders
Jan 1, 2015
-
Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground Conditions
By Emad Farouz, Francis A. Abreu
"This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla
Jan 1, 2017
-
Vancouver Island Conference Centre Cutter Soil Mixer Technology Transforms Site
By Brian Wilson, John Scholte, Megan Atkinson
"In November 2004, the residents of the City of Nanaimo, B.C., Canada voted to approve a new conference centre as the centrepiece of a proposed revitalization project for the city’s historic downtown
Jan 1, 2008
-
Full Scale Uplift Load Testing of Micropiles in Cohessionless Soil
By M. Hesham El Naggar, Maged A. Abdlrahem
"Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi
Jan 1, 2016
-
Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, Toronto
By Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
Downdrag Effects on the Pile Groups Supporting Bridge Abutments
By M. Hesham El Naggar, Tony Sangiuliano, Alper Turan
"Bridge abutments supported on pile foundations are often constructed over weak and compressible soils. The consolidation settlements induced by the embankment loads are known to result in downdrag an
Jan 1, 2015
-
Application of Dry Jet Mixing to Earthquake Disaster
By Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) method as the representative deep mixing technique has been demonstrating best practice on ground mitigation works coping with complicated soil condition and limited site space.
Jan 1, 2015
-
Helical Pile Foundations at Tangier Island Substation
By Jeff Wilkinson, Brandon Walter
"A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp
Jan 1, 2017