Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Post-Katrina Emergency Interim Flood Protection

    By Fred Fuchs

    "Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many

    Jan 1, 2008

  • DFI
    Corrosion Protection Of Micropiles

    By Racquel Nottingham, Marc Mastrantuono

    Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide

    Oct 1, 2022

  • DFI
    Bedrock Evaluation For Deep Foundations Utilizing An Acoustic Televiewer, I-70 New Mississippi River Bridge, St. Louis, Missouri

    By Adrian M. Keller

    Borehole televiewers are downhole inspection devices available for high-resolution imaging of a borehole wall following rock coring. Borehole televiewers should be considered by geotechnical engineer

    Jan 1, 2010

  • DFI
    Session 21 "Grouting in Karst"

    By Jim Henry

    I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi

    Feb 10, 2003

  • DFI
    The FHWA Geotechnical Program for 2017

    "Every year during the Transportation Research Board (TRB) Annual Meeting in Washington D.C., the Federal Highway Administration (FHWA) National Geotechnical Team (NGT) takes time to talk about what w

    Jan 1, 2017

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    Design and Construction of Specialty Foundation for the Historic Virginia State Capitol Building

    By Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi

    "The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States

    Jan 1, 2005

  • DFI
    Testing Foundations for Major Minnesota Bridges

    By Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo

    Jan 1, 2013

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation USING PRESSUREMETER TESTING IN SLOTTED SLEEVE CASING

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • DFI
    Ground Freezing Combined Method for Urban Tunnel Excavation

    By Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto

    "The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three

    Jan 1, 2015

  • DFI
    Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in

    May 11, 2007

  • DFI
    Slurry Trench Design and Construction in Difficult Conditions (5812dfc0-6c6e-4d3d-988d-069d8f606655)

    By Peter Deming

    "PART 1 OF 2INTRODUCTIONSlurry trenches are the least cost hydraulic barrier available, if the excavated spoils can be recycled into backfill. As such, slurry trenches are constructed where possible,

    Jan 1, 2006

  • DFI
    Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of Piles

    By Hiren J. Shah

    Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai

    Jan 1, 2008

  • DFI
    A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse Embankment

    By Karen Dawson

    This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab

  • DFI
    A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE Embankment

    By Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin

    "This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a

    Jan 1, 2017

  • DFI
    Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)

    By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen

    "As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced

    Jan 1, 2017

  • DFI
    Session 24 "Compaction Grouting and Consensus Guide"

    By Richard Berry

    The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th

    Feb 10, 2003

  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003