Wadi Dayqah Dam Curtain
By Frank Haehnig, Harald Krenn, Harm-Christoph Claassen
"The Wadi Dayqah Dam Water Supply Scheme represents one of the most important projects implemented by the Sultanate of Oman to ensure sustainability of water resources. The principal components of the
Jan 1, 2016
-
Effects Of Confining Stress During Curing And Shearing On Shear Strength Of Lime-Cement Improved Clays
By Ingrid Engeset, Solve Hov, Arnfinn Endal, Per-Anders Mortensen, Priscilla Paniagua, Bjørn Kristian Fiskvik Bache
During the last decades, it has become common practice in the Nordic countries to use dry deep mixing in soft clays with lime and cement in for example deep excavation pits in soft clay, or as a reinf
May 1, 2022
-
1785 Massachusetts Ave. NW, Washington, D.C.
By Daniel Stevenson, Richard Guenther
"The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us
Jan 1, 2017
-
Seismic Design for the I-30 Crossing Project in Little Rock, Arkansas
By David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction
By B. De Paoli
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e
Jan 1, 1994
-
Experimental Study on the Bending Failure Properties of Cement-Treated Soil
By Takeru Fukaya, Tsutomu Namikawa
"The bending tensile stress occurs in the ground improvements when external forces are applied to the column and wall shaped ground improvements. Therefore, in the design of the column and wall shaped
Jan 1, 2015
-
Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)
By Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim
May 11, 2007
-
Special Aspects of Constructions with Deep Mixing Systems for Infrastructures
By Alexandra Weidle, Seffen Leppla, Rolf Katzenbach, Matthias Seip
"A lot of different deep mixing systems have been developed in the last decades for a wide spectrum of applications, e.g. retaining and foundations systems, soil improvement, sealing of toxic substanc
Jan 1, 2015
-
A Case Study - Drilled Pier Foundations for a New Atlanta Stadium
By Jean Wehbe, Daniel C. Brahana
"This paper presents a case history of drilled pier construction for a new stadium in Atlanta, Georgia. The stadium structure is supported on several different foundation types, with the heaviest ""me
Jan 1, 2017
-
Long-Term Performance of a Deep Mixed Column-Wall at Arabianranta Area (Helsinki, Finland)
By Leena Korkiala-Tanttu, Ilkka Vähäaho, Juha Forsman, Paavo Lahdenperä, Kalle Rantala, Osmo Korhonen
"District of Arabianranta (Helsinki, Finland) has been founded on an old seabed, which was filled with miscellaneous soil materials. The subsoil consists of very low shear strength clays and organic c
Jan 1, 2015
-
The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling Fluid
By Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Wick Drain Guide Specification (Method)
"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Tomographic Dst Algorithm For Stone Column Site Imaging And Characterization
By Gerald Verbeek, Erick Baziw
Stone columns are used in geotechnical site remediation to increase load-bearing capacity and reduce settlement of foundations. Stone columns also improve slope stability and increase the shear streng
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)
By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station Construction
By Gordon Chen
As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester
Jan 1, 2010
-
Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions
By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019
-
Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal Station
By Frank Albrecht, Brian McCarthy
"The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si
Jan 1, 1900
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future Generations
By John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
Design And Construction Of Drilled Shafts In Iraq
By Frederick C. Rhyner
The United States government sponsored the construction of a new vehicular bridge over the Diyala River in Bubriz, Iraq. This paper describes the geotechnical engineering for design and construction
Jan 1, 2009
-
Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)
By Danny Déry-Chamberland, Peter Bowman, Michael Byle
"The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on
Jan 1, 2016