    High Temperature Filtration in Soil Remediation

    By Mance G

    Today there are many different techniques of soil remediation used in Australia and throughout the world. This paper considers the thermal desorption remediation technique and, in particular, the a

    Jan 1, 1995

  • AUSIMM
    How Ore Deposits can be Overestimated Through Computational Methods

    By Watson DF

    Calculation of the amount of metal in an ore deposit or mining block should be approached by multiplication and integration of appropriate numerical manifolds describing the spatial distribution of

    Jan 1, 1987

  • AUSIMM
    Sustainable Flood Management ù A Case Study

    By I F. Wood

    Planning for flooding and assessment of flood impacts are important requirements for mining projects, as they are also for other types of development. With more intense development and concern from th

    Jan 1, 2003

  • AUSIMM
    Longwall Production - Review of Scheduling Factors and Overall Effects of Some Natural Hazards

    The results expected from a longwall face can best be estimated from the ideal production rate, determined by the capacity of the equipment and the conditions in which it is installed, the effective o

    Jan 1, 1991

  • AUSIMM
    The Minerology and Geochemistry of the Whim Creek Gossan

    The gossan developed from the Whim Creek Cu-Zn-Pb-Ag sulphide deposit, in the Pilbara region of Western Australia, occurs near the top of a ridge in a dissected plateau 01 moderate relief. The gossan

    Jan 1, 1982

  • AUSIMM
    Simulations of the Muyumkum Uranium Roll Front Deposit by Using Truncated Plurigaussian Method

    By H Beucher

    The uranium grade in roll front deposits is the result of successive processes that can be summarised in two steps. First a sedimentary phase, which gives the deposit support, then an oxidation-reduct

    Jan 1, 2006

  • AUSIMM
    Kinetics of Arsenic Removal from Lead Bullion

    By Happ J. V

    Factors affecting the rate of arsenic removal from lead bullion during softening processes were studied. Very high rates of removal could be obtained under conditions of intense agitation and read

    Jan 1, 1987

  • AUSIMM
    The Distribution of Cobalt in the Kalgoorie Nickel Smelter

    By Elliot B. J

    Cobalt is principally produced by hydrometallurgical means from the copper-cobalt ores of Zambia and Zaire. In addition cobalt is commonly found in minor quantities in association with nickel and c

    Jan 1, 1989

  • AUSIMM
    The Mechanism of, and Energy Release Associated with Outbursts

    A study is presented of the theoretically possible initiation systems for outbursts and the subsequent propagation mechanism.Previous occurrences of outbursts and their correlation to the theoretic

    Jan 1, 1980

  • AUSIMM
    Modelling Heap Leach Operations with Metsim

    Metsim is proving to be a powerful tool when designing a heap leach operation. The most useful outputs arc determining the fluctuations in pregnant solution recovery rate, make-up water rate, gold r

    Jan 1, 1994

  • AUSIMM
    Effects of Corrosion on Friction Rock Stabilisers: A Laboratory Study

    By Richardson G. W, Yap L. C

    Friction rock stabilisers (FRS) are steel-based, thin-walled tubular ground reinforcement widely used in underground mines in Western Australia. Following installation these stabilisers are subject

    Jan 1, 1996

  • AUSIMM
    Subsidence Prediction from the Beginning - Collie Coal Basin(Western Australia)

    By Evans A, Jones O

    Surface subsidence resulting from "total extraction" of coal in the Collie Basin first occured in 1987 when Western Collieries Ltd trialled the Wongawilli mining method. Because very little quantit

    Jan 1, 1992

  • AUSIMM
    The Influence of Medium Rheology on the Separation of Minerals in Dense Medium Drums and Cyclones

    By Baguley PJ, Napier-Munn TJ

    This paper presents preliminary resu]ts from field studies which were conducted to establish, among other things. the influence of medium viscosity on the partitioning behaviour of dense medium cy

    Jan 1, 1987

  • AUSIMM
    Heap Leaching

    The preferred alternatives in heap design and their motivation are identified as- -normal heap leaching, to be generally applied wherever possible, - flooded vat leaching, to be appliedwhere wetted or

    Jan 1, 1984

  • AUSIMM
    Evaluation of thermal conductivities of molten SiO2-Al2O3-CaO slags

    By M Zhu, G Tranell, J You, K Tang, X Ma

    The thermal conductivity of slag is critical for the efficiency of high temperature metallurgical processes such as the smelting reduction of ferroalloys, the ladle refining and the continuous casting

    Aug 21, 2024

  • AUSIMM
    Introduction of Battery Powered Coal Haulers into Board and Pillar Panel Production

    Powercoal Pty Ltd operates eight underground coal mines in New South Wales and produces coal for both domestic power stations and the export market. Approximately 40% of total production is from conti

    Jan 1, 1998

  • AUSIMM
    The Flow Properties of Colliery Spoil Rockpaste as used in the Infilling of Abandoned Mine Workings

    By S T. Jarvis

    Colliery spoil is the major constituent of colliery spoil ærockpasteÆ which has been used to infill abandoned limestone mines in the West Midlands of England since the early-1980s. The other constitue

    Jan 1, 1998

  • AUSIMM
    Ore Pass Systems in Quebec Underground Mines

    By J Hadjigeorgiou

    Underground mines often rely on ore pass systems to ensure the transport of ore and waste. Consequently, it is important to ensure the smooth operation of such systems. Ore pass degradation that may r

    Jan 1, 2003

  • AUSIMM
    Tarnagulla Gold Mine

    By L Faulkner

    The Tarnagulla Gold Project in Central Victoria, Australia, was developed and operated by Reef Mining NL between 1994 and early 2000, producing 53 000 ounces of gold from the Nick OÆTime Shoot, a sing

    Jan 1, 2008

  • AUSIMM
    The Development of Hunter Valley Coal Preparation Plant

    By White PJ, Worrad C

    The Hunter Valley Coal Preparation Plant and associated materials handling facilities commenced operation in mid 1982. The new plant and coal handling system were designed to integrate with existing m