Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Systems thinking and its need in the workforce of tomorrowBy D Brown, K Markovic
The world is becoming an increasingly complex environment to operate within. Adoption and evolution of technology is occurring at a rapid pace and operating spaces are growing in interconnectedness an
Sep 1, 2024
-
Predictive Groundwater Solute-Transport Models and the Permitting Process for Mine Waste Facilities in Wisconsin, USA ù A Case Study From a Proposed Site Near CrandonBy D T. Feinstein, M B. Gotkowitz
In Wisconsin, state laws and regulations governing metallic mine permitting stipulate that protection of groundwater quality be assured indefinitely through all phases of the mining project, including
Jan 1, 2003
-
Ventilation Considerations for the New Level Mine Project Access TunnelsBy E Acu±a, B Prosser, R Alvarez, K Wallace
This paper describes the ventilation analyses performed for the access tunnels at the New Level Mine project (NLMP) at CodelcoÆs El Teniente operation outside of Rancagua, Chile. This new mine is anti
Jul 1, 2013
-
Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in MelbourneBy I Lamb
Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline
Mar 8, 2011
-
RISKGATE« - A Case Study in Application to Fires on Mobile PlantBy J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott
Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address
Sep 18, 2012
-
A Potential Use of Oxygen and Carbon Isotope Zonations of Wall Rocks in Prospecting Skarn Pb-Zn Deposits at Kamioka, Central JapanBy Matsuhisa Y, Sakurai W, Shimazaki H, Peiming H, Fukahori Y
Oxygen and carbon isotope mapping of hydrothermally altered wall rocks was applied to the blind ore prospecting of skam Pb-Zn deposits in the Kamioka mining district, central Japan, where the wall ro
Jan 1, 1995
-
Comparison of the Generation of Shear Wave with Different Simulation ApproachesBy M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu
The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha
Aug 24, 2015
-
Metso SmartTag - The Next Generation and BeyondBy K J. Riihioja, E Nozawa
SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f
Sep 26, 2011
-
Improving the Fluxed Pellets Performance by Hydrated Lime Instead of Bentonite as BinderBy J Pan
In this paper, the technology of producing fluxed pellets by using hydrated lime as binder instead of bentonite was carried out. The properties of the two types green balls (0.8 per cent bentonite and
Jul 11, 2011
-
The Hydrogen Reduction of Iron Oxides in Calcined BauxiteThe kinetics of the hydrogen reduction of iron oxides in granular calcined bauxite were studied at 550-1,050°C in a shallow bed reactor. The iron oxides behaved as a dispersion of particulate iro
Jan 1, 1972
-
Sources of Ore-Forming Materials of the Changpo Carbonate Replacement Tin Deposit in the Dachang Tin Field: Evidence from Oxygen, Carbon and Hydrogen IsotopesBy Gray J, Krouse HR, Changkakoti A, Kwak TAP
The Dachang tin field with more than one hundred million tonnes of ore at 1% tin and 3% Zn is one of the largest tin fields in the world. It comprises five carbonate replacement tin deposits, of which
Jan 1, 1990
-
Thermal Treatment of Angouran Lead and Zinc Flotation Plant Oxidised Tailings, IranBy S M. J Koleini, F Hedjazi
The purpose of this research was to study the calcination of lead-zinc flotation tailings from the Angouran lead and zinc flotation plant in Iran as a pre-concentration step prior to hydrometallurgica
Jan 1, 2004
-
Integration of real-time, online, individual cyclone measurement at Cerro Verde – challenges and lessons learnedBy A Castillo, K Wiese, L Panduro Robles
For decades, organisations worldwide have been working to overcome challenges associated with new technology adoption while keeping up with rapid growth, development, and globalisation. In minerals pr
Aug 24, 2022
-
The Primary Framework for the Mechanism of the Mine Reclamation Monitoring in ChinaBy Y Zhou, Y Liu, J-P Yang, P Wang, K Hu
"Large-scale mine reclamation has taken place recently in response to the implementation of mining regulations in China. Effective monitoring of the progress of reclaimed land is a critical procedure
Jul 10, 2012
-
Application of multi-sensor and AI-based core logging for a reduction of decision-making time within mineral exploration field projectsBy A Krishnan, C Garcia, I Luna-Berbesi
The discovery and exploration of deposits are progressively shifting to extremely remote regions and greater depths. As a result, exploration costs and the economic risk of a bad investment increase.
Sep 1, 2024
-
Downstream impacts of Grade Engineering and preconcentrationBy J Salaya, J Kwak, L Keeney, S Dehkhoda
In addition to volatile commodity prices influencing decision making, in recent years, social and environmental performance have become important decision drivers within the mining industry. There are
Nov 10, 2020
-
Redefining Competent Persons Criteria for Resource GeologistsBy J Coombes
There is much debate on the Competent Persons qualifying criteria for providing classified resource estimates for public reporting. The CRIRSCO family of codes including the JORC Code, SAMREC, PERC an
Aug 18, 2014
-
Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater QualityBy C Linklater, J Chapman, A Watson
Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl
Jun 28, 2016
-
Flow Characteristics of a Pinched SluiceBy Partridge A. C
Pinched Sluices, in a variety of guises, are used extensively for the separation of minerals according to density. In the authors' work a pilot-scale sluice has been constructed with provision
Jan 1, 1979
-
Functional safety and behavioural economics – understanding human error risk in autonomous operationsBy B Patterson, Y Lanwin
Over the last decade the adoption of autonomous technology has proven its potential to fundamentally alter the mining industry, offering significant improvements in safety and productivity. Automation
Apr 16, 2024