Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Understanding zinc-containing species in basic oxygen steelmaking dustBy B J. Monaghan, R J. Longbottom, D J. Pinson, S J. Chew
Recycling steel plant by-products is a critical issue for achieving both environmental and economic sustainability of integrated steel plants. A key steel plant by-product stream is dust from basic ox
Jun 19, 2024
-
Exploration and Mining on Aboriginal Land - Dispelling the MythsBy D Pearce
The 15-year long debate between the industry, Government and Aboriginal people about the rights and wrongs of Land Rights, the right of Aboriginal people to control development on their land and the
Jan 1, 1994
-
Liberation characteristics of comminuted ore types of the Per Geijer iron-oxide apatite depositsBy T Seifert, P Krolop, K Niiranen, S Gilbricht
The Per Geijer iron oxide apatite deposits (IOA) display significant potential mineral resources for Luossavaara-Kiirunavaara AB (publ), known as LKAB. LKAB continuously mines magnetite/hematite ores
Nov 8, 2021
-
Applicability of Categorical Simulation Methods for Assessment of Mine Plan RiskBy A Jewbali, R Perry, R Inglis, L Allen
"The use of conditional simulation to characterise mine plan uncertainty is increasing for the assessment of risk in mining projects. While the development of grade uncertainty profiles is relatively
Nov 24, 2014
-
Tailing Thickener Operability and Control Improvements at ProminentáHillBy J Lombardi, M Weidenbach
"OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township
Oct 29, 2012
-
Improved mining recovery with bulk ore sorting and MR technologyBy C Beal, S Singh
Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study
Nov 10, 2020
-
Understanding Geological Variability and Quantifying Resource Risk at the Kencana Underground Gold Mine, IndonesiaBy D Wardiman, R Benton, D Sims, T Carr, V Singh
The Kencana underground gold mine comprises two world-class epithermal vein deposits located in the North Maluku province of Indonesia on Halmahera Island. The K1 deposit has a recent extensive mining
Jan 1, 2009
-
Assessing corrosion of reinforcement on a large scaleBy N Power, R Hassell, E Jones
Wiluna Mining Corporation are progressively re-entering the old Wiluna underground mining complex. The existing underground was abandoned in 2013 by previous owners and left to flood with water levels
Nov 29, 2022
-
Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway ProjectBy W M. Tekano, T S. Coulter, N M. Hutt
The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell
Jan 1, 2003
-
Longwall Extraction at South Bulli CollieryThe Bellambi Coal Company Limited com menced longwall mining at South Bulli Colliery in 1965. At present it operates three long- wall units in two seams. Although results to date have been less succ
Jan 1, 1976
-
Non-Ideal Explosive Performance Prediction Using the CPEX ModelBy Minchinton A
CPeX is a non-ideal explosive performance prediction model. The model takes into account the rate of energy release, the extent of chemical reac- tion and the effect of confinement on energy release.
Jan 1, 1988
-
Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case StudyBy I Elias, E Moya, S Chaffer
This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage
Jul 13, 2015
-
Analysis of Longwall Shields and their Interaction with surrounding Strata in a Deep Coal MineBy Hendon G. W, Carr F, Jiang Y
A vast majority of the operating longwall sections use shield-type face supports to provide ground control in the United States. As a co-operative research program between the University of Alabama
Jan 1, 1992
-
Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity SettingBy D A. Williams, P J. Chapman
Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu
Jul 27, 2015
-
Sinking the New Broken Hill Consolidated Circular AirshaftThe New Broken Hill Consolidated Airshaft is the first major undertaking in the development of New Broken Hill Consolidated Ltd's. property, which adjoins that of The Zinc Corporation Ltd. on the
Jan 1, 1940
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
Solomon Iron Deposits – Continued Growth and DevelopmentBy C Simpson
In 2011 the forecasted world demand for iron ore continues to grow, and during this time Australia is looked upon as a reliable supplier of high quality ore. The expansion of the current Australian mi
Jul 11, 2011
-
The influence of roadway configurations on VCD and bulkhead designBy M Salu
Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme
Oct 12, 2022
-
Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel CaveBy J B Tucker, A T. McGrath
Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d
Mar 24, 2014
-
Availability and UtilisationExcavator output rates given in Makers' catalogues are sometimes based on favourable operating conditions. Mine operators and planners are more interested in the Effective Hourly Output in no
Jan 1, 1981