                     Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022 Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022By Gunjan R. Bhattarai, Kumar Bhattarai Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr Dec 1, 2022 
- 
                     Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022 Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin Dec 1, 2022 
- 
                     Characterizing Gassy Ground and Its Importance - NAT2022 Characterizing Gassy Ground and Its Importance - NAT2022By Barry R. Doyle, Emma C. Ross This paper presents a 20-year global account of tunneling in gassy ground demonstrating high probability of schedule delays, cost overruns, worker injuries and fatalities. Causes of these failures are Dec 1, 2022 
- 
                     Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022 Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022By Justin Kolster, Donald Benjamin, Kyle White Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re Dec 1, 2022 
- 
                     Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMs Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMsBy G. A. Rosario, G. Peach Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn Dec 1, 2022 
- 
                     Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022 Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022By Gino Vogt In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation Dec 1, 2022 
- 
                     Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022 Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022By Todd Kilduff, James Grillo, Shrey Arora In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine Dec 1, 2022 
- 
                     Construction Challenges of the Anderson Dam Tunnel Project - NAT2022 Construction Challenges of the Anderson Dam Tunnel Project - NAT2022By Ron Drake The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An Dec 1, 2022 
- 
                     Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022 Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022By Irwan Halim, Seung Han Kim This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c Dec 1, 2022 
- 
                     Underpinning of an Operational Subway Aided by Mined Galleries - NAT2022 Underpinning of an Operational Subway Aided by Mined Galleries - NAT2022By Thomas Schwind, Elmar Feigl, Gerald Skalla, Angelos Gakis Cedarvale station was constructed as part of the Eglinton Crosstown Light Rail Line, under the operational Yonge-University Line Subway box of Toronto Transit Commission (TTC). The station was constru Dec 1, 2022 
- 
                      
- 
                     Investigation Of Explosion Hazard In Longwall Coal Mines By Combining Cfd With A 1/40th-scale Physical Model Investigation Of Explosion Hazard In Longwall Coal Mines By Combining Cfd With A 1/40th-scale Physical ModelBy A. Juganda, F. WILSON, G.E. BOGIN, H. PINHEIRO, N. SANDOVAL, J.F. BRUNE To evaluate methane explosion hazards in underground longwall coal mines, researchers at the Colorado School of Mines developed a computational fluid dynamics (CFD) model along with a 1/40th-scale, op Dec 1, 2022 
- 
                     Analysis Of Steel Prop Supports Subjected To Vertical And Lateral Loading Analysis Of Steel Prop Supports Subjected To Vertical And Lateral LoadingBy Timothy Batchler, Khaled Mohamed Standing supports have been used in coal mines for decades to enhance roof support capability. Occasionally, standing supports are used to resist the lateral movement of spalled ribs. Researchers from Dec 1, 2022 
- 
                     Tunnel Load Rating—A Case Study: Port of Miami Tunnel - NAT2022 Tunnel Load Rating—A Case Study: Port of Miami Tunnel - NAT2022By Ali Kazmi, Wern-ping N. Chen A load rating procedure was performed to evaluate safe load capacity of the Port of Miami Tunnel (POMT), FDOT Tunnel No. 871071 SR 887. The rating procedure performed on a total of eleven stations ben Dec 1, 2022 
- 
                     Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022 Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022By John Newby, Edward Kennedy, Ulf Gwildis Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi Dec 1, 2022 
- 
                     Analysis of Near Field Vibration Monitoring in Construction Blasting - NAT2022 Analysis of Near Field Vibration Monitoring in Construction Blasting - NAT2022By Jim Buckley, Ryan Sibley, Scott G. Giltner, Thomas Pallua, Joe Schrank, Robert Cidlik Because of variation in rock type and site conditions, it is important to create site-specific prediction models for peak particle velocity (PPV) and understand instrumentation mounting locations to b Dec 1, 2022 
- 
                     Long Distance Tunnelling: Challenges and Trends - NAT2022 Long Distance Tunnelling: Challenges and Trends - NAT2022By Karin Bäppler Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct Dec 1, 2022 
- 
                     TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022 TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic Dec 1, 2022 
- 
                     Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022 Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t Dec 1, 2022 
- 
                     E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022 E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022By Peter Schmäh, Tobias Engel The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p Dec 1, 2022 