    Contractor uses innovative techniques on Seattle project

    "There is no fast way to add more than 6.4 km (4 miles) of track, most of it underground, to the Sound Transit Link Light Rail system in the Seattle, WA area. But increasingly busy traffic through a n

    Dec 1, 2016

  • SME
    Risk analysis for evaluation of mine impounded water

    By Michael Gobla

    "Since 1994 the Bureau of Reclamation (BOR) has used risk analysis to evaluate dams. Risk considers both the likelihood of failure and the expected consequences should failure occur. Risk analysis rel

    Dec 1, 2016

  • AUSIMM
    A Modified Software Tool for Mine Waste Rock Dump Planning

    By Z Fu, E Topal, O Erten

    "Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o

    Nov 15, 2016

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage Operations

    By R Thompson, D Tulloch

    "Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and

    Nov 15, 2016

  • AUSIMM
    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    Reducing Bench Turnover Time and Improving Shovel Digability

    By D Kavanagh, C Michaud

    "A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im

    Nov 15, 2016

  • AUSIMM
    Autonomous Haulage Systems – the Business Case

    By R Price

    "Technology has the potential to revolutionise industries, work functions or businesses. One such technology in the mining industry is the deployment of automation in a modern autonomous haulage syste

    Nov 15, 2016

  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    Getting the Most out of Technology to Drive Mine Productivity Improvements

    By K Sommerville, J Parkinson

    "Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c

    Nov 15, 2016

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin Coalmine

    By A K. Ghosh

    "Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an

    Nov 15, 2016

  • AUSIMM
    Innovative Approach to Open Pit Edge Protection

    By N Redwood, N Fowkes, A Bassom, S Durkin

    "It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat

    Nov 15, 2016

  • AUSIMM
    A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation

    By B Reid

    "Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This

    Nov 15, 2016

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016