    Alternative Delivery and Trenchless Methods Used to Install 60,000 LF of Pipe on the Bay Park Force Main Project - NAT2024

    By Jeff LeBlanc, George Gutierrez, Carl Pitzer

    The Bay Park Conveyance Project was one of the largest microtunneling and rehab projects in the United States at the time of completion. The completed project conveys treated water from the South Shor

    Jun 23, 2024

  • SME
    TBM Rescue Shaft, Tunnel, and Relaunch in Karst Conditions - NAT2024

    By Dan Swidrak, Bill Zietlow

    Halfway through a 17,770-ft long stormwater tunnel, an 11-ft diameter TBM encountered a karst void below the Mississippi River in Missouri, resulting in significant inflow. It was decided that the TB

    Jun 23, 2024

  • SME
    Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024

    By Jeremy Cawley, Horry Parker Jr., Clint Wilson

    The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam

    Jun 23, 2024

  • SME
    Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024

    By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote

    On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun

    Jun 23, 2024

  • SME
    Threading the Needle: Design and Construction of the Parallel Thimble Shoal Tunnel - NAT2024

    By Joan Carles Casado Ortega, Mitchell Gerdtau, Sandeep Pyakurel, Eric Crocker, Frank Perrone

    The Parallel Thimble Shoal Tunnel (PTST) project is a part of the Chesapeake Bay Bridge- Tunnel (CBBT) complex. The project involves the construction of a two-lane bored tunnel under the Thimble Shoal

    Jun 23, 2024

  • SME
    Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024

    By Andrew Chegwidden, Tara Wilk

    Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m

    Jun 23, 2024

  • SME
    Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024

    By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield

    The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the

    Jun 23, 2024

  • SME
    Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

    By Daniel Willis, Ryan O’Connell

    An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w

    Jun 23, 2024

  • SME
    Chimney Hollow Reservoir Project Inlet/Outlet Tunnel Excavation and Valve Chamber Construction - NAT2024

    By Kyle Kittle, Kyle Knaeble, Albert Ruiz, Gregory Raines, Ryan Gewargis

    The Chimney Hollow Reservoir Project (CHRP) is located southwest of Loveland, Colorado. CHRP is a component of the Windy Gap Firming Project, operated by the Municipal Subdistrict of the Northern Colo

    Jun 23, 2024

  • SME
    Tunnel Belt Applications for Long Distance Tunnels with Curvy Alignments - NAT2024

    By Marco Sonnenschein

    Belt conveyors for tunnelling are industry standard and key to high performance of TBM drives. Conveyors reduce traffic in the tunnel and increase safety in the tunnelling process. This paper will ill

    Jun 23, 2024

  • SME
    Secant Pile Wall as Support of Excavation and Final Lining of a Major Underground Metro Station - NAT2024

    By A. Bhargava, V. Nasri

    Traditionally, secant piles have been utilized to provide temporary support during excavation for shafts and cut-and-cover tunnels. As an alternative, the secant piles can be included into the permane

    Jun 23, 2024

  • SME
    Ground Freezing with Liquid Nitrogen for TBM Cutterhead Maintenance - NAT2024

    By Joseph Sopko, Xavier Lacourse-Dontigny

    For the REM (Réseau Express Métropolitain) project, a 2500 m tunnel was built using a tunnel boring machine (TBM) under the Montreal Pierre Elliott Trudeau Airport (ADM). Although the geology under th

    Jun 23, 2024

  • SME
    Shaft Design and Construction at the Hampton Roads Bridge-Tunnel - NAT2024

    By Richard Giffen, Martha Gross, Luca Pellegrini, Pa Ousman Njie

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in Virginia includes parallel 1.5- mile (2.4 km) tunnels constructed using a tunnel boring machine (TBM). The TBM launching and receiving shaft

    Jun 23, 2024

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    Parallel Thimble Shoal Tunnel: Challenging TBM Assembly and Launching in an Existing Island - NAT2024

    By Ruben Piqueras, Juan Luis Magro, Jorge Vázquez, Santiago Martínez, Xavier Manjarín

    The Parallel Thimble Shoal Tunnel project involves the construction of a bored tunnel under Thimble Shoal Channel in Chesapeake Bay (VA), between two artificial islands and parallel to the existing tu

    Jun 23, 2024

  • SME
    Unique Aspects of Remote High Altitude Water Tunnel Repair - NAT2024

    By David Jurich, Ed Perko, Jacob Prezkuta

    Numerous Colorado mountain tunnels that date to the late 1800s convey water to the farming and urban communities of the eastern Front Range. Repairs to these remote facilities, often located in public

    Jun 23, 2024

  • SME
    P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024

    By Jerry Luttman, Mark Dubay, Anvesha Dogra, Elizabeth Dwyre, Wei Hu

    The I-75 Modernization Project (Segment 3) just north of Detroit, MI is being delivered as a Design-Build-Finance-Maintain (DBFM), which is a Public Private Partnership (P3). The project includes desi

    Jun 23, 2024

  • SME
    LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024

    By Alix Thierart, Yann Rouillard, Bernard Catalano

    Bessac's presence in Singapore started in 2014 with the construction of the Thomson metro line, which includes 18 miles of twin-bore tunnels and 22 stations split into 17 construction packages. Bessac

    Jun 23, 2024

  • SME
    Slurry Shield Cutterhead Torque Characterization Using AI Machine Learning and Mechanics-Based Modeling - NAT2024

    By Hongjie Yu, Rakshith Shetty, Claudio Cimiotti, Nick Karlin, Mike Mooney, Vitaly Proshchenko, Matt Kendall

    This paper documents an effort to explain cutterhead torque behavior observed during slurry pressure balance TBM tunneling through soft ground on the Los Angeles Clearwater project. AI machine learnin

    Jun 23, 2024

  • SME
    Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024

    By Irwan Halim, Stephane Polycarpe, Brian Hann

    The Narragansett Bay Commission Phase III CSO Program includes construction of the 11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview of the Desi

    Jun 23, 2024