Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Implementation and Evaluation of Roof Bolting in MICARE Mine II

    By Gustavo Herrera Rico

    As part of a general effort to increase safety, efficiency, and profitability of its mining operations, MICARE personnel with the support of NorWest Mine Services, Inc. determined that the key to impr

    Jan 1, 1997

  • SME-ICGCM
    Improved Design Of Coal Pillars For U.S. Mining Conditions

    By Z. T. Bieniawski

    This paper presents the results of a survey of room and pillar dimensions and design practice in U.S. coal mines aimed at improving the design procedures in room and pillar mining. A review is given o

    Jan 1, 1981

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    The Influence Of Stream Valleys On Coal Mine Ground Control

    By John L. Hill

    Over 50 mines of the Appalachian and Illinois Basins are presently experiencing poor ground conditions believed to be caused by overlying stream valleys. The Bureau of Mines is conducting research int

    Jan 1, 1988

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Selection of Tunnel Support System by Using Multi Criteria Decision Making Tools

    By Kazem Orace, Navid Hosseini, Mehran Gholinejad

    "Selection of the optimum support system for underground openings such as tunnels is a complex process. In this paper a new approach, based on a combination of the Analytical Hierarchy Process (AHP) t

    Jan 1, 2010

  • SME-ICGCM
    Characterization Of Structural Integrity And Stress State Via Seismic Methods: A Case Study

    By Erik C. Westman

    The objective of this Bureau of Mines study is to determine the structural integrity and stress state of coal structure using seismic techniques. Bureau personnel conducted seismic transmission and re

    Jan 1, 1993

  • SME-ICGCM
    Reformation Of The Hydraulic Stowing Mining Method (81b9f573-b6ec-447f-bbcd-728c29bd41c4)

    By Liang Yinhuai

    The hydraulic-stowing mining method is most effective for mining thick coal seams. It is superior to the sliced cover-caving and artificial mining method and the fully mechanized sublevel-caving minin

    Jan 1, 1992

  • SME-ICGCM
    Practical Stress Modeling for Mine Planning

    By Keith Heasley

    As part of the initial investigation and validation of a new boundary-clement formulation for stress modeling in coal mines. the underground stresses and displacements at two multiple-seam coal mines

    Jan 1, 1998

  • SME-ICGCM
    Interaction Between Roof And Support On Longwall Faces With Particular Reference To Support Resistance

    The objective of extensive underground experimentation on three longwall coal faces was to improve the stability of mechanised longwall faces through investigation of the relations between support res

    Jan 1, 1984

  • SME-ICGCM
    Effect Of Face Advance Rates On The Characteristics Of Subsidence Processes Associated With U.S. And German Longwall Mining Operations

    By Yi Luo

    Regulating the face advance rate in longwall mining operation can be an effective means to reduce the disturbance potential to surface structures associated with a longwall subsidence process. However

    Jan 1, 2001

  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Operational Experience With FLEXIBOLT Systems In Australian Coal Mines

    Since the initial development and trials of FLEXIBOLT flexible roof bolts, further comparative testing and product development has been completed as part of the changeover to this roof support system

    Jan 1, 1994

  • SME-ICGCM
    Comparative Analysis Of Longwall Gateroad Designs In Four Deep, Bump-Prone Western U.S. Coal Mines

    By Matthew J. DeMarco

    Research personnel at the U.S. Bureau of Mines have conducted longwall gate stability studies at four western U.S. mines attempting to employ yield pillars for improved ground conditions. Located in t

    Jan 1, 1993

  • SME-ICGCM
    Time-dependent Behavior of Immediate Weak Floor Strata from an Illinois Coal Mines

    By Y. P. Chugh

    The paper discusses laboratory and field studies to analyze time-dependent deformation behavior of immediate weak floor strata in an Illinois coal mine. In the laboratory, core samples of the immediat

    Jan 1, 1987

  • SME-ICGCM
    Mining Subsidence Of An Urban Area In Ipswich, Queensland (3581bf43-8b41-4e5e-a797-55082bdbc493)

    By D. J. Maconochie

    This paper describes the investigations and results of monitoring of deformations of houses located within the area of influence of a pillar collapse over the Westfalen No. 3 coal mine near Ipswich, Q

    Jan 1, 1992

  • SME-ICGCM
    Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)

    By Deno Pappas

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr

    Jan 1, 2002

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002

  • SME-ICGCM
    Investigations Of Underground Coal Mine Bursts

    By K. Haramy

    Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;

    Jan 1, 1984

  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988