Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Slurry Wall Construction in Coarse-Grained Soils - NAT2022By J. Andrew McGlenn, Greg Emslie, Murray Gant
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon
Dec 1, 2022
-
Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
Phosphate And Florida's EnvironmentBy R. S. Hearon
The image of the open-pit miner in the eyes or the Environmentalist has never been very outstanding. The phosphate industry, whose history in Florida reaches back to the late 1800's, can-not be c
Jan 1, 1978
-
Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024By Irwan Halim, Stephane Polycarpe, Brian Hann
The Narragansett Bay Commission Phase III CSO Program includes construction of the 11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview of the Desi
Jun 23, 2024
-
Economic Benefits Gained By Rock Mechanics Examples From Four Case StudiesBy J. F. T. Agapito
Significant economic benefits can result when rock mechanics is applied within a practical framework and integrated within the other engineering functions of the mine organization. This requires manag
Jan 1, 1990
-
Kennecott Utah Copper Smelter Modernization (127c52b5-4f83-464f-bcae-2f259e9fd980)By C. J. Newman
Prior to 1995, the smelting process at the Kennecott Utah Copper Corporation (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. In the consideration of expansion opportunities,
Jan 1, 1998
-
Investigations Into Methane Accumulation In Coal Storage SilosBy R. J. Kolada
The ventilation systems of coal storage silos are normally capable of rapidly dispersing any accumulations of methane in the atmosphere above the coal pile surface. However, the results of an investig
Jan 1, 1985
-
Fluorspar Deposits Near The Union Pacific RailroadBy Richard Chojnacki
The western united States is not usually noted for the production of fluorspar; however, many significant fluorspar districts do occur in the Rocky Mountain region and constitute a resource of sizable
Jan 1, 1971
-
Accuracy Of Feasibility Study Evaluations Would Improve AccountabilityBy Richard L. Bullock
Believe it or not, mine evaluation and feasibility studies are as old as the industry itself. In the first recorded writing on mining by Agricola (1556), he gave several clues as what to look for in e
Jan 1, 2011
-
Application Of Longwall Mining To Isolate Nuclear Waste Storage SitesBy J. S. Chen
DOE recently funded 21 projects under the solicitation by its Environmental Restoration and Waste Management Division. This project is combining the expertise of an interdisciplinary team of researche
Jan 1, 1994
-
Challenges In Developing Western Canadian CoalsBy John E. Good
A new coal boom is under way in western Canada. As recently as the mid-1960's, the coal industry in western Canada was considered stagnant and, by some people, dying. But Japan's growing nee
Jan 1, 1972
-
Processing Molybdenite Concentrate By An Acid Bake-Leach-Flotation MethodBy H. Rush Spedden
A process has been developed and piloted to reject copper, lead, iron, phosphorus, bismuth, antimony, elemental sulfur, and insol from molybdenite concentrate without decomposing the contained molybde
Jan 1, 1971
-
Longwall predriven recovery room support design using analytical solutions for an elliptical crack in an infinite plate - SME Transactions 2012By B. Qiu, Y. Luo
The design of the predriven recovery room is not an easy task, because the stress distribution in the barrier pillar, standing supports, fender pillar and the immediate roof is changing as the longwal
Jan 1, 2012
-
Rockburst in South African Deep Level Gold Mining: What Do We Know? - RASIM 2022By Lourens Scheepers
Mining induced seismicity and rockbursts have been part of the deep level gold mining industry in South Africa for many years. One could be forgiven for thinking that we should know everything there i
Apr 26, 2022
-
Planning for the Drumanard Highway Tunnels, KentuckyBy Lawrence Williamson, Randall J. Essex, David P. Field
As part of a $2.2 Billion bridge project that will link Indiana and Kentucky, an interchange project northeast of Louisville will require the mining of a 6-lane tunnel system about 2,000 ft long in or
Jan 1, 2005
-
Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMSBy Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski
The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13
Jan 1, 2007
-
Evaluation of Roof Bolter Canopy Air Curtain Effects on Airflow and Dust Dispersion in an Entry Using Blowing Curtain Ventilation Mining, Metallurgy and Exploration (fbebd4c9-e3f3-48b5-bb14-baf48bbb456f)By M. R. Shahan, W. R. Reed, J. P. Rider
Roof bolter operators may be exposed to high respirable dust concentrations on continuous miner sections with blowing face ventilation when bolting is performed downwind of the continuous miner. One s
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Though Not a Record Year, the Coal Industry Performs Well in 1983By L. Westerstrom
Supply and Demand After a dismal first half, the industry saw a marked improvement in its markets during the final six months of 1983. Domestic consumption was 17.6% higher in the second half of th
Jan 5, 1984