Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-10(2)-79 Noise Control Modification Manual - Jeffrey 100-L Auger Miner
By Tom Retka
This three volume final report summarizes the activities and conclusions of this contract. The objective of the contract was to develop noise control modifications on a retrofit basis, for auger miner
Jan 1, 1978
-
MLA 54-82 - Mineral Resource Potential Of The Rubicon Rare II Area (No. 5026), El Dorado And Placer Counties, California ? Summary
By Eric E. Cather
In 1981 the U.S. Bureau of Mines and U.S. Geological Survey conducted a mineral survey of the 5,100 acre (2,065 ha) Rubicon RARE II area (No. 5026) in the El Dorado National Forest (fig. 1). Work by
Jan 1, 1982
-
RI 7669 Analysis Of Fracture Orientations For Input To Structural Models Of Discontinuous Rock
By M. A. Mahtab
This report presents a new procedure for analyzing the orientations of rock fractures in an engineering site. This procedure, coded in a computer program, identifies clusters or groupings among the fr
Jan 1, 1972
-
RI 6150 Fuel-Oil Injection In An Experimental Blast Furnace
By P. L. Woolf
Oil was successfully injected into the tuyeres of the Bureau of Mines experimental blast furnace. Determinations were made for the minimum oil addition necessary to permit the maximum available blast
Jan 1, 1963
-
RI 8290 Copper and Silver Recovery From a Sulfide Concentrate by Ferrous Chloride-Oxygen Leaching
By B. J. Scheiner
A ferrous chloride-oxygen leaching system was investigated by the Federal Bureau of Mines to determine its effectiveness for recovering copper and silver from a tetrahedrite concentrate that had been
Jan 1, 1978
-
RI 8701 A Case History of a Major Rock Burst
By Fred Leighton
The Bureau of Mines monitored a rock-burst-prone pillar in a metallic ore vein, up to and through failure, to measure its reactions to increasing loads, as it was mined. Three parameters were monitore
Jan 1, 1982
-
RI 7629 Electrolytic Preparation Of Beryllium-Copper Alloys
By D. E. Kirby
In the preparation of beryllium-copper alloys by fused-salt electrolysis, beryllium was electrowon from beryllium oxide dissolved in fluoride electrolytes and deposited on copper cathodes. At 880° to
Jan 1, 1972
-
RI 7308 Preparation Of Rare-Earth And Yttrium Metals By Electrodeposition And Vacuum Distillation Of Alloys
By E. Morrice
Gadolinium, dysprosium, and yttrium are difficult to electrowin as high-purity liquid metals because of their high melting points (>1,300° C). Samarium metal is difficult to prepare directly by electr
Jan 1, 1969
-
RI 7969 Methane in the Pittsburgh Coalbed, Washington County, Pa.
By Ann G. Kim
Methane in coal constitutes a serious hazard during mining. Draining the methane from large blocks of coal in advance of mining is an effective method of improving the safety and efficiency of coal mi
Jan 1, 1974
-
RI 8286 - Foam Stimulation To Enhance Production From Degasification Wells In The Pittsburgh Coalbed
By Peter F. Steidl
Seven degasification wells have been completed in the Pittsburgh coalbed at the new Emerald mine near Waynesburg, Pa. Funding was provided by the Bureau of Mines to perform stimulation treatments on f
Jan 1, 1978
-
OFR-92-80 Flammability Evaluation Of Noise Control Products For Use In Underground Coal Mines
By R. S. Norman
The objective of this program was to select approximately 100 acoustic materials for flammability evaluation. Noise control programs have been initiated on several types of mining equipment and vehicl
Jan 1, 1979
-
RI 8286 Foam Stimulation To Enhance Production From Degasification Wells in the Pittsburgh Coalbed (496337e6-c62a-4837-bf40-2e8fc9f8d2fb)
By Peter F. Steidl
Seven degasification wells have been completed in the Pittsburgh coalbed at the new Emerald mine near Waynesburg, Pa. Funding was provided by the Bureau of Mines to perform stimulation treatments on f
Jan 1, 1978
-
An Underground Electromagnetic Sounder Experiment
By Lambert Dolphin, George Oetzel, Robert Bollen
An electromagnetic sounder developed for an archaeological application in Egypt has been successfully tested in a California dolomite mine. Chambers in the mine 100 to 130 feet from the surface gave i
Jan 1, 1973
-
RI 3680 Trends in the Use of Energy in the Western States with Particular Reference to Coal
By V. F. Parry
The amount of energy required to support a unit volume of industrial production appears to depend on the volume of industrial production, effi- ciency of utilization of fuel, the form of energy use
Jan 1, 1943
-
OFR-10B-86 Compact Loader/Trammer For Underground Metal And Nonmetal Mines - Operation And Maintenance Manual
By Tom Tallone
In the majority of metal and nonmetal mining operations, narrow vein deposits are being mined with slusher hoists. Thin; method of mucking is costly, due in part to its inherent labor intense operatio
Jan 1, 1985
-
RI 5966 Fluorescent X-Ray Spectrography: Determination Of Trace Elements ? Introduction And Summary
By William J. Campbell
The purpose of this investigation was to extend the analytical services which are required for Bureau of Mines programs in developing and evaluating high-purity materials. Determination of trace eleme
Jan 1, 1962
-
RI 8477 Silver Recovery From Aircraft Scrap
By D. Harry Chambers
The Bureau of Mines, through a memorandum of agreement with the Department of Defense, conducted research to recover silver from aircraft scrap. Silver was recovered by an electrolytic method from sta
Jan 1, 1980
-
RI 8046 Electrophoretic Mobilities and Cation Exchange Capacities of Florida Phosphate Slimes
By Alexander May
The Bureau of Mines, in cooperation with the Florida phosphate mining industry, investigated the dewatering of waste phosphatic slimes. Part of this investigation was to determine the electrophoretic
Jan 1, 1975
-
OFR-10(3)-79 Noise Control Modification Manual - Jeffrey 94-L Bridge Conveyor
By Tom Retka
This three volume final report summarizes the activities and conclusions of this contract. The objective of the contract was to develop noise control modifications on a retrofit basis, for auger miner
Jan 1, 1978
-
OFR-33-74 Truck Fire Protection System Validation - Final Report-Executive Summary - Introduction And Summary - Introduction
Development of automatic fire protection systems for large, mobile mine haulage equipment was initiated under Department of Interior's Bureau of Mines-FMC Corp. contract H0122053, "Improved Senso
Jan 1, 1974