Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Analysis Method into True Detonator Delay Element Discrepancies

    By Joseph Daly

    An investigation into inaccurate scatter of pyrotechnic detonators led to the innovation of utilising existing (every day) equipment in a manner to accurately determine the true scatter of detonators.

    Jan 1, 2014

  • ISEE
    Bench Blasting Design Based on Analysis of Blast-Induced Ground Vibrations at an Open Pit Coal Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Serdar Celik, Yucel Karakus

    This paper presents bench blasting designs based on results of vibrations analysis on test shots organized in an open pit coal mine located near to Soma district at Manisa province in Turkey. There ar

    Jan 1, 2012

  • ISEE
    Explosive Detection Recovery and Disposal

    By Robert McClure

    The detection, recovery and disposal of commercial explosives and explosive waste has always carried a level of risk and requires specialized equipment and technical expertise. Improperly stored, disc

    Jan 1, 2015

  • ISEE
    Underground Blast Doors: Measured Pressure Drop and Human Exposure Safety

    By Matthew Hirsch, Jason Connot, Nathan Rouse, Srivatsan Jayaraman, Akash Adhikari, Brent Meins, Purushotham Tukkaraja

    The Deep Underground Neutrino Experiment (DUNE) is a world-class particle physics research project currently being constructed 4,850 ft, 1,478 m underground at the Sanford Underground Research Facilit

    Feb 6, 2023

  • ISEE
    Improved Drilling Accuracy Results in Reduced Ore Dilution at Evolution, Cracow

    By Phil Jones, Ben Johnson

    During a period of six months in FY2018, a series of trials were conducted to compare drilling accuracy using two different methodologies and the subsequent impact this had on ore dilution. Testing wa

    Jan 1, 2019

  • ISEE
    The Advantages of Recycled Oil in Blasting, a Refreshing Approach

    By Joseph Daly

    This is the detailed evaluation of the establishment and implementation of an ‘oil recycle plant’ located on site at Boggabri Mine NSW, (Australia); its production, its use and its value. Also discuss

    Jan 1, 2014

  • ISEE
    Journal: 100 Years / Mining & Scientific Press San Francisco March 18, 1905

    By Robert Hopler

    This article, advocating having employees whose specific job would be to fire blasts in underground coal mines in llinois, was written 5 years prior to the establishment of the U.S. Bureau of Mines,

    Jan 1, 2006

  • ISEE
    Analysis of Environmental Effects Induced by Cautious Blasting During the Excavation of Istanbul Subway Construction

    By Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Ahmet Varol, Ertugrul Kaya, Turgay Ozat

    This paper presents analysis of environmental effects induced by cautious blasting during the construction of the Istanbul Subway 4 Levent - Ayazaga Darulsafaka Metro Tunnel Project carried out by the

    Jan 1, 2011

  • ISEE
    Influence of Burden on Intensity of Ground Vibrations and Air Overpressure in Opencast Bench Blasting

    By AK Chakraborty, AK Raina

    Burden of drill hole is third most sensitive parameter effecting the ground vibration in blasting apart from maximum charge per delay and distance. Various types of burdens can be seen in practical be

    Jan 1, 2004

  • ISEE
    Using the Superposition of Seed Waveforms to Predict Seismic Effect by Blasting

    By Yang Jun, Qu Mei, Zheng Yao-wu, Chi Li-yuan

    Due to the necessity of the prediction of blasting seismic effect around strip mine bench blasting area, the paper provides a method to predict the blasting seismic effect by employing the superpositi

    Jan 1, 2015

  • ISEE
    Acceleration and Deformation of an Explosively-Driven Metal Plate

    By Steven A. Mathe, Seokbin Lim

    Current analytical models can accurately predict the final velocity of explosively driven flyers and can somewhat predict the acceleration profile, but do little to address the deformation of the flye

    Jan 1, 2015

  • ISEE
    Strategic Public Relations for Underground Conservatory at Tennessee Governor’s Residence

    By Jake Hutchison, Wade Hutchison

    The opposition to the project has risen as a result of some political pressures and from public perceptions about the project’s necessity and its impact on the neighborhood. As a result of this contro

    Jan 1, 2009

  • ISEE
    Journal: Safety Talk / Value of a Good Hearing Loss Prevention Program

    When a company has an effective hearing loss prevention program, everyone wins-the employers, the employees, and the safety and health professionals who implement the program. This guidebook is not ab

    Jan 1, 2006

  • ISEE
    Effects of Electronic Detonators in Underground Tunneling Applications

    By Charles Zdazinsky

    Over-break is undesirable in underground civil construction because it excessively damages rock along the perimeter of the tunnel, which directly influences the cycle times of advancement. A quicker c

    Jan 1, 2015

  • ISEE
    Detonation Line Standards and Specifications-Someday?

    By James A. McGrath

    "The predominant key word associated with all commercial blasting methods is “safety”. Safetyshould take precedent over all other aspects of the entire explosives industry which on a wholehas had an e

    Jan 1, 1999

  • ISEE
    Underwater Blasting: A Summary

    By Joshua Taylor Drake

    This report answers specific questions concerning underwater blasting considerations, and blasting safety. The blasting considerations discussed consist of basic blasting principles, and new variables

    Jan 1, 2015

  • ISEE
    Mining and Fragmentation: Proposal for a More Efficient Mine Management

    By Ivan Carrasco, Benjamin Cebrian

    Mining companies have traditionally organized their structure around a scheme easy to manage: Mining Department and Mill Department. In a challenging landscape for mining, with decreasing grades, incr

    Jan 1, 2014

  • ISEE
    Community Response To Airblast And Vibration From Surface Charges

    By L. Wilson, M. Kotzel, T. Pienaar

    An empirical equation is presented for the maximum airblast from unconfined charges. This has been tested at a number of sites and with charges ranging from 0.1kg to 311kg. The equation is developed t

    Jan 1, 2011

  • ISEE
    Journal: Safety Talk / Determining The REAL Cost of An Accident

    By Mark Abernathy

    When most people think of a motor vehicle accident, the direct costs resulting from that accident, such as vehicle repair or towing charges, are generally easy to quantify. However, the indirect costs

    Jan 1, 2006

  • ISEE
    Reducing Overall Toxic Fumes at Fixed Work Output, by Formulating

    By Michael Wieland

    For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t

    Jan 1, 2006