    Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel Approach

    By Aly M. Mohammad

    The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con

    Jan 1, 2009

  • DFI
    Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:

    By Robert W. Bergwall

    The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T

    Jan 1, 1997

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • DFI
    Deep Soil Stabilization Using Lime Cement Columns - Synopsis:

    By Melvin I. Esrig

    Lime Cement column stabilization of soft clay and sand in Salt Lake City, Utah and in San Francisco California is described and discussed. Stabilization permitted the construction, in a single stage,

    Jan 1, 2000

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • DFI
    Unusual Solutions To Difficult Earth Retention And Underpinning Projects ? Summary

    By Larry Rayburn

    Design of cost effective engineered solutions to complex problems requires the team efforts of the owner, the designer and the specialty construction contractor. The basic ingredients of success requi

    Jan 1, 1991

  • DFI
    Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? Synopsis

    By D. Goossens

    Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the

    Jan 1, 1996

  • DFI
    Recent Evolutions In Deep Foundation Technologies

    By Maurice Bottiau

    It is a quite challenging objective to aim at covering in one paper the most recent evolution in piling and deep foundations technologies. This report has to be understood within the limits of the ses

    Jan 1, 2006

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • DFI
    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • DFI
    Challenge From Foundation Engineering To China ? Synopsis

    By R. L. Xu

    In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output

    Jan 1, 2010

  • DFI
    Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing Bridge

    By Roy M. Schnabel

    The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in

    Jan 1, 1993

  • DFI
    Use Of Nondestructive Testing To Evaluate Defects In Drilled Shafts: Status Of FHWA Research - Background

    By Clyde Baker

    Drilled shafts for many situations offer an economical alternative to driven piles. The Federal Highway Administration (FHWA) has spent considerable time and money in research and developing design an

    Jan 1, 1989

  • DFI
    Spin-Fin Pile Technology

    By Dennis Nottingham

    Spin-fin pipe piles can develop large loads in tension, thus have evolved as a foundation product of great potential. Currently, over 500 spin-fin piles have been used successfully in dolphins, docks,

    Jan 1, 1990

  • DFI
    The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;

    By Robert A. Field

    Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t

    Jan 1, 1997

  • DFI
    Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction

    By A. Paviani

    The subject of this session is "Equipment Installa­tion, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions

    Jan 1, 1994

  • DFI
    Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium Deposits

    By Shaw-Shong Liew

    This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa

    Jan 1, 2002

  • DFI
    The Quality Control Of Pile Foundations Of Tall Buildings In Shenzhen

    By Li Keqiang

    Among the pile foundations of the 156 tall buildings over 18 storeys in Shenzhen, 86. 5% of them are constructed by slurry drilled piles, bored piles and excavated piles (hand-dug caissons). Based on

    Jan 1, 1991