Ladies And Gentlemen,
By George Koenig
I have been granted the outstanding privilege... and pleasure to introduce you this evening to the Grand-Duchy of Luxembourg and to tell you in a few words how this country came into existence, how it
Jan 1, 1987
-
Advanced Continuous Surface Wave Testing (Acsw): Geologic And Geotechnical Site Characterization For The 21St Century
By David Wilshaw
Continuous Surface Wave (CSW) testing has been the “next big thing” in ground characterization for the last 25 years. The technique uses surface geophones to measure the speed at which Rayleigh waves
Oct 1, 2022
-
Load and Resistance Factor Design – Past, Present and Future
By Silas C. Nichols, Jennifer E. Nicks
"Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab
Jan 1, 2015
-
Slope Stabilization of Mill Creek Landslide Using Steel H-Piles
By Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
Effects of Stratigraphy on the Response of Energy Piles
By Arash Saeidi-Rashk-Olia, Dunja Peric
Energy piles are gaining increased popularity due to a growing demand for clean energy. To further advance the understanding of soil-structure interaction in energy piles, recently-derived analytical
Sep 8, 2021
-
Making Foundation Design Courses More Engaging and Effective for Students
By Evangelia Ieronymaki
Civil engineering education relies on traditional methods of teaching, comprising mostly of deductive instruction by presenting the theory, followed by applications. This paper presents an alternative
Jan 1, 2019
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction
By David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
A Case Study on the Effects of Using Surcharge Fill as a Complement to Ground Improvement with Dry Deep Mixing
By Stefan Larsson, Sebastian Adevik, Sadek Baker, Razvan Ignat
"Abstract Uncertain strength, deformation and flow properties in dry deep mixing columns often lead to conservative choices concerning design values where the design is regularly complemented with a s
Jan 1, 2014
-
Non-Destructive Geophysical Evaluation Of Deep-Mixed Soil: A Computer Modeling Study
By David A. Staab
Numerical modeling was used to investigate the feasibility of using two geophysical imaging techniques, cross-borehole ground penetrating radar (XBGPR) tomography and electrical resistivity (ER) tomog
Jan 1, 2004
-
New Orleans Levee Improvement Project: An OPA Contender
By Filippo Leoni, Wesley Schmutzler
"The LPV-111 East Back Levee Improvement Project lies along the Gulf Intracoastal Waterway (GIWW) in Orleans Parish of New Orleans, La., and is an essential component of the New Orleans Hurricane Prot
Jan 1, 2013
-
Rock Socketed Drilled Shafts for the Goethals Bridge Replacement
By John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of
Jan 1, 2016
-
Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture
By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
May 11, 2007
-
How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies
By Alok Bhowmick
The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ
Nov 1, 2022
-
Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall Panels
There are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration
Jan 1, 2005
-
Design, Construction and Monitoring of a Secant Pile Compression Ring
By Jason Weck, Alper Turan, Ali Chehadeh
"Rapid expansion of urban areas dictates the need to expand/rehabilitate the existing buried infrastructure at the same rate. The technical challenges such as variable soil and rock profiles, high gro
Jan 1, 2014
-
Rock Socket Capacity Certification Using the Point Load Index Test
By Burt G. Look, David W. Lacey
"Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde
Jan 1, 1900
-
Behavior of Battered Piles under Lateral Loads in Sandy Soils
By Jogeshwar P. Singh, Ahmed AlaaEldin, Mohamed Ashour
The presented methodology allows the determination of the response of laterally loaded battered long piles in sandy soils based on the soil-pile interaction. The Strain Wedge (SW) model which was orig
Jan 1, 2018
-
Horizontal Resistance Behavior Of Pile With Wings In Sand
By Wen Songlin
This paper presents an experimental program to investigate the behavior of a pile with wings under horizontal loads in sand at laboratory. The work focused on evaluating the lateral resistance behavio
Jan 1, 2007
-
Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction
By E. E. De Beer
This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform
Jan 1, 1987
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits
By Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc