Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station
By Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019
-
Trump International Is OPA Winner
"Standing 92 stories high and just over 1,362 ft tall, Chicago’s Trump International Hotel and Tower is perfectly positioned at the center of one of the world’s most impressive skylines.The Tower serv
Jan 1, 2009
-
The Road to Innovation in Geotechnical Construction (f2290583-6329-4b39-a4c9-b746aba3a1f4)
By Peter J. Nicholson
"IntroductionDuring my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concre
Jan 1, 2017
-
The Road To Innovation In Geotechnical Construction
By Peter J. Nicholson
During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology
By Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project
By David White
"When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau
Jan 1, 2017
-
A Tall Slender Tower Rises On Secant Piles and Drilled Shafts
By Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis
By N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Value Engineering of Reinforcement used in Large Diameter Drilled Shafts
By Shahid Islam, Lucian Bogdan
Deep and large diameter drilled shafts use mostly bundles of Grade 60 (415 MPa) reinforcing bars as longitudinal reinforcement with rebar splices to make it longer. Lower Grade steel requires large nu
Jan 1, 2018
-
Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions
By Lori A. Simpson
Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese
Jan 1, 2006
-
Rock Socket Friction In Drilled Shafts - Its Greater Than You Think - Summary.
By Jorj O. Osterberg
The practice of using side shear resistance in the design of drilled shafts socketed in rock is discussed. In the absence of field test data for the particular rock involved, the designer often neglec
Jan 1, 1991
-
Support Of Structures In Expansive Shale Using Recycled Plastic Piles
By Lance A. Roberts
Expansive soil formations can be found throughout the United States. When subjected to wetting, these formations have the potential to swell and exert large uplift forces on buildings and foundations.
Jan 1, 2010
-
Novel Methods Of Restraining Embedded Retaining Walls
By Abid Adekunte
Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br
Jan 1, 2010
-
-
Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management
By Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Case Histories, Part 1 - Études De Cas, Partie 1 - Jet Grouting Underpinning Of A Building In The Us
By Gustavo E. Armijo
This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose
Jan 1, 2002
-
Effect of Binder Composition on the Secondary Compression of an Artificially Stabilized Soil
By Monica R. Garcia, Antonio Alberto S. Correia, Paulo J. Venda Oliveira
"The aim of this paper is to analyze the creep behavior of a Portuguese soft soil stabilized with binders in one-dimensional conditions, based on oedometer creep tests. The study focuses on the analys
Jan 1, 2015
-
Remedial Method for Collapse Soil Foundation of Mosul Dam
By Arash Khosravifar, Ali N. Ibrahim
"Large areas of Iraq are covered with collapsible soils namely gypsiferous soil which is often used as the foundation soil for structures. In particular, the Mosul Dam foundation is comprised of high
Jan 1, 2017
-
Correlation between Undrained Shear Strength in Dry Deep Mixing Columns and Unimproved Soft Soil
By Stefan Larsson, Jan Ekström, Jennie Kock-Larsen, Håkan Garin
"This paper describes the testing procedure (or protocols) for quality control of dry deep mixing columns in a major ground improvement project carried out in Sweden. Quality control was mainly based
Jan 1, 2015
-
Monitoring Auger Cast in Place Pile Construction and Testing in Hard Clay (c1a730a8-7e87-4cd7-85b2-336e4f7995da)
By Onur Guvener, Kalaiarasi Vembu, C. Vipulanandan
"Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curin
Jan 1, 2017