Skin Friction Of Excavated Piles In Weathered Granite - SynopsisBy K. K. S. Ho
In Hong Kong the design of excavated piles in weathered granite has conventionally been based on a rule-of-thumb which relates the allowable base bearing capacity to the SPT N value, with no allowance
Jan 1, 1996
-
Intelligent Pile-Driving With A Diesel Impact HammerBy Michael D. Justason
This paper describes the technology behind the development of an automated energy control system for a diesel pile hammer. Some background is given on experience using an energy monitoring system on
Jan 1, 2006
-
The Practical Application Of Pile Reuse At Bow Bells House, City Of LondonBy Justin Phillips
The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin
Jan 1, 2008
-
Innovative European Technologies To Accelerate Construction Of Embankment Foundations - Part II: DM, FMI, Mass Stabilization & CSVBy Ali Porbaha
In today's fast-track construction environment, owners are searching for non-conventional technologies to build their projects faster and safer while maintaining traffic flow during construction.
Jan 1, 2002
-
Installation And Testing Of 260 Hollow Core Bar MicropilesBy Jesús E. Gómez
A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n
Jan 1, 2007
-
Underwater Concrete In Drilled Shafts: The Key Issues And Case HistoriesBy Sam X. Yao
In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that h
Jan 1, 2013
-
Environmentally Friendly Geothermal Piles At Keble College, Oxford, UKBy Tony P. Suckling
This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct
Jan 1, 2002
-
Verification of Installation and Performance of ACIP Piles for BridgesBy W. Morgan NeSmith
"The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu
Jan 1, 2017
-
Port Said East Port Project - Deep Diaphragm Walls For The Quay Wall ConstructionBy Mamdouh Hamza
The construction of 1200 m length new quay wall located 1,300 m East of the existing Suez Canal bypass and about 1,000 m south of the Mediterranean shoreline is one of the main projects currently unde
Jan 1, 2002
-
Minipiles And Compaction Grouting For Seismic Retrofit Of Transportation Structures In The New Madrid Fault ZoneBy Steven D. Scherer
The highest earthquake risk in the United States east of the Rockies is along the New Madrid Fault System, which extends for 193 km (120 miles) through the Central Mississippi Valley from northeastern
Jan 1, 2001
-
Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load TestBy Scott M. Mackiewicz
This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T
Jan 1, 2008
-
The Bow, Encana: Design, Monitoring, And Results Of A Deep Excavation In Downtown CalgaryBy Matthew Janes
The new Bow office complex will become the new headquarters of EnCana Corporation, a leading Canadian oil and gas company. The shoring system, encompassing nearly two city blocks and excavated to a d
Jan 1, 2008
-
Sharing of Lateral Loads and Moments in Pile FoundationsBy Andrea Gambi, Giancarlo Olivucci, Maurizio Lenzi
"In the paper a criterion for the evaluation of the sharing of the lateral loads in a piled foundation is presented. It relies on the the compatibility condition between the rotation of the rigid pile
Jan 1, 2005
-
RC Harris Water Filtration Plant Expansion Excavation Support Design, Installation And PerformanceBy Matthew Janes
The RC Harris Filtration Plant, which treats the majority of the fresh water for over 2.5 million Torontonians, is a Canadian Architectural Heritage site demonstrating a classic example of Art Deco A
Jan 1, 2006
-
Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2013
-
Rectification Measures And Restoration Of Distressed Pump FoundationsBy V K. Panwar, Sampat Raj
At a Fertilizer plant located in the southern part of India, 74 numbers of pump foundations have shown non-uniform settlements causing the tilting of pump foundations under self-weight primarily due t
Nov 1, 2022
-
Underpinning and Temporary Earth Retention for the ReTRAC Trench in RenoBy K. Ronald Chapman, Claus Ludwig, Doug Jenevein
"In the spring of 2005 Schnabel Foundation Company completed a $15.2 million Design/Build subcontract to underpin 11 structures, and provide 202,800 square feet of earth retention for the Reno Transpo
Jan 1, 2006
-
Bearing Capacity of Semi-Deep Skirted FoundationsBy Abolfazl Eslami, Samieh Rezazadeh
"Semi-Deep skirted foundations are considered to be a viable option for a variety of onshore and offshore applications. It is necessary to determine appropriate foundation configurations that allow lo
Jan 1, 2017
-
Pullout Capacity of Pile Groups in SandBy S. P. Mukherjee, Smita Tung
"Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i
Jan 1, 2015
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin