Search Documents

  • NIOSH
    Evaluation Of Dust Exposure To Truck Drivers Following The Lead Haul Truck

    By W. R. Reed, J. A. Organiscak

    Haul trucks have the potential to generate large amounts of respirable dust. This respirable dust has been shown to be a health hazard to personnel, especially if it has a high silica content. Lack of

  • NIOSH
    OFR-203-82 An Application Of The Dedicated Wire Technique To Improve Coal Mine Trolley Carrier Phone Communications

    By Robert L. Lagace

    A whole-mine experiment to assess the practical feasibility and utility of the dedicated-wire technique for overcoming poor trolley carrier phone system performance at a large underground coal mine wa

    Jan 1, 1981

  • AIME
    28. Ore Deposits of the Atlantic City District, Fremont County, Wyoming

    By Richard W. Bayley

    The Atlantic City district encompasses several districts and has been previously called by different names, e.g., Atlantic gold district, Atlantic City-South Pass mining district, and Sweetwater minin

    Jan 1, 1968

  • SME
    Precambrian Shield Gold Exploration Trends Detailed

    By James W. Stewart, A. C. Colvine

    Introduction Precambrian shield terrains the world over are experiencing an unprecedented level of concerted exploration for lode gold deposits. Reasons for this include: • The increase in the price

    Jan 12, 1984

  • CIM
    An Approach to Energy Management at Falconbridge Nickel Mines Limited

    By D. M. Doyle

    "A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc. over progressively shorter time peri

    Jan 1, 1979

  • CIM
    A Two-Phase Backfill Approach to Dilution Control at the Doyon Mine

    By Emilie S. Williams

    The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping

    Oct 1, 2004

  • NIOSH
    Bulletin 224 Surface Machinery and Methods for Oil Well Pumping

    By H. C. George

    This bulletin deals with prime movers, power-transmitting machinery, and the surface equipment and methods used to pump oil wells. It does not discuss geological problems nor the methods and equipment

    Jan 1, 1925

  • ISEE
    Blast Vibrations: A Critical Component of Dilution Control at an Underground Mine

    Blast vibration analysis under relatively near-field conditions has been carried out in a narrow-vein underground operation. The objective was to characterize the vibration signal (particle accelerati

    Jan 1, 2003

  • ISEE
    Drilling and Blasting Trends into the 21st Century

    By John Dean Smith

    In order to discuss problem solving techniques for the future. we must first review the past. This paper will discuss the drilling and blasting problems and techniques that were used by .Imax Coal in

    Jan 1, 1991

  • IOM3
    Mine backfilling to limit surface subsidence: a case history

    By P. H. Carr, G. G. Marino, K. A. Patel

    Extensions to a correctional institution at Wabash Valley, Indiana, required development over abandoned coal-mine workings, at 90 m depth, where subsidence was possible at surface. Backfilling of the

    Jun 19, 1905

  • SME
    Regrind Mills: Scaleup Or Screwup

    As ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind

    Jan 1, 2011

  • SAIMM
    Copper Recovery Using Leach/Solvent Extraction/Electrowinning Technology: Forty Years Of Innovation, 2.2 Million Tonnes Of Copper Annually

    By G. A. Kordosky

    The concept of selectively extracting copper from a low-grade dump leach solution followed by stripping the copper into an acid solution from which electrowon copper cathodes could be produced occurre

    Jan 1, 2002

  • NIOSH
    OFR-167-81 Pre-Mining Identification Of Hazards Associated With Coal Mine Roof Measures

    By Ronald W. Stingelin

    The geology of the roof of the Pittsburgh coal bed was studied and mapped in nine contiguous counties containing the bulk of the remaining reserves of this coal bed in the northern Appalachian Coal Ba

    Jan 1, 1979

  • NIOSH
    IC 8353 New Concept Of Electron Detachment For Air In Negative Corona At High Temperature

    By C. C. Shale

    Current-voltage relationships for air at high temperature in negative corona are compared with relationships predicted by theory. Deviations are discussed. Eased on the latest theoretical concept of e

    Jan 1, 1967

  • AUSIMM
    Role of Ore Preparation During Chrysotile Manufacturing

    Principles of management in ore preparation before process of enrichment of chrysotile ores are discussed. The formulas, which were tested in industrial conditions, are offered, which may be used for

    Dec 6, 2010

  • CIM
    Data Acquisition from an Industrial Zinc Flotation Circuit

    By A. Wright, P. Lacombe, R. del Villar, D. Hodouin, C. Sepulveda

    "The data acquisition from industrial plants is a fundamental step for process modelling in process optimization, process analysis and automatic control.The introduction, some years ago, of modern dis

    Jan 1, 1991

  • AUSIMM
    Distribution of Inorganics and Gold on the External and Internal Surfaces of Activated Carbons from CIP Plants

    By Woodcock J. T, Sparrow G. J, MacRae C. M

    The external urfaces and interiors (as polished sections) of particles of coconut hell and extruded peat activated carbons taken from everal Australian carbon-in-pulp operations were examined with an

    Jan 1, 1988

  • NIOSH
    RI 7194 Preparation Of Anhydrous Chromous Chloride

    By Robert L. de Beauchamp

    The Bureau of Mines designed a chlorination apparatus to prepare CrCl2 free of CrCl3 by the direct reaction of chlorine and chromium. Equipment and procedures were developed for routine preparation of

    Jan 1, 1968

  • IOM3
    Drill productivity evaluation by monitoring

    A production drill rig at a site in Sweden was equipped with a monitoring system to estimate production statistics. Drill running times, drill hole depths, penetration rate, rotation speed, thrust, ai

    Jun 19, 1905

  • AUSIMM
    Productivity Improvement Without Capital Expenditure - Optimising Machine and Labour Utilisation

    The history of mining is rightly proud of its achievements in improving productivity and cost improvements over the years. No matter what measure is used, tonnes per manhour, cost per tonne, etc vast

    Jan 1, 1999