Search Documents

  • AUSIMM
    The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper Concentrator

    By D R. Carr

    The installation of the Flotation Capacity Project flow sheet in the copper concentrator at Mount Isa Mines Limited has recently been completed. The project involved increasing the flotation capacity

    Jan 1, 2003

  • AUSIMM
    Simulation investigation of flow patterns and feeder loads at hopper/feeder interface

    By J Guo, K Williams, J Y. Guo, A W. Roberts, M Jones, B Chen

    Numerical simulations using the discrete element method (DEM) were carried out to investigate the flow patterns and stress field redistribution at the hopper and feeder interface. The influences of di

    Jul 24, 2017

  • AUSIMM
    Comparison of Rhyolite-Hosted Gold Deposits in the Coromandel (New Zealand), and Nevada (USA) Epithermal Gold Provinces

    Rhyolitic rocks are volumetrically significant in the eastern part of the Coromandel gold province, yet deposits hosted by rhyolite (Kapowai, Broken Hills, Neavesville, Wharekirauponga and Waihi Beach

    Jan 1, 1996

  • SME
    West Elk Mine: The Conversion From An Exhausting To A Forcing Ventilation System

    By J. C. Poulos

    The West Elk Mine is located near Somerset, Colorado approximately 70 miles southeast of Grand Junction, Colorado and 72 miles southwest of Glenwood Springs, Colorado on state highway 133 (Figure 1).

    Feb 27, 2013

  • NIOSH
    RI 3122 Tests on Brick Klins Fired With a Stoker

    By R. R. Falier, W. E. Rice

    "PURPOSE OF REPORTThis paper presents the results of a series of tests made by the U. S. Bureau of Mines in cooperation with The Ohio State University Engineering Experiment Station as part of an inve

    Aug 1, 1931

  • AUSIMM
    Analysis of jig behaviour in coal preparation plants in China

    A wide-ranging base of jig data was collected from various types of commercial jigs in 9 coal preparation plants in China, and a complete data analysis was made. It was found that the sharpness ofsepa

    Jan 1, 1986

  • NIOSH
    IC 8178 Three Waterflooding Projects And A Pressure-Maintenance Project In Butler And Cowley Counties, Kans., 1963

    By Kenneth H. Johnston

    This report describes in detail three waterflooding projects and a pres-sure-maintenance project in Butler and Cowley Counties, Kans., that will be visited on the 1963 annual spring tour of the Kansas

    Jan 1, 1963

  • CIM
    Leaching/flotation processing of complex sulphide ores

    By Franciszek Letowski

    "Recovery of precious metals associated with a sulphidic matrix has an important economic effect on complex sulphide ore treatment. Because a significant portion of the silver and gold associated with

    Jan 1, 1987

  • AUSIMM
    Tubular Steel Headframe for Winze Sinking at North Broken Hill Ltd., Broken Hill

    Winzes are usually sunk 9 ft. 6 in. long by 6 ft. 0 in. wide and are divided into two compartments, 4 ft. 0 in. by 5 ft. 0 in. inside the timbers. The general practice is to sink the winze to a depth

    Jan 1, 1941

  • NIOSH
    OFR-40-80 Effectiveness Of Inclined Roof Bolts In Coal Mines

    By Madan M. Singh

    This report presents the results of an investigation of inclined roof bolts, anchored over pillars, in room-and-pillar coal mines susceptible to shear failures of the roof. Although the field data do

    Jan 1, 1978

  • AIME
    Institute of Metals Division - Solid Solubility of Magnesium in Some Lanthanide Metals

    By R. R. Joseph, K. A. Gschneidner

    The solid solubility of magnesium in the close-packed modifications of lanthanum, cerium, praseodymium, neodymium, gadolinium, dysprosium, and lutetium was determined from approximately 250°C to the e

    Jan 1, 1965

  • SME
    Excavation Support And Groundwater Control Using Soil-Cement Mixing Wall For Subway Projects

    By David S. Yang, Osamu Taki

    The innovative Soil-Cement Mixing Wall Technique, developed independently in Japan, consists of mixing in-place soils with cement grout using multi-axis augers and mixing paddles to construct overlapp

    Jan 1, 1989

  • AUSIMM
    A Robust Chemically Enhanced Electrostatic Separation Technology

    A Robust Chemically Enhanced Electrostatic Separation Technology Physical separation processes such as gravity, magnetic and electrostatic separations are extensively used in heavy minerals separatio

    Sep 13, 2010

  • SME
    Single Bore Solution For Transit Tunnels

    By Verya Nasri

    The use of a single tunnel boring machine (TBM) tunnel of approximately 12 to 13 m (40 ft to 43 ft) diameter for transit systems to house both light rail or subway tracks in a stacked configuration is

    Jan 1, 2010

  • AUSIMM
    Chemical Environment in Australian Lead-Zinc Flotation Plant Pulps: I. PH, Redox Potentials, and Oxygen Concentrations

    Up to 19 chemical parameters were studied in flotation pulps in six Australian lead-zinc concentrators with the aim of obtaining a better understanding of the nature of, and changes in, the chemical e

    Jan 1, 1970

  • SAIMM
    Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine

    By B. P. Watson

    Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i

    Jan 1, 2014

  • AUSIMM
    21st Century Bond

    By M Sherman

    The challenge facing the engineering provider is to calculate throughput rates when faced with disparate specific energies calculated by different testing methodologies. Typically, an ownerÆs team wou

    Aug 12, 2013

  • NIOSH
    RI 5991 Investigation Of Mercury-Antimony Deposits Near Flat, Yukon River Region, Alaska ? Summary And Introduction

    By R. P. Maloney

    Since mining operations began in 1900, Government geologists and mining men have periodically recorded the presence of the minerals of mercury and antimony in the extensive gold placer deposits near F

    Jan 1, 1962

  • AUSIMM
    Mount Isa Cut and Fill (MICAF) Stoping

    ABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng

    Jan 1, 1968

  • AUSIMM
    The Canadian Mining Industry - Corporate Development Strategies for the 1990s

    Currently in Canada there are 15 major mining companies with a minimum of $1 billion in market capitalization or net private value. This group forms the core of an important sector for Canada. The

    Jan 1, 1989