Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Affect Of Surface/Ground-Water Interactions On Zinc Concentrations In Groundwater Along Silver Creek, Summit County, UtahBy Kerry Gee, Gary Colgan, James Fricke
Introduction Elevated zinc concentrations are observed in groundwater within alluvium adjacent to Silver Creek east of Park City, Utah. The study area is located in a small valley one and one-half
Jan 1, 2005
-
Geologic Setting And Gold Grade Patterns Of The El Sauzal High-Sulfidation Gold-Silver Deposit, Chihuahua, MexicoBy S. Weiss, E. Espinoza
The El Sauzal gold-silver deposit is a high-sulfidation, epithermal precious-metals deposit hosted by an east-dipping sequence of dacitic and rhyolitic pyroclastic and debris-flow units of probable Ol
Jan 1, 2007
-
Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - SynopsisBy Sanjeev Malhotra
The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins
Jan 1, 2000
-
Tunnel blast drill hole surveying – Benefits and MethodologiesBy G. Adderley, A. Wetherelt
The problems of poor drilling in underground operations have been highlighted on many occasions. Incorrect collaring and poor angular deviation can all lead to an increased block size, dilution, over-
Jan 1, 2009
-
Steam-Fluidised Bed Drying and its Significance for Electricity Generation and Gas Production in the Latrobe ValleyCurrently raw brown coal is fired in the Latrotx; 'ahcc th,iki~, Lanying with it two major penalties, (a) boiler efficiency of 65 - 70 per cent (in terms of GCV), (b) much higher boiler cost th
Jan 1, 1992
-
Capacity Of Piles And Settlement Of Pile FoundationsBy M. Mets
Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo
Jan 1, 2000
-
Design And Development Of A Mobile Mining MachineBy G. L. Dollinger, J. P. Kindsvater, J. A. Gibson
DESIGN AND DEVELOPMENT OF A MOBILE MINING MACHINE INTRODUCTION Until recently, developing tunnels in hard rock has been accomplished either by the drill and blast method or by using large tunnel bo
Jan 1, 1985
-
Building the Unified Comminution ModelBuilding the Unified Comminution Model The Unified Comminution Model (UCM) was formulated with the vision of bringing all comminution models onto a common base. The structure of the model relies on k
Sep 13, 2010
-
The Use Of Computational Fluid Dynamics And Discrete Element Modeling To Understand The Effect Of Cell Size And Inflow Rate On Flotation Bank Retention Time Distribution And Mechanism Performance.By Richard Peaker, Jens Lichter, Alexander V. Potapov
The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a f
Jan 1, 2007
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997
-
Static-Load Hydraulic Piledriving: An Alternative System For Noise & Vibration-Sensitive Applications ? IntroductionBy Robert A. Field
Static-Load Piledriving systems utilize hydraulic push to advance piles into the ground. Dynamic systems (ie. hammers and vibratory equipment) utilize impact, or vibration, to advance the piles. S
Jan 1, 1995
-
Blasting Overhangs Close to a Vibration Sensitive StructureBy R. Franfield
This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked
Jan 1, 2009
-
A Sound Level Survey in the New South Wales Coal Mining IndustryThe mechanization of the coal industry in New South Wales involved the introduction of large face and transport machines. The trend is towards still higher capacity units with .greater horsepower and
Jan 1, 1974
-
Roger Bullivant Cone PileBy R. A. Bullivant
Roger Bullivant Piling Limited has started 1992 with the introduction of the CONE PILE into its range of precast concrete foundation techniques. Since the establishment of its Piling Division ten
Jan 1, 1992
-
An Investigation into the Relative Efficiencies of Common Brattice Cloths in use in Australian Coal MinesCommon brattice cloths in use in Australian coal mines are compared by permeability measurements. The respective advantages of twill weave and tarpauling* weave cloths are listed, and the improvements
Jan 1, 1959
-
Platinum Promotion Of Au/Al2O3 Catalysts For Glycerol Oxidation: Activity, Selectivity And Deactivation ? SynopsisBy M. Royker
Gold has been demonstrated as a possible catalyst for oxidation reactions. Some evidence for a possible promotion effect of platinum has also been recorded. The influence of platinum as promoter for A
Jan 1, 2012
-
GIS as a Mine Rehabilitation Tool - Examples from Wangaloa Coal MineBy D Craw, P Whigham, C Rufaut
Geographic Information Systems (GIS) are computerised management systems for spatial data, offering improved data management, extensive data manipulation techniques and greater understanding of data.
Jan 1, 2004
-
New York Paper - Some Factors Affecting the Elimination of Sulfur in the Basic Open-hearth Process (with Discussion)By C. C. Miller, A. R. Belyea, C. H. Herty, E. B. Burkart
The removal of sulfur from steel has been studied by many investigators, but the quantitative relationships between the factors involved have not been determined. This is undoubtedly due to the number
Jan 1, 1925
-
Innovative Roof Support Systems For The Next Generation Of MiningBy S. C. Tadolini
Roof support systems have evolved from standing posts and timbers to a generation termed ?big nails? where steel bars are inserted into boreholes and anchored with expansion shells and/or resin cartri
Jan 1, 2012
-
Road Haulage of Ore by Peko Mines N.L.With the proving of a mineable orebody at Orlando in May 1961, Peko Mines N.L. was faced with the decision of whether to mill the ore on site or to haul it 25 miles to central facilities at Peko. Orla
Jan 1, 1966