Search Documents

  • ISEE
    Estimation of Rock Fragmentation in Bench Blasting Using Numerical Simulation

    By Sang Ho Cho, Masaji Kato, Masaaki Yamamoto, Masaaki Nishi, Katsuhiko Kaneko

    This paper presents a numerical simulation method to predict rock fragmentation and to verify a fracture mechanism by bench blasting. The rock fragmentation, which has been used as a means of the inde

    Jan 1, 2002

  • NIOSH
    IC 7688 Black Hills Mineral Atlas, South Dakota: Part 1 (In Two Parts) ? Introduction

    The Black Hills Mineral Atlas briefly summarizes all pertinent date available on the mines and mineral deposits in the Black Hills that have been explored, developed, mined, or located. The purpose

    Jan 1, 1954

  • DFI
    Earth Retention Using Augered Cast-In-Place Piles - A. Introduction - 1. Applications

    By William S. Heckman

    a. When to use: high surcharges, vertical capacity required, limit noise and eliminate vibrations, low headroom, eliminate vibration induced settlements. b. Advantages: eliminates impact noise and

    Jan 1, 1997

  • AIME
    PART I – Papers - Irradiation-Induced Densification of Pyrolytic Carbon

    By J. C. Bokros, A. S. Schwartz

    The irradiation-induced densification of pyrolytic carbon has been shown to take place by a simple first-order rate process. The values of the densification constant, kd, for isotropic carbons are 1.0

    Jan 1, 1968

  • CIM
    Advances in Cobalt Processing

    Cobalt mostly occurs as a minor, but valuable, constituent in most nickel and a few copper ores, however it is not generally found alone in commercially viable deposits. Its concentration and extracti

    May 1, 2009

  • NIOSH
    RI 3429 Cooperative Fuel Research Motor-Gasoline Survey, Summer 1938 - Introduction

    [This is the sixth in a series of reports on properties of commercial motor fuels, made in accordance with a cooperative Agreement between the Cooperative Fuel Research (C.F.R.) Committee and the Bure

    Jan 1, 1938

  • DFI
    Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission Line

    By Suk han Jang

    This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This

    Jan 1, 2007

  • SME-ICGCM
    Changes In The Seismic Properties Of The Cover Produced By Longwall Mining

    By Guoqi He

    Common offset seismic data collected over two active longwall panels at different stages of mining reveal that significant arrival time delays are produced in reflections from different levels within

    Jan 1, 1989

  • SME
    Ventilation requirements for uranium mines

    By C. Gherghel

    The planning and operation of ventilation network systems for uranium mines require special considerations since ventilation is the primary technique of controlling ambient concentrations of radon pro

    Jan 1, 2009

  • AIME
    Geophysics - Resistivity Method in Groundwater Exploration, City of Gunnison, Colo

    By C. E. Melbye

    A serious problem confronted the city of Gunnison early in 1958 in that, for a few months during each spring runoff, the water supply derived from the Gunnison River became polluted to an unsafe point

    Jan 1, 1961

  • CIM
    Doing More with What We Already Know – Improving the Efficiency of Minerals Processing

    By Joe Pease

    "The demand for minerals and metals is increasing. Head grades of ore bodies are dropping. Remaining ores are becoming finer grained, more complex, and more logistically challenging. Mineral processin

    Jan 1, 2015

  • DFI
    Load Testing Of Steel Sheet Piling Driven With A Vibratory Hammer

    By Drew Floyd

    Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi

    Jan 1, 1989

  • AUSIMM
    An Analysis of the Performance of a Ball Mill Rake Classifier Comminution Circuit

    An extensive series of tests was carried out on a ball mill-rake classifier circuit in the New Broken Hill Consolidated Ltd. concentrator. The data were used to develop a mathematical model of the ope

    Jan 1, 1967

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • AUSIMM
    Grinding ù The Primary Conditioner

    By P Steinier

    Most operations, when considering their comminution circuit, are primarily concerned with achieving the desired particle size distribution to obtain adequate liberation for the separation process, at

    Jan 1, 2004

  • SME
    Copper Hydrometallurgy – Evolution and Milestones

    By Nathaniel Arbiter

    In contrast to pyrometallurgy's 6000year history in metals production, hydrometallurgy is of relatively recent origin. The earliest reference to it was in the 16th century, with the first applica

    Jan 1, 1994

  • SAIMM
    The Production And Application Of Ferrosilicon In The Mining Industry

    By P J. Grobler

    The current commodity boom is depleting the ore bodies at a rate not seen in the past. As the existing ore bodies get depleted, only the more inferior bodies are left for exploitation. This places an

    Jan 1, 2006

  • SAIMM
    Implementation Of An Alternative Matte-Level Measurement Solution At Lonmin Marikana Smelter Division For Improved Process Monitoring

    By T. J. Goff

    Keywords: accurate control, matte level, smelting operations, process control, tapping, sounding bar, electromagnetic measurement [ ] Accurate control of matte levels during primary matte smelting

    Jan 1, 2011

  • ISEE
    Interpreting the Accuracy and Validity of Seismograph Recordings

    By John E. Wiegand

    "We will attempt to explain the basic workings of a modern seismograph and how the recorded data can be interpreted, not only for determining compliance to the regulations, but also in determining whe

    Jan 1, 1992

  • ISEE
    Burn Cut Pull Optimization through Varying Relief Hole Depths

    By Michael Allen, Paul Worsey

    In underground blasting, the pull of the initial cut is the limiting factor for the success of the rest of the round. By improving the pull of the first cut, a critical step is made towards improving

    Jan 1, 2015