Search Documents

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • AUSIMM
    Ventilating the 1,480 Ft Level Drive at the South Mine, Broken Hill

    The problem of ventilating an advancing drive which finally reached 5,550 ft from the fresh air base in rock with virgin temperature of 83°F was solved economically by the use of two 15 h.p. elec

    Jan 1, 1965

  • AUSIMM
    The Heavy Media Separation Coal Washing Plant at Lidsdale, New South Wales

    The Heavy Media Separation plant operated at Lidsdale siding, eight miles from Lithgow, by the N.S.W. Mining Co. is a product of the Western Machinery Company, of D.S.A.This mill, designed to use fine

    Jan 1, 1954

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • DFI
    Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - Introduction

    By Michael W. Neill, O&apos

    The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec

    Jan 1, 1989

  • NIOSH
    Economic Consequences of Mining Injuries

    By J. Girard-Dwyer, T. Camm

    Direct costs such as medical, legal, administrative, and worker’s compensation costs, property damage, lost earnings, and lost benefits are typically used to compute the economic impacts of occupation

  • SME
    NATM Design For Stanford Linac Coherent Light Source Tunnels

    By Jonathan Taylor, Irwan Halim, Frederick (Rick) Vincent

    The new underground facilities for the LINAC Coherent Light Source project at the Stanford Linear Accelerator Center in Menlo Park, CA, are constructed in very weak sedimentary rock interspersed with

    Jan 1, 2007

  • IIMP
    Estilos de mineralización en el Complejo Pasco

    By Hebert Arias, Christian Mendoza, Mervin Tapia

    El Complejo Pasco —ubicado en la Cordillera Oriental de los Andes de la sierra central del Perú, en el distrito de San Francisco de Asís, provincia y departamento de Pasco— está constituido por las un

    May 22, 2019

  • SME
    Evaluation Of The Drum Friction Test For Determining The Fire Resistance Of Conveyor Belts

    By J. H. Rowland

    The Mine Improvement and New Emergency Response Act of 2006 (MINER Act) amended the Federal Mine Safety and Health Act of 1977 to improve the safety of mines. The MINER Act established a Technical Stu

    Jan 1, 2011

  • DFI
    The Analysis And Computation Of Soil-Pile (Wall) Interaction For Deep Excavation Of High-Rise Building

    By Lu Peiyan

    A computation model of soil-pile (wall) interaction under lateral loading is presented in this paper. The model has been applied to some engineering projects, and the comparison between computation re

    Jan 1, 1991

  • CIM
    Novel Processes for Treatment of Syncrude Fine Transition and Marine Ore Tailings

    By X. S. Yuan

    With the production increase of Oil Sand in Fort McMurray Alberta, more efficient tailings disposal has become a priority for Syncrude Canada Ltd. A lot of work on tailings research and development ha

    Jan 1, 2006

  • SAIMM
    4.2 Woods -Quality Control Procedures at Gold Fields Ghana Limited, Tarkwa Mine

    By Reginald N. Boryor, Steven D. Woods

    1.0 Introduction ?Low grade, high tonnage, open pit gold mine. ?Gold bearing Tarkwaian conglomerates. ?Reverse Circulation percussion drilling (25m X 25m grid). ?Composite 1m intervals, logged a

    Jan 1, 2005

  • AUSIMM
    Swamp Works – A New Approach to Develop Space Mining and Resource Extraction Technologies at NASA’s Kennedy Space Center: Prospecting, Excavation, Load, Haul and Dump for In Situ Resource Utilisation

    By A J. Nick, I I. Townsend, J M. Schuler, J D. Smith, R P. Mueller, L Sibille, K Leucht, J J. Fox

    The first steps for in situ resource utilisation (ISRU) on target bodies such as the Moon, Mars and near-Earth asteroids (NEA), and even comets, involve the same sequence of steps as in the terrestria

    Nov 4, 2015

  • DFI
    Reinforcement of Existing Deep Foundations with Micropiles

    By Mauricio Terceros, Martin Achmus, Freddy Lopez

    The massive use of deep foundations had a remarkable influence in the building industry in the 20th century. Piles and micropiles made possible to erect thousands of civil structures around the world,

    Jan 1, 2018

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • SME
    Effect Of Longwall Face Advance On Spontaneous Heating In Longwall Gob Area - Preprint 09-053

    By L. Yuan

    To reduce fire hazards from spontaneous combustion of coal in longwall gob areas, a series of computational fluid dynamics (CFD) simulations were conducted by National Institute for Occupational Safet

    Jan 1, 2009

  • SME-ICGCM
    Technical Assessment of Subsequent Burdens due to Hard Coal Mining

    By Axel Preusse

    On the basis of the Law on Financing Hard Coal Mining dated 28 December 2007, the subsidized German hard coal mining industry will be shut down to the end of the year 2018 in a socially acceptable man

    Jan 1, 2008

  • NIOSH
    MLA 87-83 - Mines And Prospects In The Seafoam Mining District, Custer County, Idaho ? Summary

    By Nathan T. Lowe

    This report updates an accounting of mines and prospects in the Seafoam mining district, Custer County, Idaho, begun during mineral appraisal of the Idaho Primitive Area. Thirty-two mine and prospect

    Jan 1, 1983

  • SME
    Long term demand for construction raw materials and the implications for minerals provision; the case of sand and gravel in the Netherlands

    By M. van Elp, R. Saitua Nistal, P. J. M. Groot

    Demand for construction raw materials depends on investment in housing, other buildings and infrastructure. The provision of these materials requires early knowledge of future trends in construction i

    Jan 1, 2011

  • SME
    The Effect Of Rock Type And Tunneling Machine On Bulk Material Handling Parameters

    By Donald E. Raab, Lee W. Saperstein

    INTRODUCTION The Premise Not much time has to be spent in a tunneling project to realize the tremendous interdependence that exists among the various unit operations. The research that is to be

    Jan 1, 1974