Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine EntriesBy Asmaa Yassien
Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column
Jan 1, 2002
-
Floor Heave in Shallow Room-and-Pillar MiningBy André Zingano
This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40
Jan 1, 2002
-
Design And Planning Of Lower Seam Longwall GateroadsCase study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be
Jan 1, 1995
-
Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)By Winton J. Gale
The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o
Jan 1, 1992
-
Application of the Coal Mining Roof Rating System in South African CollieriesThis paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert
Jan 1, 2001
-
Analysis Of The Seam Inclination Effect On Roof StabilityBy Hanjie Chen
Mining experiences have shown that in a pitching seam, roof behavior is significantly different from a flat seam. Uphill mining usually experiences more roof problems than downhill mining. Based on a
Jan 1, 2000
-
Roof Instability of Longwall Face at Ikeshima CollieryBy Kikro Matsui
Longwall mining 1s more productive in comparison to other methods but requires particular conditions for its effective use This paper relates to longwall roof instability at Ikeshima Colliery In order
Jan 1, 1997
-
Jointing Effects On Pillar StrengthBy Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery RoomBy Tom Wynne
In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre
Jan 1, 1993
-
The Use Of Geologic Modeling In The Prediction Of Adverse Roof ConditionsBy Edward S. Custer
Recent investigations of mine roof falls have demonstrated that roof failures are generally associated with geologic conditions. The roof falls can be predicted by using the techniques of depositional
Jan 1, 1981
-
Mining-Induced Stress Measurement With Hydraulic Borerole Pressure CellsBy Paul A. Lu
This paper proposes an unconventional, simple, and practical method of measuring mining-induced around stresses with hydraulic borehole pressure cells. The method is a direct ground stress measuring t
Jan 1, 1984
-
Full-face Pressure Monitoring in Medium-Weak Roof ConditionBy Syd S. Peng
Full-face shield leg pressures in a longwall panel for a three-month period were collected and analyzed. The pressure data were presented in the following forms: full- panel full-face shield pressure,
Jan 1, 1997
-
The Design of Room and Pillar Mining Systems in the UKBy Graham Daws
State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R
Jan 1, 1998
-
Stability Behaviour Of Coal Mining Tunnels With Different SupportsBy B. T. Wells
This work concerns the stress fields encountered around mining tunnels. A critical review is undertaken of the various analytical assessments of the support requirements for mining tunnels. Comments a
Jan 1, 1981
-
Extended Cut Out Distances In Continuous Miner Sections In South African CollieriesBy Ismet Canbulat
The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and
Jan 1, 2000
-
The Duncan Method of Partial Pillar Extraction at Tasman MineBy Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
Field Testing of the Fully Grouted Thrust Tensioned BoltsBy Kot Unrug
Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati
Jan 1, 2002
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain PillarsBy James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
Surface Movement of Super-wide Longwall Panels Using Top-coal Caving MethodBy Cao Shenggen
Experiences in the developed countries have shown that continuous increase of panel width (or face length) is one of the major technical trends for high production high efficiency mines. Increasing th
Jan 1, 2003
-
Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral ApproachBy Zhanjing Yu
In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve
Jan 1, 1993