Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • SME-ICGCM
    Outburst Control in Underground Coal Mines,

    By Floyd D. Varley

    Outbursts, the sudden and violent out- pouring of material into mine openings, is a ground control problem increasingly encountered in the United States as deeper seams are developed. Outbursts, cause

    Jan 1, 1986

  • SME-ICGCM
    A Statistical Analysis Of Falls Of Ground In South African Collieries

    By Andre Vervoort

    Falls of ground, such as falls of roof and sidewall collapses, are a major cause of fatalities and injuries in South African collieries. Based on information obtained from the accident reports of the

    Jan 1, 1990

  • SME-ICGCM
    Subsidence Prediction From The Beginning - Collie Coal Basin (Western Australia) (dce863fc-d411-440e-9991-cfa750adc084)

    By Ian Misich

    Surface subsidence resulting from "total extraction" of coal in the Collie Basin first occured in 1987 when Western Collieries Ltd trialed the Wongawilli mining method. Because very little quantitativ

    Jan 1, 1992

  • SME-ICGCM
    A Casting Method For Artificial Rock Specimens

    By Da Zhao Gu

    An important problem in rock engineering is to control the properties of artificial rock. A compaction technique for casting artificial rock specimens with controlled properties is described, i.e. usi

    Jan 1, 1992

  • SME-ICGCM
    Evaluating Coal Pillar Mechanics Through Field Measurements (a8e6d7f0-5b83-40bc-b63c-ddaae2b3a526)

    By Anthony Iannacchione

    Designing coal pillars to provide resistance against overburden loads has long been an aim of rock mechanics engineers. The need for accurate pillar strength models has become more urgent as greater o

    Jan 1, 1992

  • SME-ICGCM
    Sub-Surface Cracks Due To Disc Cutter Spacing For Improved Rock Breakage And Ground Control (9409c703-a463-4470-b9b9-4f86b64581d4)

    By N. I. Aziz

    The importance of using disc cutters for rock excavation is reflected by their wide application in hard rock cutting machines such as tunnel boring machines and raise borers. The forces involved in th

    Jan 1, 1992

  • SME-ICGCM
    Preventing Roof Fall Fatalities during Pillar Recovery: A Ground Control Success Story

    By Michael Gauna, Christopher Mark

    "For decades, pillar recovery accounted for a quarter of all roof fall fatalities in underground coal mines. Studies showed that a miner on a pillar recovery section was at least three times more like

    Jan 1, 2016

  • SME-ICGCM
    Mining Geotechnical Benchmarking

    By Vincent A. Scovazzo

    Benchmarking is a business management process that seeks improvement through the study and reapplication of practices conducted by industry leaders. This discussion presents objectives and organizatio

    Jan 1, 2000

  • SME-ICGCM
    Integration Of CAD-Based Mine Planning And Subsidence Engineering Systems

    By Andrew P. Jarosz

    The present computerized mine planning systems use CAD-like and Data Base Management System (DBMS) environments for the handling of numerical, textural, and graphical data. These two environments are

    Jan 1, 1995

  • SME-ICGCM
    Coal Pillar Strength Based On The Ground Reaction Curve - A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME-ICGCM
    A Simple Method Of Measuring Rock Fracture Toughness Using The Brazilian Test Method

    By H. Guo

    There are a number of methods available for the determination of the fracture toughness of rock. Some of the most recognised methods include the hollow pressured cylinder, the short-rod, the chevron -

    Jan 1, 1992

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004

  • SME-ICGCM
    Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)

    By C. Dinis da Cama

    In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat

    Jan 1, 1984

  • SME-ICGCM
    Effects Of Subsidence On Steep Topography And Cliff Lines

    By Don Kay

    A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Research,

    Jan 1, 1992

  • SME-ICGCM
    A Method For Assessing The Potential Of Mine Subsidence At Abandoned Mine Sites Through The Assistance Of Finite Element Modeling

    By Richard E. Bischke

    Computer assisted finite element model analysis, originally developed to study stress distributions in aircraft, has been modified into a versatile mining program, that can be used to assist the engi

    Jan 1, 1984

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • SME-ICGCM
    Surface Subsidence. in Longwall Mining--A Case Stud

    By R. D. Yancich

    A case study of longwall mining surface subsidence was performed at a mine in Southwestern Pennsylvania. The mine operated in the Pittsburgh coal seam which averaged 70-72 inches with 6-8 inches draw

    Jan 1, 1984

  • SME-ICGCM
    An Improved Technique of In-Situ Measurement Of Fracture Zones Surrounding Gateroads

    By B. G. D. Smart

    An understanding of the nature of yield zones surrounding coal mine excavations is fundamental to the design of mine support systems. Various methods have been designed for investigation of undergrou

    Jan 1, 1984

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995